Welcome To The Manicougan Minerals Inc. HUB On AGORACOM

Edit this title from the Fast Facts Section

Free
Message: Kasagiminnis Lake Phase One Drill Results

----- Kasagiminnis Lake Phase One Drill Results
----------------------------------------------------------------------------
Hole From (m) To (m) Length (m) Au gpt AA Au gpt Grav.
KAS-11-01 116.7 127.8 11.1 2.82 2.76
incl. 120.7 125.7 5.0 4.55 4.45
KAS-11-02 hole abandoned
KAS-11-03 hole abandoned
KAS-11-04 126.1 134.0 7.9 6.60 7.24
incl. 126.1 128.0 1.9 12.86 12.70
KAS-11-05 67.5 70.5 3.0 2.52 2.21
and 75.5 77.5 2.0 5.20 6.02
KAS-11-06 63.5 64.5 1.0 4.21 3.79
and 98.3 99.7 1.4 6.24 7.05
KAS-11-07 27.7 51.7 24.0 0.69 0.83
incl. 27.7 28.5 0.8 6.95 8.94
KAS-11-08 71.3 93.0 21.7 1.85 1.91
incl. 72.3 74.8 2.5 4.60 5.70
and 83.6 87.0 3.4 4.49 4.78
KAS-11-09 49.5 57.5 8.0 2.91 2.79
incl. 49.5 51.3 1.8 4.73 5.22
and 54.2 55.7 1.5 5.80 5.62
----------------------------------------------------------------------------
note: true widths are currently estimated at 50-80% of drilled widths
----------------------------------------------------------------------------
Kasagiminnis Lake Phase 2 Drill Results
----------------------------------------------------------------------------
Hole From (m) To (m) Length (m) Au gpt AA Au gpt Grav.
KAS-11-10 hole abandoned
KAS-11-11 229.7 230.7 1.0 5.64 4.88
KAS-11-12 231.0 232.0 1.0 2.64 2.12
KAS-11-13 204.3 205.3 1.0 2.07 NA
KAS-11-14 233.8 234.8 1.0 5.85 3.62
and 240.0 241.0 1.0 6.21 6.80
----------------------------------------------------------------------------
note: true widths are currently estimated at 50-65% of drilled widths

Share
New Message
Please login to post a reply