X Sections
disclaimer: the position of some of the holes are guesses
Rockaur

Join the conversation about Noront Resources.
Replydisclaimer: the position of some of the holes are guesses
Rockaur

Join the conversation about Noront Resources.
ReplyRockaur:
On your BEAUTIFUL graphic from Sept 27, I can't read the angle's.
Did you have the 45 and 70 degree angles from 7 & 8 available to you?
If not, can you adjust and repost:
--------------
Old Joe - Thank you for your great discussion, but I'm a visual guy and I'm having trouble without getting in straight in my head.
Thanks to you both.
BK
--------------------------
Here are Richard's quotes
From Sept 27 interview..
'Hole #7, drilled at a 45 degree angle, has intersepted the sulphide bearing zone for a total length of 73 meters."
'Hole #8, drille fro the save set up, at a 70 degree angle, is ongoing as we speak."
--------------------------
Here is the news release quote.
Hole NOT-07-07 has recently been completed. This hole is positioned at the same collar location as holes NOT-07-01 and 02 (a few meters away to allow for drill setup), however the azimuth was set at due east, to undercut Hole NOT-07-05 from the west. The initial dip of this hole was set at -45 degrees.
-----------------------
Here was my take (no doubt wrong)
So, if hole #7 is a few meters from 1 and 2, and hole #8 is 'from the same set up' as 7, then I assume they are all starting in the same place and shooting out in different directions and angles like a fireworks explosion. This makes the best sense to me. easier to delineate what you know you have rather then hopping about punching holes hither and thither.
||||
/ / | \ \
/ / | \ \
--------------------------
Here is the data Rockaur posted....
Hole # easting Northing Azim dip Comments
1 12+25 5100 90 -45
2 12+25 5100 90 -65
3 ?? ?? ? ? 100m NE of #1 #2
undercut body
4 ?? ?? ? ? 100m SW of #1 #2
overcut body
5 ?? ?? n/a -90 50m NE of #1 #2
6 ?? ?? 270 ? drilled towards #5 from east
(assume)
7 12+25 5100 45 ? from # 1 towards #5 (due east)
------------------------
#1 & 2 are in a vertical plane as will #7 & 8 once # 8 is completed. This helps them with resource calc's as well as in figuring out the boundries (Easterly and Westerly) and compare with what imaging shows to figure out possible dip and perhapse area source may be located in (something I would want to know about since it is what can lead them to ever increasing volumes of mineralization). For the moment I am assuming what they are currently drilling is an accumulation chamber. Tracing back along the source channel (once located - must be comming from deeper underneath) will lead to more such chambers (my hope/expectation) down deeper.....
The calculations I did are rough but good approximation for calculating a volume - actual size and shape is sure to be considerably - and thus alos rough but good for tonnaga as well. I chose to err strongly on the conservative side as well.
Old Joe
Old Joe