Skip to content
Sign in

Post

Noront Resources

Prez3.8 rating from 259 members5.9K ptsRate

The Winter Road Issue

Thanks to all who have responded to my original post. My query was to gather more ideas on the issue so that the concept proposed by NOT's consultants of "direct shipping of high grade DE1 ore" could be fleshed out a bit more. I will leave the final calculations and engineering concerns to them. However, on this forum some have surmised that if we just look at the GMV and make a few assumptions, that voila we have several 100's of millions of $ net revenue if this high grade core is mined and shipped to a smelter/refinery. I think that in the case of Windfall's bulk sampling, that it could very much prove to be a profitable/revenue-generating excercise because of the simple logistics involved. DE1, I'm not so sure.

Without going into details, I have done a seat of the pants, back of the envelope calculation re DE1 using the resource figures given in the recent news release. I have shared the details with donypee via PM and would be prepared to share them with anyone else. Suffice it to say, in my opinion the most critical issue for an economic analysis appears to be the cost of transportation from the McFaulds area to a rail head. Not totally suprising is it? The cost of construction of a winter road as per a post by semismart earlier is not a major barrier. It is the cost and logistics of physically moving the supplies/ equipment into the camp and the ore out over a winter road which has a limited life. It easy to say that one could do this over a period of a few years, but there are then more recurring costs of a significant nature both with respect to the road as well as the camp at McFaulds.

I am not saying that it is not doable. It just seems improbable that implementing this concept will result in net revenues of the order of 100's of $M.

Respectfully submitted

Comments are always welcome.



geoprof

Join the conversation about Noront Resources.

Reply

Replies

  1. DE1, I'm not so sure.

    Without going into details, I have done a seat of the pants, back of the envelope calculation re DE1 using the resource figures given in the recent news release. I have shared the details with donypee via PM and would be prepared to share them with anyone else.

    ......

    I am not saying that it is not doable. It just seems improbable that implementing this concept will result in net revenues of the order of 100's of $M.

    Geo,

    I for one would be interested in YOUR calculations !

    Just post them on this forum.

    Thanks.

    FANTOMAS

    1. My reason for not posting the details, is that I would like some comments via PM's for those who are really interested in these types of analyses. I am looking for constructive criticism. If any member of this forum would like to contribute to my analysis, I would be pleased to send them the details now via PM. The views of others under this scenario can be better incorporated into a final posted "peer reviewed" version for all to read.

      If you wish a copy to review, please send me a PM. Any reflection of your comments in the final posted version, will be attributed anonymously if you wish.

      Thanks

      geoprof