Not everything is fluff re: LAC.  I found the following interesting comments about a training program offered for potential workers at Thacker Pass on page 3 of the July 2020 Newsletter on the company web page.  It shows a commitment to developing skills in people who will then be qualified to work for LAC out at Thacker Pass... and is an outreach program in coordination with Great Basin College:

_____________________________________________________________________________

BUILDNV CORE CONSTRUCTION TRAINING PROGRAM ON TRACK TO LAUNCH THIS SUMMER


The BuildNVCore Construction Training Program is an 80-hour program designed to train workers in construction, building maintenance, related trades in our communities, and career technical education, helping to address some muchneeded workforce challenges. BuildNVis closer to launching this summer as a result of a recent, generous $41,607 grant awarded by Nevada STEM Networks! Local, certified instructors have also been identified. Humboldt and Pershing County community members interested in beginning a career in construction will soon be able to attend one of the BuildNVcourses offered through Great Basin College (GBC).  The program will provide students with the basic skills needed to enter the construction workforce upon completion. Core curriculum topics will include basic safety, basic math, communication skills, introduction to construction drawings, and OSHA 10 certification.


Recognizing the need for expanding the skilled trades workforce in our region, this program was initiated through the efforts of Lithium Nevada, Northeastern Nevada Regional Development Authority, Great Basin College, JOIN, Inc. and Nevada Builders Alliance.  It will play an important role in helping to fill the roughly 1000 jobs required to build Thacker Pass and the nearly 300 permanent positions necessary to operate the facility.

__________________________________________________________________________

Read the entire article on the Newsletter section of the company homepage.

Join the conversation about Lithium Americas.

Reply

Replies

  1. Page 5 of the same document talks about how the lithium clay at Thacker Pass is to be processed:

    HANDLING SULFUR AND SULFURIC ACID SAFELY TO PROCESS LITHIUM ORE
    Mining the ore at Thacker Pass will be small in scale relative to Nevada’s larger mines.  Under the proposed mining plan, Lithium Nevada’s contract miner, Sawtooth Mining, will use one hydraulic excavator and several 100-ton dump trucks to excavate and move the soft lithium clay ore from an open pit, which is no more than 400 feet deep.  Once mined, the ore will be made into a slurry and upgraded using common mining equipment called ‘hydrocyclones’.  This simple process uses water to remove the parts of the ore that contain very little lithium and works to reduce overall throughput of the material into the plant.  The upgraded slurry then goes through sophisticated processing on site to ultimately produce the ultra-pure lithium compounds required by the lithium battery industry.

    I just want to draw attention of all to that last sentence: "The upgraded slurry then goes through sophisticated processing on site to ultimately produce the ultra-pure lithium compounds required by the lithium battery industry."

    Of course that fits right into the scenario painted elsewhere about how Thacker Pass is a perfect fit for Tesla.   Maybe, maybe not.  I think that trying to predict what Elon Musk will or will not due is lke trying to build the Colliseum on quick sand.  A very risky business.  The better point is that the product proposed by LAC to be produced from Lithium Clay mined at Thacker Pass is, indeed, the "ultra-pure lithium compounds required by the lithium battery industry"... whether the buyer of those ultra-pure lithium compounds is Tesla or some other company.  The fact is Thacker Pass will have a very valuable product to sell on the open lithium market.. a plus for any LAC investor.

     

    1. Page 9 from the same document also begs your attention since it addresses both the DFS and the possibility of a JV with some other company as a future financing move for Thacker Pass and a short comment about the Environmental Impact Study (EIS) for Thacker Pass.