LAC presentation
On the page 15 is a timeline, which sugest, that Mr. Evans, once more delayed start of C-O. This time till first half of 2023.
Join the conversation about Lithium Americas.
ReplyOn the page 15 is a timeline, which sugest, that Mr. Evans, once more delayed start of C-O. This time till first half of 2023.
Join the conversation about Lithium Americas.
ReplyAnyone have any insight if the delayed start Pavel is referring to is specifically for battery grade lithium carbonate? I'm wondering if they could already be producing the lower quality technical grade and not considering this the "start of production".
AXP
"..... Construction continues to progress towards streamlined production • Focus is on prioritizing production over completion of all purification circuits • Experienced senior members of Ganfeng Lithium’s commissioning and construction team at site to assist through to start-up • Key areas of the processing plant commenced commissioning • All required infrastructure completed, KCl and SX plants are over 95% complete Solar evaporation ponds are in operation with significant brine in inventory; pond harvesting to remove excess salt continues..."
"Stage 1 early-stage production (expected in first half 2023)
• Stage 1 construction 100% complete (expected) • "
I think no matter what, 2023 has to be it.
I sincerely hope so. I need to have a look for how long they got money in the bank. I was hoping for a little tiny Xmass present from Mr. Evans. Instead of that, i have got few worthless call options.... Life is cruel to retail investors.