Skip to content
Sign in

Post

Murgor Resources

Prez3.4 rating from 152 members3.2K ptsRate

NR

Press ReleaseSource: Murgor Resources Inc.

Murgor's initial drilling results return golden surprise at the Hudvam copper-gold-zinc deposit, Manitoba.
Tuesday March 11, 10:05 am ET

MONTREAL, March 11 /CNW/ - Murgor Resources Inc. (MGR: TSX-V) today announced that it has received geochemical results from six drill holes at the Hudvam copper-gold-zinc deposit in Manitoba. Two holes are infill drill holes aimed at upgrading the current Mineral Resource at Hudvam from Inferred to Measured and Indicated, and four holes are definition drill holes aimed at extending the limits of the known mineralization. Three of the four definition drill holes intersected ore-grade material and will ultimately increase the resource at Hudvam. Since January of 2008, Murgor has completed 21 drill holes at the Hudvam deposit (a total of 8,056 meters) and drilling is active on site. Results from the next 15 drill holes completed to date are still pending. A longitudinal section will be attached to this press release on Murgor's website at www.murgor.com.

The results from the first six drill holes are highlighted by unusually high gold values that supplement the copper, zinc and silver values. Best assay results are as follows (a complete list of results is shown at the end of this press release):

	        DDH HVS-08-22: 8.46 g/t Au, 0.50% Cu, 0.40% Zn, 4.84 g/t Ag over 2.84 	        metres.  	        DDH HVS-08-23: 4.37 g/t Au, 4.66% Cu, 5.79% Zn, 41.23 g/t Ag over 	        5.00 metres.  	        DDH HVS-08-24: 12.90 g/t Au, 6.20% Cu, 3.68% Zn, 46.36 g/t Ag over 	        1.14 metres.  	        DDH HVS-08-26: 17.48 g/t Au, 0.34% Cu, 0.79% Zn, 23.66 g/t Ag over 	        3.15 metres.  	        DDH HVS-08-28: 2.63 g/t Au, 1.76% Cu, 0.14% Zn, 11.13 g/t Ag over 	        1.43 metres. 	    
Andre C. Tessier, President & CEO of Murgor Resources reports: "These are exceptional gold values for any gold deposit, so to obtain these gold values in a polymetallic deposit is even more exciting. This winter's drilling program at Hudvam has been very encouraging and additional results are expected shortly. Metallurgical and geotechnical drill holes have been completed in preparation for the pre-feasibility study and, infill and definition drilling is nearly completed. We have now freed one helicopter supported rig for exploration drilling at Murgor's grassroots projects with another rig at Hudvam starting to drill exploration targets at the property scale. Management and exploration staff at Murgor are looking forward to the upcoming results."

Murgor would also like to report that a detailed compilation and 3D modelling of the Hudvam deposit has led to the definition of several high priority exploration targets in the immediate area of the currently defined copper-gold-zinc Mineral Resource at Hudvam.

In February of 2007, Murgor completed a NI 43-101 compliant resource estimate at Hudvam. The resource estimation doubled the historical resource for copper and zinc and increased the gold and silver resource by more than 145% relative to historical resources. A new NI 43-101 compliant resource estimate is planned for the summer of 2008. The current 43-101 Inferred resource at the Hudvam deposit stands at (please see SEDAR for the full report):

	    ------------------------------------------------------------------------- 	    CUT-OFF             TONNAGE                       GRADE 	    GRADE(x)             (Tons)       Cu          Zn          Au          Ag 	    ------------------------------------------------------------------------- 	    2% Cu Equiv(xx)   1,315,000    1.17%       1.71%    2.94 g/t   10.49 g/t 	    -------------------------------------------------------------------------  	    ------------------------------------------------------------------------- 	                                                   CONTAINED METAL 	                               Cu (lbs)    Zn (lbs)     Au (oz)     Ag (oz) 	    ------------------------------------------------------------------------- 	                             30,778,000  44,720,000     111,000     403,000 	    -------------------------------------------------------------------------  	    (x)  Copper equivalent grade. 	    (xx) Copper equivalencies based on the 	         following price of metals: Copper (Cu) = USD$1.10 per 	         pound, Zinc (Zn) = USD$0.60 per pound, Gold (Au) = USD$475.00 per troy ounce, and Silver (Ag) = USD 	         $6.00 per troy ounce. 	    
The mineralization at Hudvam consists of solid sulphide to sulphide breccia with variable amounts of gold bearing pyrite, pyrrhotite, chalcopyrite and sphalerite. The ore lenses trend NNE and dip steeply at 75-80 degrees towards the SE and would be amenable to long-hole mining. There is a 312 meter long ramp at the deposit that could now be rehabilitated for quick development.

The Hudvam property consists of 18 claims covering 1,714 hectares, located approximately 47 kilometers northeast of the Town of Flin Flon in Manitoba. Murgor is earning a 100% interest in the property from HudBay Minerals Inc. (HBM: TSX). HudBay has the right to buyback of up to 65% of the property.

Chemical analyses reported in this press release were performed by TSL Laboratories in Saskatoon. Base metals were analyzed through atomic absorption spectrometry after a multi acid digestion whereas gold was analyzed by fire assay Atomic Absorption using a 30g charge, with gravimetric finish for assays greater than 3 g/t. Sampling and analytical procedures are subject to a comprehensive Quality Assurance and Quality Control program that includes duplicate samples, blanks and analytical standards.

The Qualified Person in the field, as defined by NI-43-101, was Neil W. Richardson P.Geo. and Manager of Central Canada Exploration for Murgor Resources Inc. Andre C. Tessier, P.Geo. (On), P.Eng. (Qc) and President CEO of Murgor Resources is the Qualified Person responsible for this news release.

	                   TABLE OF 2008 RESULTS TO DATE AT HUDVAM  	    ------------------------------------------------------------------------- 	                                          HORI- 	    HOLE-ID    FROM     TO  LENGTH  TRUE ZONTAL    AU     AG  CU   ZN  Cu_eq 	    ------------------------------------------------------------------------- 	                (m)     (m)   (m)  WIDTH  WIDTH  (g/t)  (g/t) (%)  (%)   (%) 	    ------------------------------------------------------------------------- 	    HVS08-022 208.16  211.00  2.84  2.22  2.30   8.46   4.84 0.50 0.40  3.20 	    ------------------------------------------------------------------------- 	              214.87  218.35  3.48  2.73  2.83   1.11   3.82 0.45 0.38  0.93 	    ------------------------------------------------------------------------- 	              262.10  262.50  0.40  0.32  0.33   0.58   8.50 0.18 2.81  1.33 	    ------------------------------------------------------------------------- 	    HVS08-023 301.12  306.12  5.00  3.39  3.51   4.37  41.23 4.66 5.79  8.13 	    ------------------------------------------------------------------------- 	              332.15  334.25  2.10  1.43  1.48   3.28   1.99 0.24 0.62  1.44 	    ------------------------------------------------------------------------- 	              367.00  368.80  1.80  1.23  1.28   1.33  12.23 1.50 0.59  2.17 	    ------------------------------------------------------------------------- 	              375.25  376.75  1.50  1.03  1.07   3.14   3.72 0.30 0.22  1.34 	    ------------------------------------------------------------------------- 	    HVS08-024 252.15  253.29  1.14  0.74  0.77  12.90  46.36 6.20 3.68 11.56 	    ------------------------------------------------------------------------- 	              327.61  328.24  0.63  0.42  0.43   1.44  11.07 0.74 1.63  1.78 	    ------------------------------------------------------------------------- 	    HVS08-025        Metallurgical Hole - Metallurgical assays pending 	    ------------------------------------------------------------------------- 	    HVS08-026 205.50  208.65  3.15  2.36  2.45  17.48  23.66 0.34 0.79  5.99 	    ------------------------------------------------------------------------- 	              235.45  235.79  0.34  0.26  0.27 109.90   6.70 0.12 0.76 33.38 	    ------------------------------------------------------------------------- 	    HVS08-027                          Assays Pending 	    ------------------------------------------------------------------------- 	    HVS08-028 285.21  286.65  1.43  0.94  0.98   2.63  11.13 1.76 0.14  2.66 	    ------------------------------------------------------------------------- 	    HVS08-029                          Assays Pending 	    ------------------------------------------------------------------------- 	    HVS08-030                  Geotechnical Hole - No samples 	    ------------------------------------------------------------------------- 	    HVS08-031                        Zone is dyked out 	    ------------------------------------------------------------------------- 	    Copper Equivalencies based on Gold (at) $600/oz, Silver (at) $12.00/oz, 	    Copper (at) $1.50/lbs and Zinc (at) $0.80/lbs 	    
	    A map of the Hudvam deposit is available at 	    http://files.newswire.ca/476/Hudvam_Map.pdf  
This news release includes certain "forward-looking statements". All statements other than statements of historical fact, included in this release, including, without limitation, statements regarding potential mineralization, resources and reserves, exploration results, and future plans and objectives of Murgor, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Murgor's expectations are exploration risks detailed herein and from time to time in the filings made by Murgor with securities regulators.
	    The TSX Venture Exchange has not reviewed and does not accept 	    responsibility for the adequacy or accuracy of this press release. 

For further information

PLEASE VISIT MURGOR'S WEBSITE AT WWW.MURGOR.COM OR CONTACT André C. Tessier, President & CEO, MURGOR RESOURCES INC., Tel: (613) 546-7503 or 1-888-891-3330, Fax: (613) 546-7318, E-mail: [email protected], Web site: www.murgor.com Or Michael Joyner, Investor Relations - The Equicom Group, Tel: (416) 815-0700 ext. 275, or 1-800-385-5451, E-mail: [email protected]

 



Source: Murgor Resources Inc.

Join the conversation about Murgor Resources.

Reply

Replies


  1. MURGOR DISCOVERS A NEW EXTENSION OF THE COPPER-GOLD RESOURCE CLOSER TO SURFACE AT THE WIM DEPOSIT IN MANITOBA

    Montreal, Quebec, March 13, 2008.
    Murgor Resources Inc. (MGR: TSX-V) today announced that it has extended the Wim massive sulphide lens by at least 100 metres closer to surface. Geochemical results from twelve infill, definition and exploration drill holes from the Wim copper-gold deposit in Manitoba, were received from the first phase of drilling in 2008. This phase of drilling is aimed at determining the size of the upper portion of the Wim deposit. The geochemical results received to date, confirm that drill holes intersected ore-grade material that will ultimately increase the resource of the Wim deposit. A longitudinal section will be attached to this press release on Murgor’s website at www.murgor.com.

    Since January of 2008, Murgor has completed 30 drill holes at the Wim deposit (a total of 8,056 metres) and drilling is expected to continue until the summer of 2008. In addition to infill and definition drilling, Murgor has completed metallurgical and geotechnical drill holes in preparation for the pre-feasibility study at Wim. Results from the remaining drill holes are still pending.

    Best results from the first twelve drill holes are as follows (a complete list of results is shown at the end of this press release):

    DDH WZS-08-16: 0.98 g/t Au, 2.01% Cu, 5.88 g/t Ag over 4.91 metres.
    DDH WZS-08-18: 0.79 g/t Au, 2.04% Cu, 2.70 g/t Ag over 4.03 metres.
    DDH WZS-08-20: 1.15 g/t Au, 2.02% Cu, - g/t Ag over 6.13 metres.
    DDH WZS-08-21: 1.64 g/t Au, 1.06% Cu, 5.61 g/t Ag over 3.20 metres.
    DDH WZS-08-22: 1.10 g/t Au, 1.69% Cu, - g/t Ag over 4.00 metres.
    DDH WZS-08-23: 0.80 g/t Au, 1.57% Cu, - g/t Ag over 8.91 metres.
    DDH WZS-08-25: 2.85 g/t Au, 4.90% Cu, 20.85 g/t Ag over 4.50 metres.
    DDH WZS-08-27: 1.94 g/t Au, 2.32% Cu, 10.25 g/t Ag over 6.62 metres.

    André C. Tessier, President & CEO of Murgor Resources reports: “The Wim deposit is growing very rapidly and with the additional drilling we have planned, there is a great opportunity to further increase the size of the deposit. What we have found through this phase of drilling is that drill holes that were counted as cutoff holes in the past actually represent narrow areas within the lens. The mineralization that was encountered in this first phase of drilling of 2008 is actually thick, quite continuous and remains open towards surface. Considering these results in the upper portion of the lens, Murgor is looking forward to the results of the next phase of drilling in the lower part of the lens where most of the growth was originally anticipated. ”

    In March of 2007, Murgor completed a NI 43-101 compliant resource estimate at Wim. The estimation increased the resource by nearly 10% for copper and more than 40% for gold, relative to the historical resource. A new NI 43-101 compliant resource estimate is planned for the summer of 2008. Not including the new zones defined so far by Murgor in 2007 and 2008, the current 43-101 Inferred resource at the Wim deposit stands at (please see SEDAR for the full report):

    CUT-OFF TONNAGE GRADE CONTAINED METAL
    GRADE* (Tonnes) Cu Zn Au Ag Cu (lbs) Zn (lbs) Au (oz) Ag (oz)

    2% Cu Equiv** 2,273,000 1.92% 0.26% 1.65 g/t 5.58 g/t 87,333,000 11,943,000 110,000 370,000