Skip to content
Sign in

Post

Noront Resources

The post this replies to is no longer available.

Prez4.5 rating from 162 members2.3K ptsRate

size

B,

My guess at total tonnage was in the same ballpark as yours before the last release.

Hole 3 and 4 throw a wrench into that calc though ( of course NOT didn't give the azimuth or dip of those two holes which makes it difficult to draw a section) but I think the estimated strike length is a little less than first guessed.

The structure could be plunging I guess but we'll have to see what happens in the next holes

Rockaur

Join the conversation about Noront Resources.

Reply