Skip to content
Sign in

Post

MacDonald Mines Exploration

Replies

  1. ReadyZed, before you get your hopes up, sorry to bust the bubble here

    but the slight rise in S.P of BMK from 3.0 Cents to 4.5Cents(high) ,

    was due to a News Release of KWG reporting of additional Chromite in its drill cores.

    same reason why NOT,SPQ, and FWR are all up between 15-25% on the day.

    BMK_Happy_Meal

    ************************************...

    Attention Business Editors:

    KWG Resources Inc. - High-grade chromite intersections continue to outline Big Daddy Chromite Deposit James Bay Lowlands of Ontario

        <<
        /NOT FOR DISTRIBUTION TO U.S. NEWS SERVICES OR FOR DISSEMINATION IN THE
        UNITED STATES/
    
        Symbol on TSX-Venture Exchange: KWG
        Shares issued and outstanding: 269,659,821
    
        HIGHLIGHTS
    
        -   HOLE FW-08-18 ENCOUNTERS 37.5% Cr(2)O(3) OVER 32.0 METERS,
            HOLE FW-08-19 UNDERCUTS 18 AND ENCOUNTERS 37.2% Cr(2)O(3) OVER
            46.5 METRES
        -   HOLE FW-08-19 INTERSECTS 3.8 METRES OF PGE MINERALIZATION AVERAGING
            2.15 g/t PLATINUM AND 2.86 g/t PALLADIUM, SANDWICHED BETWEEN MASSIVE
            CHROMITE LAYERS.
        -   MASSIVE CHROMITE BED(S) ENCOUNTERED OVER STRIKE LENGTH OF 400 METRES,
            OPEN IN ALL DIRECTIONS
        -   NEW NICKEL SULPHIDE ZONE DETECTED IN ANOMALY 1200 METRES TO THE
            NW OF BIG DADDY
        >>
    
        TORONTO, Dec. 15 /CNW/ - KWG Resources Inc. (TSX-V: KWG) "KWG", Spider
    Resources Inc. (TSX-V: SPQ) "Spider" and Freewest Resources Canada Inc.
    (TSX-V: FWR) "Freewest" announce the receipt of additional assays after
    completing a very successful drilling program prior to the fall "freeze-up"
    period in Northern Ontario.
        Since June, the main exploration focus of the KWG-Spider Joint venture
    has been on the massive chromite occurrence that was first discovered on the
    Freewest Option property in March of 2006. As a result of the recent drilling
    completed and the recent results announced October 21, 2008, the occurrence is
    now referred to as the "Big Daddy Chromite Deposit". This deposit is located
    approximately 3.6 kilometers northeast of Noront Resources Ltd's ("Noront")
    Eagle One Magmatic Massive Sulphide (Nickel Copper and PGM), or 5 kilometers
    northeast of Noront's Blackbird One and Two (Chromite) discoveries, and 4
    kilometers southwest of Freewest's Black Thor Chromite discoveries.
        The 5 drill hole results presented below, together with those previously
    announced by the Joint Venture on October 21, 2008, in addition to the recent
    drill results from Noront's Blackbird No.1 and No.2 chromite occurrences and
    those of Freewest's Black Thor Chromite discovery, could collectively
    represent the most significant chromite discovery ever made in North America.
    The magnitude of these new chromite discoveries has yet to be fully evaluated,
    however the fact that the occurrences are in the same peridotite body and are
    found over a strike length of 14 kilometers infers that the McFaulds Lake
    Chromite deposit(s) could be significantly large, perhaps comparable to some
    of the largest and richest chromite deposits in the world.
        As previously announced, diamond drilling by the KWG/Spider JV on the
    Freewest Option property has identified a northeast trending zone of
    continuous chromite mineralization that extends from local grid line 9+00
    meters NE to 13+00 metres NE along a strike length of 400 metres. The
    mineralized zone dips towards the NW at about 70 degrees and consists of
    varying widths of a variable tenor, in many instances high tenor of chrome,
    forming a series of stacked lenses. Additional infill drilling will be
    required to confirm continuity of the lenses from section to section.
        The deposit remains open to depth as well as along strike in both
    directions. In addition, drilling to confirm the upward extension of the
    mineralization to surface has not been completed. All drill and assay results
    are being added to a 3-D Gemcom model to visualize the chromite body. A number
    of faults were noted from the drilling, some of which occur at the contact of
    the chromite with the surrounding peridotite/dunite; these fault sets are also
    being modeled as they also affect the interpretation and continuity of the
    mineralization from section to section.
    
        ASSAY DATA RECENTLY RECEIVED FOR BIG DADDY
    
        Analytical results have recently been received for five holes drilled
    earlier this past summer and early fall: FW-08-15, FW-08-18 and FW-08-19,
    FW-08-20 and FW-08-21. Each of these holes intersected massive chromite as
    previously announced (October 21, 2008). The following table (Table 1)
    provides details of assays received from the five holes not previously
    reported.
    
        <<
        Table 1: Recently received analysis
    
        -------------------------------------------------------------------------
                        from    to    int   Cr(2)O(3)  Cr%    Fe%   Cr:Fe   Ni%
        Hole ID          (m)    (m)    (m)      %
        -------------------------------------------------------------------------
        FW-08-15         73.5   81.0    7.5      NA      NA     NA     NA   0.16
        -------------------------------------------------------------------------
        followed by      81.0  173.8   92.8   12.20    8.30  10.60   0.78   0.14
        -------------------------------------------------------------------------
        then            159.2  171.3   12.1    32.2   22.00  18.60   1.18   0.11
        -------------------------------------------------------------------------
        then            173.8  179.1    5.3      NA      NA     NA     NA   0.30
        -------------------------------------------------------------------------
    
        -------------------------------------------------------------------------
        FW-08-18         18.0   33.0   15.0    6.26    4.28   9.68   0.44   0.14
        -------------------------------------------------------------------------
        FW-08-18         67.5  138.0   70.5   24.89   17.02  13.02   1.31   0.13
        -------------------------------------------------------------------------
        incl.           106.0  138.0   32.0   37.47   25.63  15.68   1.63   0.11
        -------------------------------------------------------------------------
    
        -------------------------------------------------------------------------
        FW-08-19        141.0 161.95  20.95   12.04    8.23  10.13   0.81   0.15
        -------------------------------------------------------------------------
        including       141.5  144.1    2.6   31.32   21.40  13.79   1.55   0.13
        -------------------------------------------------------------------------
        then           161.95  183.0  21.05      NA      NA     NA     NA   0.10
        -------------------------------------------------------------------------
        including       167.2  171.0    3.8      NA      NA     NA     NA   0.14
        -------------------------------------------------------------------------
        then            183.0  229.5   46.5   37.18   25.44  15.30   1.66   0.11
        -------------------------------------------------------------------------
    
        -------------------------------------------------------------------------
        FW-08-20        261.0 336.95  75.95   23.25   15.90  11.32   1.40   0.13
        -------------------------------------------------------------------------
        including       304.3 336.95  32.65   39.56   27.06  14.37   1.88   0.11
        -------------------------------------------------------------------------
    
        -------------------------------------------------------------------------
        FW-08-21       259.45  282.0  22.55    1.29    0.88   6.38   0.14   0.30
        -------------------------------------------------------------------------
        then           313.45  318.9   5.45    0.75    0.51   1.90   0.27   0.12
        -------------------------------------------------------------------------
        followed by     318.9 320.95   2.05   17.47   11.93   12.3   0.97   0.45
        -------------------------------------------------------------------------
        then            360.0  417.0   57.0   17.52   11.98  11.64   1.03   0.14
        -------------------------------------------------------------------------
        including       376.0  385.8    9.8   31.90   21.84  18.29   1.19   0.08
        -------------------------------------------------------------------------
        also
        including       406.2  417.0   10.8   39.22   26.81  17.53   1.53   0.11
        -------------------------------------------------------------------------
    
    
        --------------------------------------------
        Hole ID          Pt     Pd     Au      TPM
                        (g/t)  (g/t)  (g/t)
        --------------------------------------------
        FW-08-15         0.25   1.23   0.01    1.49
        --------------------------------------------
        followed by      0.12   0.21   0.00    0.33
        --------------------------------------------
        then             0.19   0.23   0.01    0.43
        --------------------------------------------
        then             0.73   1.63   0.14    2.50
        --------------------------------------------
    
        --------------------------------------------
        FW-08-18         0.05   0.04   0.01    0.10
        --------------------------------------------
        FW-08-18         0.10   0.11   0.00    0.21
        --------------------------------------------
        incl.            0.09   0.06   0.00    0.15
        --------------------------------------------
    
        --------------------------------------------
        FW-08-19         0.12   0.14   0.01    0.27
        --------------------------------------------
        including        0.20   0.22   0.02    0.44
        --------------------------------------------
        then             0.73   0.95   0.05    1.73
        --------------------------------------------
        including        2.15   2.86   0.17    5.18
        --------------------------------------------
        then             0.21   0.19   0.00    0.40
        --------------------------------------------
    
        --------------------------------------------
        FW-08-20         0.15   0.14   0.01    0.30
        --------------------------------------------
        including        0.22   0.17   0.01    0.40
        --------------------------------------------
    
        --------------------------------------------
        FW-08-21         0.07   0.14   0.00    0.21
        --------------------------------------------
        then             0.27   0.44   0.01    0.72
        --------------------------------------------
        followed by      0.13   0.26   0.00    0.39
        --------------------------------------------
        then             0.11   0.14   0.11    0.36
        --------------------------------------------
        including        0.12   0.07   0.00    0.19
        --------------------------------------------
        also
        including        0.16   0.11   0.56    0.83
        --------------------------------------------
    
        NA refers to not assayed.
    
        >>
    
        The above tabulation of drill intercepts and assay results are core
    lengths only, and do not represent true width for the mineralized zones.
    Additional drilling is required to determine true widths.
        Drilling took place with reference to a local grid, labeled Grid J. The
    drills were set to drill grid south 150 degrees in each instance, and the
    initial dip of each hole was set at -50 degrees. Table 2 provides drill collar
    co-ordinates for these five holes, as well as other holes previously drilled
    (and reported upon) on the Big Daddy Chrome occurrence, all azimuth directions
    are true North readings. The UTM spheroid used for determining location was
    NAD 83 Zone 16, both UTM and local grid co-ordinates are given.
    
        Table 2 Drill Hole Locations
    
        <<
    
        -------------------------------------------------------------------------
                                    Local   Local
        Hole ID    UTM     UTM       Grid    Grid    Azimuth  Inclination Length
        -------------------------------------------------------------------------
                 Easting Northing  Easting Northing  degrees     degrees     (m)
                    (m)     (m)       (m)     (m)
        -------------------------------------------------------------------------
    
        -------------------------------------------------------------------------
        FW-06-03  551087  5845306  10+00 E  15+25N  150degrees  -50degrees 353.5
        -------------------------------------------------------------------------
        FW-08-05  551050  5845367  L10+00E  16+00N  150degrees  -50degrees   327
        -------------------------------------------------------------------------
        FW-08-06  550959  5845324   L9+00E  16+00N  150degrees  -50degrees   384
        -------------------------------------------------------------------------
        FW-08-07  551136  5845427  L11+00E  16+00N  150degrees  -50degrees 405.7
        -------------------------------------------------------------------------
        FW-08-12  551111  5845472  L11+00E  16+00N  150degrees  -50degrees   354
        -------------------------------------------------------------------------
        FW-08-13  551164  5845384  L11+00E  15+50N  150degrees  -50degrees   297
        -------------------------------------------------------------------------
        FW-08-14  551180  5845451  L11+50E  16+00N  150degrees  -50degrees   189
        -------------------------------------------------------------------------
        FW-08-15  551158  5845494   11+50E  16+50N  150degrees  -50degrees   240
        -------------------------------------------------------------------------
        FW-08-18  551192  5845511   12+00E  16+50N  150degrees  -50degrees   255
        -------------------------------------------------------------------------
        FW-08-19  551168  5845554   12+00E  17+00N  150degrees  -50degrees   273
        -------------------------------------------------------------------------
        FW-08-20  551134  5845599   12+00E  17+50N  150degrees  -50degrees   357
        -------------------------------------------------------------------------
        FW-08-21  551118  5845650   12+00E  18+00N  150degrees  -50degrees   447
        -------------------------------------------------------------------------
    
        >>
    
        Hole FW-08-15 on local grid section L11+50E intersected a length of
    platinum and palladium mineralization, where the Total Precious Metals (TPM)
    averaged 1.49 g/t (gram/tonne) over 7.5 meters, followed by a 92.8 meter
    section of semi-massive chromite that averaged 12.3% Cr(2)O(3), including a
    12.1 meter section of massive chromite with an average of 33.1% Cr(2)O(3)
    followed by a 5.3 meter section of peridotite that averaged 2.5 g/t TPM. The
    higher grade chromite beds had a moderate Cr:Fe ratio of 1.18.
    
        Hole FW-08-18 on local grid section L12+00E intersected a weakly
    mineralized chrome section over 15.0 meters containing an average of 6.3%
    Cr(2)O(3), followed by a much better mineralized section further down the hole
    over where a 70.5 meter zone of semi-massive to massive chromite averaged
    24.9% Cr(2)O(3) including a section of 32 meters containing 37.5% Cr(2)O(3).
    The latter intercept has a very favourable Cr:Fe ratio of 1.63.
    
        Hole FW-08-19 on local grid section L12+00E intersected a weakly
    mineralized chrome section that over 21 metres averaged 12.04% Cr(2)O(3)
    including a short higher grade section that averaged 31.32% Cr(2)O(3) over 2.6
    metres. The higher grade interval has a favorable Cr:Fe ratio of 1.55. This
    section was followed by a relatively enriched section of platinum group metals
    sandwiched between two chrome layers that averaged 1.69 g/t TPM over 21 meters
    including 3.8 metres that averaged 5.18 g/t TPM (2.15g/t Pt, 2.86 g/t Pd and
    0.17 g/t Au). This was followed by a thick high grade chrome bed that averages
    37.18% Cr(2)O(3) over 46.5 metres with a Cr:Fe ratio of 1.66.
    
        Hole FW-08-20 on local grid section L12+00E intersected a moderately
    mineralized chrome section over 76.0 meters containing an average of 23.25%
    Cr(2)O(3), including a section of 32.7 meters containing 39.56% Cr(2)O(3). The
    latter intercept has a very favourable Cr:Fe ratio of 1.88.
    
        Hole FW-08-21 on local grid section L12+00E intersected a very weakly
    mineralized chrome section that over 22.5 metres averaged 1.29% Cr(2)O(3), as
    well as 0.30% Nickel. This was followed by a 5.5 metre section that averaged
    0.75 g/t TPM, followed by 2.1 meters averaging 17.47% Cr(2)O(3). A third
    chromite bed was encountered further down the hole, that over 57 metres
    averaged 17.52% Cr(2)O(3) including 9.8 metres that averaged 31.9% Cr(2)O(3),
    as well as another higher grade interval that averaged 39.22% Cr(2)O(3) over
    10.8 metres. This latter interval contained 0.83 g/t TPM as well and has a
    favorable Cr:Fe ratio of 1.53.
    
        PENDING ASSAY RESULTS
    
        The following table (Table 3) summarizes the intersections of the last
    two holes completed on the project just prior to the shutdown for winter
    freeze up, These two holes were designed to test the continuity of
    mineralization at a 100 meter stepout interval towards the northeast on local
    grid section 13+00 NE. Massive Chromite was intersected in both of these holes
    confirming chrome mineralization extending to the northeast. The following
    table provides visual descriptions of the core as noted by site geologists and
    recorded in the drill logs. These are visuals only - assays are pending on
    these two holes. Once all assays are received, downhole assay grade intervals
    will be released along with hole collar locations on the local and UTM grid
    for these as well as earlier holes where collar locations have not yet been
    reported.
    
        Table 3 Recent drill results, observed mineralization, assays pending
    
        <<
    
        -------------------------------------------------------------------------
                    initial    from      to      Int.
        Hole ID       dip       (m)      (m)      (m)      Visual observations
        -------------------------------------------------------------------------
    
        -------------------------------------------------------------------------
        FW-08-22    -50 deg      250      256        6     Disseminated Chromite
                              ---------------------------------------------------
                                 256    263.6      7.6     Semi Massive Chromite
                              ---------------------------------------------------
                               263.6    298.8     35.2     Massive Chromite
        -------------------------------------------------------------------------
    
        -------------------------------------------------------------------------
        FW-08-23    -50 deg      265    269.7     4.7      Disseminated Chromite
                              ---------------------------------------------------
                               332.3      378     45.7     Massive Chromite
        -------------------------------------------------------------------------
    
        >>
    
        The widths of the chromite beds stated in Table 3 are drilled intercepts
    only, not true thickness. True thickness will be determined once additional
    drilling is completed and the deposit is modeled. The main massive chromite
    bed appears to be continuously mineralized over an apparent thickness of 35 to
    45 meters on this section. Notwithstanding the foregoing, visual observations
    are estimates only and pending assay results may not confirm visual
    observances in whole or in part.
    
        ADDITIONAL ANOMALY TESTING RESULTS
    
        Two additional drill holes were drilled into a magnetic anomaly located
    1.2 kilometres to the NW of the Big Daddy chromite occurrence, near the
    northwestern corner of the option property. The holes were set up at the same
    collar location of 550875mE at 5846305mN (UTM co-ordinates).
        The first was inclined at -50 degrees, the second at -65 degrees, and
    both were drilled at an azimuth of 315 degrees. The anomaly consisted of a
    strong magnetic and subtle electromagnetic conductivity response. A sulfide
    zone within the geophysically rendered NW trending Banded Iron Formation
    ("BIF"), was intersected returning the following results (Table 4).
    
        <<
    
        -------------------------------------------------
                   from     to     int
        Hole ID     (m)     (m)     (m)     Cu%     Ni%
        -------------------------------------------------
        FW-08-16   138.0   139.0     1.0    0.93    2.04
        -------------------------------------------------
        FW-08-17   146.5   148.0     1.5    0.12    0.01
        -------------------------------------------------
    
        >>
    
        The assay results infer an enrichment in base metals in the BIF,
    particularly in hole FW-08-16 where 1.0 metre returned an assay of 0.93%
    Copper and 2.04% Nickel. The significance of this intersection needs to be
    further investigated.
    
        CURRENT PROGRAM
    
        Spider recently announced the completion of the first tranche financing
    totaling $235,000. Proceeds from this financing are currently being utilized
    to prepare the project for the next round of exploration, that includes: line
    cutting (re-establishing a 2004 drill grid - the J grid - as well as
    extensions thereto), ground geophysical surveying (including magnetic
    gradiometer and gravimetric surveying), re-logging of core to standardize
    lithological units, infill sampling of zones of weaker chromite
    mineralization. All are needed to prepare a NI-43-101 technical report on the
    project. The preparation of this NI 43-101 report was recently awarded to
    Micon International Ltd. a world recognized consulting firm, with expertise in
    chromite deposits.
    
        SAMPLE PROTOCOL, SECURITY, ANALYSES
    
        All drill holes were logged and samples referred to herein were completed
    and selected under the supervision of Howard Lahti Ph.D., P.Geo, of
    Fredericton New Brunswick. The samples were sawn in half, with half of the
    core retained for further work and/or storage at the main base camp at
    McFaulds Lake. The split samples were placed into individual plastic bags,
    clearly labeled and tagged and then sealed in rice bags where a numbered seal
    lock was applied. The sealed rice bags were placed in plastic sealed pails and
    shipped via bonded carrier to Activation Laboratory's (ActLab) new facility in
    Thunder Bay, Ontario. The samples were then entered into ActLab's system for
    preparation, processing and analyzing. After initial processing at the Thunder
    Bay facility of ActLab the samples were shipped via lab - lab bonded courier
    to ActLab's main laboratory in Ancaster, Ontario. The samples all underwent
    multi-element analysis using four acid digestion followed by Inductively
    Coupled Plasma analysis (TD-ICP). Where over-limits in nickel and copper are
    encountered in the first pass, Optical Emission Spectrometry (ICP-OES) is used
    to provide the over-limit results, while Fire Assay Inductively Coupled Plasma
    (FA-ICP) is used for over limits in gold, platinum and palladium. Additional
    analyses using Instrumental Neutron Activation Analysis (INAA) were completed
    for all samples for their chrome contents in excess of 1% chrome. For more
    information on these analytical techniques please refer to Activation
    Laboratory website www.actlabs.com
    
        This press release has been prepared by management of Spider Resources
    Inc., which is the operator of the joint venture with KWG during 2008, and has
    been approved for dissemination by Neil Novak P.Geo, President of Spider and
    James G. Burns, P.Eng. Vice President Exploration for Spider, both being
    Qualified Persons as such term as defined under National Instrument 43-101,
    who have reviewed and verified the technical information contained in this
    press release and have approved the contents of this press release.
    
        <<
        THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT
        RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS PRESS RELEASE.
        >>
    
        This press release, required by applicable Canadian securities law, is
    not for distribution to U.S. news services or for dissemination in the United
    States, and does not constitute an offer of the securities described herein.
    These securities have not been registered under the United States Securities
    Act of 1933, as amended, or any state securities laws, and may not be offered
    or sold in the United States or to U.S. persons unless registered or exempt
    therefrom.
        This press release includes certain "Forward-Looking Statements" within
    the meaning of the US Private Securities Reform Act of 1995. Other than
    statements of historical fact, all statements are "Forward-Looking Statements"
    that involve such various known and unknown risks, uncertainties and other
    factors. There can be no assurance that such statements will prove accurate.
    Results and future events could differ materially from those anticipated in
    such statements. Readers of this press release are cautioned not to place
    undue reliance on these "Forward-Looking Statements". All dollar amounts are
    Canadian dollars unless otherwise noted.
    
    
    
    
    For further information: BRUCE HODGMAN, Communications Director, Direct:
    (416) 646-1374, [email protected]; MICHEL COTE, Director, (514) 866-6001
    ext. 266; Or visit our website: www.kwgresources.com
    1. I do understand nut the high volume and the SP close @0.06 give us hope, maybe an insider heard something.

      But your right it might be a market manipulations, but time will tell us.

      Take care