Had to visit the website just to refresh when last drill results were released during this mgmt self imposed black-out period.
Just luv this team, not, though shouldn't complain as were still holding shares.
Do not understand this strategy against us retail.
Anyways, a refresher; from 23 January 2009! Cheers, Mark
"Hole NOT-08-44, an extension to Eagle One, averaged 4.21% Nickel,?
2.14% Copper, 0.35 g/t Platinum and 6.30 g/t Palladium over 28.8?
metres, including 14.1 metres of higher grade averaging 7.46% Nickel?
and 3.65% Copper.?
?- Hole NOT-08-2G11 drilled on the AT12 anomaly encounters widespread?
nickel/copper PGE mineralization over 122.9 meters grading 0.56%?
Nickel, 0.29% Copper, 1.06 grammes/tonne TPM, including 5.5 metres?
averaging 2.38% Nickel, 3.05% Copper, 0.92 g/t Platinum, 2.62 g/t?
Palladium and 0.22 g/t Gold.?"