Probe Mines Technical Updates on Victory and Tamarack Projects, McFauld's Lake Area

TORONTO, ONTARIO--(Marketwire - June 2, 2009) - The Directors of PROBE MINES LIMITED (TSX VENTURE:PRB) ('Probe') are pleased to provide a technical update on the Company's 100%-owned Victory and Tamarack Projects in the McFauld's Lake area of Northern Ontario.

Victory Project

Following the drill discovery of sulphide mineralized ultramafic rock in the 2008 drilling program, a VTEM airborne electromagnetic (EM)-magnetic survey was flown over the eastern portion of the Victory Project claims. Twelve priority coincident EM-magnetic anomalies have been delineated from the survey ranging between 150 and 1,900 metres long (see map at www.probemines.com). The conductors are all situated in the area of the ultramafic sill and have not been tested by previous drilling.

The Victory project is comprised of 452 claims totaling 7,232 hectares and covers the interpreted southeast extension of the McFauld's Lake volcanic belt. The 2008 discovery of ultramafic rocks was the first for the property, and highlights this area's potential to host nickel-copper-PGE or chromite-PGE deposits in addition to volcanogenic massive sulphides ('VMS').

The Company plans to test selected conductors as part of this summer's drill program. A drilling contract is currently being negotiated and details of the program will be released shortly.

Tamarack Project

Mantis mineral Corp has notified the Company that they have terminated the option on the Tamarack Project in order to focus on their more advanced projects.

The Tamarack Project comprises 360 claims covering over 5,700 hectares of the McFauld's Lake volcanic belt immediately northeast of recent nickel and chromite discoveries made by Noront Resources ('Noront'), Freewest Resources ('Freewest') and KWG Resources/Spider Resources ('KWG/Spider'). In addition to high-grade VMS copper mineralization discovered by Probe in 2005, the property also contains the interpreted northern extension of the mafic-ultramafic complex that hosts the new Thunderbird vanadium-titanium discovery of Noront Resources and has the potential to host nickel-copper-PGE and chromite-PGE deposits.

Both VTEM and AeroTEM surveys were flown over portions of the Tamarack project in 2007 and 2008, and the data is currently being interpreted for volcanic- and ultramafic-hosted mineral targets. The Company is planning a drilling program during the summer on any new targets identified. This would represent the first drill program on the property since 2006.

The project is contiguous with the Probe-Noront Joint Venture property, of which Probe is the operator.

Probe-Noront Joint Venture

The Company is awaiting interpretation of airborne survey data covering the joint venture properties with Noront and will finalize exploration plans once this data is received. It is expected that the single claim block situated between the Freewest and Freewest-KWG-Spider joint venture properties will be the first priority in the summer program. The claim contains the interpreted extensions of the Black Thor and Big Daddy chromite deposits, and has a high potential for similar discoveries. As part of the joint venture, all exploration expenditures will be shared equally with Noront.

McFauld's Lake

The McFauld's area continues to receive considerable attention with recent reports of high-grade chromite and PGE mineralization from Noront and Freewest Resources, in addition to continuing intersections of high-grade nickel and copper at Noront's Eagle One, Eagle Two and AT-12 discoveries. A preliminary economic assessment of the Eagle One Ni-Cu deposit reported an estimated resource (indicated) of 1,834,000 tonnes averaging 1.96% Ni, 1.18% Cu and 5.1g/t combined platinum, palladium and gold.

The discovery of chromite at McFauld's has added significantly to the area's value. The first massive chromite horizon was identified by Spider Resources in January 2006 while exploring for VMS mineralization. Noront Resources identified further chromite mineralization on its Black Bird 1 and 2 showings, while Freewest Resources returned significant intersections of massive chromite in its Black Thor and Black Label deposits. Highlights from the Freewest drilling include a 124m intersection grading 30% Cr2O3. The chromite occurrences are all located along a laterally extensive magnetic high that can be traced for approximately 20km in a northeast direction, along which many of the Probe-Noront joint venture claims occur.

Join the conversation about Noront Resources.

Reply

Replies

  1. Good Morning all, and thanks Boatboy for the news on Probe this am.

    This is great news in my opinion, particularly the part about Mantis terminating thier option on the Tamarack property, now hopefully Probe and NOT can look to have the Tamarack added into the JV agreement, some more strategic property along the RFI (Red Line). Image below shows Probes Tamarack claims in Red easterly of JV Claims.

    1. Hope I'm not sounding too critical this morning BUT why on earth would Probe wish to give Noront an interest in those returned claims?

      We've had a pretty reasonable explaination that the jv was done to settle with Noront over legal questions Noront had with Probe. That's a done deal and it's hard to see why Probe would be interested in giving up any further interests.

      Some seemed to think the Probe jv with Noront heralded some kind of 'consolidation' in ROF when the answer was far more mundane and simple.

      1. No Poly, your not too critical, the way i look at the JV is this, the JV claim units have great potential to add 800m of Chromite extension to the cummulative tonnage of Chromite just to start, we'll see what the rest will bring as exploration continues, regardless of the much more mundane and siimple explanation NOT is and will continue to add "ACRES" to its portfolio and imo any land along the RFI is that is not currently in the portfolio, should be looked at long and hard.

        Some kind of consolidation, that's what it looks like to me. Big Picture, going forward one way or the other, by simplistic measure or not, the BOD is doing that which it said it wpuld do....acquire land in the Ring.

        As such, i have updated my Maps provided to me by Carlos to reflect all the revised JV claims and look forward to making more adjustments to the claim map going forward.

        Cheers

        1. Notster:

          the NOT BoD is doing only part of the Consolidation that the Former BoD intended and were very well on their way to achieving. And the new BoD could only get this far because of the solid position the Former BoD placed Noront Resources in prior to stepping down and then continuing to support the Plans they drew up as long ago as 15 - 18 months. Seems the new BoD still needs the support of those they took over from.

          And they have yet to NAIL DOWN fnc. And the Former BoD WERE well on their way on that one 8 - 18 months ago.

          Thus, there is still more Consolidation WORK NEEDING completion! And it likely will require COOPERATION.

          Old Joe

      2. "We've had a pretty reasonable explaination that the jv was done to settle with Noront over legal questions Noront had with Probe."

        Was that explanation "official" via one of the companies or is it hearsay?Perhaps,knowing in advance that PRB was losing one jv partner,Palmer simply went out and signed another.

        cs.

        1. The 'companies' aren't talking about this but read through the forum and you'll agree the explanation comes from excellent sources. Some people 'in the know' were quite upset because they felt Noront should have stuck to their guns and hung Probe out to dry over their actions instead of settling.