Okiedo - check out the below for additional info on the proposed clay leaching process and TP overall.  Go LAC!!

 

https://eplanning.blm.gov/public_projects/1503166/200352542/20024530/250030734/TP_Scoping_Report_2020-05-11_FINAL.pdf

 

 

https://eplanning.blm.gov/public_projects/1503166/200352542/20022646/250028850/TP_DEIS_Apx%20B_Mine%20Plan_508.pdf

 

Join the conversation about Lithium Americas.

Reply

Replies

  1. In regards to the first link:  PROPOSED THACKER PASS LITHIUM MINE PROJECT ENVIRONMENTAL IMPACT STATEMENT PUBLIC SCOPING REPORT     That is a much more current document, dated 11 May 2020

    The figure that stands out immediately in this second report, and it probably is only a conincidence, is that the Thacker Pass Mine and Reclamation Plan of Operations (PoO) is listed as encompassing 10,468 acres.  Same "10,000 acres" that was mentioned by Elon Musk back on "Battery Day" or is it a different 10,000 acres.  My own guess:  probably just a coincidence, but still.....

    The Exploration Plan of Operations (PoO) is another 7,727 acres, according to this document.

    For anyone still confused by just where the Thacker Pass facility is located then page 2 gives one of the best maps I have seen and used several easily found landmark populated areas ( calling at least 1 or 2 of them "towns" is a little bit of a stretch, but they can be found on most Nevada maps )  and includes:  McDermitt, Denio, Orovada and the much better known:  Winnemucca, Nevada. Interstate 80 is clearly shown on this map for a reference anyone can appreciate immediately.  This really is one of the best maps I have come across for Thacker Pass.  It also clearly shows the Plan of Operations, PoO, for both the actual mine and reclamation areas and also for the exploration area as well.  Great map!

    I think this document serves quite well to illustrate how little local opposition was generated during the Scoping process earlier this year to the Thacker Pass facility, as evidenced by the very low turnout at public meetings:

    2.2.1 Scoping Meeting Attendance A total of 10 people (not including BLM staff, LNC representatives, or consultants working on the Project) signed into the meeting in Winnemucca and a total of 25 people signed into the meeting in Orovada.

    Not exactly figures that would be compatible with a huge public outcry against the construction of this facility, even by rural Nevada standards.

    Wow! Some additional really great maps and individual pages of what appears to be a slide show, possibly from sometime back in Feb 2020.  The slides don't appear to be enumerated so I will draw attention to the titles of just a few representative slides:  "Environmental Studies and Evalutations", "General Process Facility Layout", "Thacker Pass Enviromental Responsibility", "Thacker Pass Processing" and "Community Benefits".  

    Appendix C is a compendium of individual concerns reported during the Scoping process by multiple organizations and individuals.  A quick overview seems to show the the two most common concerns were regarding any effect on the Groundwater and on Wildlife.

    I already mentioned that the Springs in this area, pre construction, already show levels in excess of national acceptable standards for Arsenic, Aluminium, Iron, Magnesium and more.  LAC can't be blamed for the existence of these higher than national standard levels of contaminants existing before LAC even came on the scene.  I point that out especially since Ground water concerns was the Number 1 concern showing up the most as part of the Scoping process for Thacker Pass.

      1. Sorry Okiedo.   I assumed everyone had access to all the EIS documents, maps and the motherload of all LAC info on the main BLM project site.  There are lots of breadcrumbs spread throughout these documents.  This is where I found the very specific reference to a next gen all solid state battery factory onsite at TP.   Enjoy the reading.  It just makes me want to buy more LAC.........even at these prices.  

        https://eplanning.blm.gov/eplanning-ui/project/1503166/570

         

        1. WB DT:  Hey, no need to apologize.  I appreciate very much your post.  I don't look at every available site and your posting saves me time.  So glad to have you here!  

  2. In regards to the second document link: the Draft Environmental Impact Statement

    The document referred to is officially titled:  "Draft Environmental Impact Statement Thacker Pass Lithium Mine Project" and is dated 2018.
     
    Just a few of the bullet points are listed below along with a few comments about other items included in the report:
     
    Construction and operation of an attrition scrubbing process to separate the lithium-rich fine clay from the coarse low-grade material (coarse gangue);
     
    Construction and operation of lithium processing facilities designed to produce lithium carbonate, lithium hydroxide monohydrate, lithium sulfide, lithium metal, and solid-state lithium batteries; 
     
     Construction of a sulfuric acid plant that will generate sulfuric acid for use in a leaching process and will also generate steam for energy that will provide power to support the Project. Excess heat, in the form a steam, will be diverted to a turbo generator to produce electricity for the lithium process. The sulfuric acid plant will generate electrical power using double contact double absorption technology with an integrated steam turbo generator set;
     
    Construction of raw water supply facilities including two supply wells (Quinn Production Well and Quinn Backup Well), two booster pump stations, a water pump tank station, and underground water pipeline to the process plant; Construction of a seven mile 25-kilovolt (kV) power transmission line from a new substation installed in the process plant area to the raw water supply facilities to the east, and a two-mile power transmission line to new mine area substations to the west
     
    Pages 9-14 include an extensive analysis of the surface and underground water supply situation along with a chemical analysis of the springs in the area.  The NRV standards are exceeded by local springs for arsenic, aluminum, antimony, iron and magnesium.
     
    Pages 42-52 includes an extensive description, based on information available in 2018, of the processing of the lithium clay into lithium carbonate and lithium hydroxide and includes information on amounts of those two main products expected to be produced ( packaged in bulk bags of 1,000 Kilograms each ) along with the same information about the multiple by-products resulting from the anticipated process. 
     
     Keep in mind that this information was formulated back in 2018 and it is expected that since then the Processing Lab in Reno has contributed much updated information that will modify the final process chosen by LAC when it goes into production.  It is those modifications that I would like to know more about, but the preliminary processing steps are extensively documented in this 2018 document.