Skip to content
Sign in

Post

Noront Resources

Mail Room3.2 rating from 23 members219 ptsRate

What's stoping NOT

Whats stoping NOT from buying FWR shares on the open market. They might not be able to buy all of them but they can start to accumulate. With 4 million shares being traded a day I think they could buy 1 million a day under the rador. We know NOT has the money. I was just thinking what I would do if I really wanted some FWR as much as NOT does.I own Both NOT and FWR.

Join the conversation about Noront Resources.

Reply

Replies

  1. You can't buy more than 10% of a company with filing papers, you have to file every 2% after that, and you can't buy more than 20% without making a formal takeover offer. (I think this is correct). That is why you always see big guys buying 9.9% or 9.8% of a company, after that anyone will know if they are trading.
    1. So say not has 9.9% and since they just made that offer are they free to now pick up 20%? Maybe we we will hear from them that they are accumulating and now have 12%. This is a way to start putting presure on the fwr holders. Then again this might cause cliffs to step in.

      1. Freewest Resources Canada Inc., Spider Resources Inc. & KWG Resources Inc. Provide Exploration Update on the Big Daddy Chromite Prospect


        - Hole FW-09-29 intersects 74.9 metres of massive chromite mineralization.
        
        - Metallurgical tests conclude that greater than 40% Cr2O3 can be
        considered direct shipping ore with 1.9 Cr:Fe ratio
        
        MONTREAL, QUEBEC--(Marketwire - Oct. 14, 2009) - Freewest Resources Canada 
        Inc. (TSX VENTURE:FWR) ("Freewest"), Spider Resources Inc. (TSX 
        VENTURE:SPQ) ("Spider") & KWG Resources Inc. (TSX VENTURE:KWG) ("KWG") are 
        pleased to provide an exploration update on the Big Daddy Chromite 
        property. Eight drill holes, 2,073 metres, have been completed, and have 
        tested the Big Daddy Chromite prospect (a magmatic chromium deposit type) 
        along its geophysically inferred strike length to Line 20 East, and to a 
        vertical depth of approximately 180 metres. The total amount of drilling in 
        this campaign is estimated to be 11,000 metres in 28 drill holes. The drill 
        program is deigned to test the entire geophysically inferred strike length 
        on the property to a depth of +/- 250 metres.
        
        Freewest currently holds a 50% interest in the Big Daddy chromite property, 
        while joint-venture partners Spider and KWG retain equal 25% interests 
        each, respectively.
        
        Drill Program:
        
        Drilling has progressed significantly since the last report of October 1, 
        2009, where holes FW-09-24 and 25 were reported on section 1400 metres 
        east. Drill spacing for this first pass of drilling was established at 200 
        metres, testing the entire geophysically inferred strike length to section 
        2000 metres east. Drilling has successfully encountered chromite 
        mineralization in each section. Since the start of the project in 2006 
        chromite mineralization has been established from Line 900 metres East to 
        and including Line 2000 metres East, for a strike length of 1100 metres 
        thus far. Additional drilling is underway to the Northeast in an area where 
        the geophysical expression of the chromite mineralization appears to be 
        disrupted by faulting.
        
        Hole FW-09-26 entered a fault zone in pyroxenite between 9 and 45 metres 
        depth and then continued in an altered pyroxenite to the end of the hole at 
        207 metres. No significant chromite mineralization was encountered.
        
        Hole FW-09-27 was designed to step back and undercut Hole FW-09-26. This 
        hole encountered massive chromite between 173.3 and 186.8 metres (13.5 
        metres massive chromite), followed by a second zone of massive chromite 
        mineralization between 208 and 247 metres (39 metres of massive chromite).
        
        Hole FW-09-28 was designed as a 200 metre northeasterly step out from holes 
        FW-09-26 and 27. The hole encountered massive chromite between 39 and 60.5 
        metres (21.5 metres massive chromite).
        
        Hole FW-09-29 was designed to undercut Hole FW-09-28. Chromite 
        mineralization was encountered between 117.4 and 136 metres (18.6 metres of 
        massive chromite), followed by another zone of massive chromite with narrow 
        beds of semi-massive chromite that was encountered between 234.8 and 244.3 
        metres (massive chromite over 9.5 metres), followed by a very thick bed of 
        massive chromite between 248.6 and 323.5 meters (74.9 metres of massive 
        chromite).
        
        Hole FW-09-30 was designed to test a 200 metre northeasterly step out from 
        Holes FW-09-28 and 29. At the bedrock - overburden interface of 23.7 
        metres, the hole immediately entered massive chromite and stayed in this 
        until 33.8 metres (10.1 metres of massive chromite subcropping).
        
        Hole FW-09-31 was designed to be a 200 metre step out from Holes FW-09-28 
        and 29 and to undercut Hole FW-09-30. Between 235.9 and 264.5 metres, 
        massive chromite was encountered (28.6 metres of massive chromite).
        
        True widths of the chromite mineralization have yet to be determined, as 
        this is typically done once the geometry (attitude, dip, strike) of the 
        mineralized body is determined. The systematic drill pattern as planned is 
        designed to better understand the Big Daddy Chromite Prospect along its 
        entire strike length at regular intervals; the chromite mineralized 
        intersections are quite variable due to the geological nature of the 
        intrusion. Once the current program is completed, an estimate of true width 
        will be provided. At current rate of drilling, it is anticipated that the 
        field portion of the program will be completed by early December.
        
        /T/
        
        Summary of Drill Results:
        
        ----------------------------------------------------------------------------
        ----------------------------------------------------------------------------
                                                                      Mineralization
        DDH ID     Completed  Line  Sta #  Azimuth  Dip Length            Highlights
        ----------------------------------------------------------------------------
        FW-09-24 Sep 26 / 09  14 E 1700 N      150   50    219          64.43 - 86.0
                                                                Intermittent Cr beds
                                                                  86.0 - 101.85 diss
                                                                    Cr in peridotite
                                                                      101.85 - 132.2
                                                                          Massive Cr
        ----------------------------------------------------------------------------
        FW-09-25 Sep 30 / 09  14 E 1800 N      150   50    339   151.9 - 200.75 diss
                                                                     Cr + occ Cr bed
                                                                              in Per
                                                                  200.75 - 213 fault
                                                                 213.0 - 232.39 diss
                                                                    Cr + occ Cr beds
                                                                              in Per
                                                                     232.39 - 270.35
                                                                          Massive Cr
        ----------------------------------------------------------------------------
        FW-09-26  Oct 2 / 09  16 E 1700 N      150   50    207     Cr zone displaced
                                                                            by fault
                                                                166.55 - 178.5 fault
                                                                   in Pyx with trace
                                                                         py, po, cpy
        ----------------------------------------------------------------------------
        FW-09-27  Oct 6 / 09  16 E 1800 N      150   50    321    171.0 - 173.3 diss
                                                                        Cr in Dunite
                                                               173.3 - 186.8 Massive
                                                                                  Cr
                                                                  186.8 - 189.0 diss
                                                                        Cr in Dunite
                                                                189.0 - 208.0 diss +
                                                                  intermittent Cr in
                                                                              Dunite
                                                                       208.0 - 247.0
                                                                          Massive Cr
        ----------------------------------------------------------------------------
        FW-09-28  Oct 5 / 09  18 E 1745 N      150   50    207           39.0 - 60.5
                                                                          Massive Cr
                                                                 120.0 - 137.3 fault
                                                                        with py, cpy
        ----------------------------------------------------------------------------
        FW-09-29 Oct 10 / 09  18 E 1850 N      150   50    368         70.1 - 117.35
                                                                     intermittent Cr
                                                                      beds in Dunite
                                                                      117.35 - 136.0
                                                                          Massive Cr
                                                               136.0 - 148.0 diss Cr
                                                                           in Dunite
                                                                  226.0 - 230.7 Semi
                                                                Massive - Massive Cr
                                                                 231.45 - 233.0 Semi
                                                                          Massive Cr
                                                                      234.75 - 244.3
                                                                          Massive Cr
                                                                       248.6 - 323.5
                                                                          Massive Cr
        ----------------------------------------------------------------------------
        FW-09-30   Oct 11/09  20 E 1750 N      150   50     77           23.7 - 33.8
                                                                          Massive Cr
        ----------------------------------------------------------------------------
        FW-09-31   Oct 11/09  20 E 1850 N      150   50    335         205.4 - 235.9
                                                                     intermittent Cr
                                                               beds + diss in Dunite
                                                               235.9 - 264.5 Massive
                                                                    Cr (dyked off??)
        ----------------------------------------------------------------------------
        ----------------------------------------------------------------------------
        Abbreviations: Cr (chromite), py (pyrite), cpy (chalcopyrite), po
        (pyrrhotite), diss (disseminated), Per (peridotite), Pyx (pyroxenite).
        
        /T/
        
        
    2. If anyone is buying in the market it would be arbitragers - keeping under 10% - FWR but also NOT - I guess the ratio doesn't matter too much just now. I keep thinking aloud and am veering towards the opinion that you can't lost at this stage with more news to come