Skip to content
Sign in

Post

Noront Resources

Prez3.7 rating from 288 members8.1K ptsRate

And Now For Something Completely Different

It is understandable that most dialogue of late has centered around the topical issue of merger/consolidation.

Taking a back seat amongst the majority of these discussions is the "bread & butter" of each ROF player, namely exploration and ultimately results.

Occasionally, I do enjoy going back and revisiting older news releases. It is a good exercise in that it is an escape from the day to day stuff here and at the same time, it reminds me why I am here. (and what might be forthcoming)

Below is a recap of highlights of NOT N/R's from the last few months:

21-May

Drilling resumed at Eagle One - 5 holes (2,286 mrs) June 29 N/R

29-Jun

NOT-09-049 visuals - B: 269.54 - 510.69 mtrs & C: 749.7 - 945.67 mtrs

29-Jun

NOT-08-045 - deepened in 2009 - 46.12 mtrs Ni, Cu sulphides

29-Jun

92 holes complete on the BB deposit - 25,477 mtrs of drilling

29-Jun

Micon Int. contracted to complete NI 43-101 on BB 1 & 2 deposits

29-Jun

3 drills turning - Eagle One, AT12 and Oval Lake

29-Jun

No drilling on Eagle 2 since 2008

29-Jun

BHEM on several deeper holes at E2 has been completed

29-Jun

19 holes completed (4669.5 mtrs) on Northern Claim block - assays pending

6-Jul

Assays for 30 holes from BB 1 & 2 released (30 holes outstanding)

6-Jul

NI 43-101 expected to be complete in fourth quarter 2009

6-Jul

Total 154 holes (52,344 mtrs) drilling at the BB's

6-Jul

3 drills turning - Eagle One, AT12 and Northern claim area

5-Aug

Assay results for hole NOT-09-049

5-Aug

3 drills testing the extent of the mineraization below E1A

5-Aug

All drilling is utilizing directional drilling tools

5-Aug

All completed holes are surveyed using down-hole electromagnetics (EM)

31-Aug

Final 30 holes of BB assays

31-Aug

41 holes re-sampled to allow for more accurate modelling of the deposit

15-Sep

Assays for 9 holes at Eagles nest (NOT-09-51 - NOT-09-58)

15-Sep

3 drills testing mineralization to a vertical depth of 1,000 mtrs

15-Sep

1 recently added drill with full time directional control capable of 1,500 vertical

15-Sep

Directional drilling equipment onsite - more efficient and less time consuming

15-Sep

All drill holes are currently evaluated using Bore Hole geophysics (BHEM)

15-Oct

Assays for 9 holes at Eagles Nest (NOT-09-59 - NOT-09-68) minus 64

15-Oct

Assays for Pt and Pd incomplete

15-Oct

3 drills testing mineralization to a vertical depth of 1,000 mtrs

15-Oct

1 drill added pre-Sept.15 testing mineralization up to 1,500 vertical mtrs

15-Oct

1 recently added drill with full time directional control capable of 1,500 vertical

20-Oct

Assays including PT and PD released for holes NOT-09-59 - NOT-09-68

Much information can be gleaned from such an exercise. Here are a few from my perspective:

-assays have been provided for roughly 20 holes that have been drilled in the last 5 ½ months. (what hole do you figure we are on now? – I would love to hear a few educated guesses)

-the first deep drill was added before Sept. 15/09 – almost 2 months ago - by virtue of BHEM being utilized on all drilled holes…

-There has not been any meaningful updates for approximately 1 month but in light of the current going ons, I am not surprised.

I would welcome any meaningful insights as to the above.

While revisiting some of the recent releases, it was thought provoking to see some of the highlights of each release:

Sept. 15/09

  • Hole #NOT-09-53W1 intersected 54.7metres (873.3- 928m) averaging 2.31% Ni, 1.91% Cu, 1.43gpt Pt and 5.77gpt Pd
  • Hole #NOT-09-56 intersected 68.6 metres (526.4-595m) averaging 1.99 % Ni, 0.94% Cu, 1.05gpt Pt and 3.57gpt Pd
  • Hole #NOT-09-57 intersected 50.81 metres (545.2-596.m) averaging 1.94% Ni, 1.05% Cu, 1.38gpt Pt and 3.38gpt Pd

Oct. 15/09

  • Hole #NOT-09-68 intersected 49.5metres (672.4-721.9m) averaging 2.22% Ni, 0.74% Cu
    • Including 5.5metres(716.4-721.9m) averaging 7.49 % Ni, 0.95% Cu,
  • Hole #NOT-09-63 intersected 14 metres (517.6–531.6m) averaging 2.92% Ni,1.14% Cu, 1.05gpt Pt and 5.21gpt Pd
    • Including 3.4 metres (526.9-530.3m) averaging 7.28 % Ni, 1.71% Cu, 0.06gpt Pt and 6.43gpt Pd
  • Hole #NOT-09-67 intersected 101 metres (530.7-631.7m) averaging 1.75% Ni, 1.07% Cu

Thus far, Noront’s results appear to be second to none in the ROF. I look forward to seeing what recent exploration activity reveals and understand that I will see it when they are ready for me to see it.

Cheers,

Milsy1

Join the conversation about Noront Resources.

Reply

Replies

  1. Good evening Milsy1,

    Thanks for the great review. Like you said, it reminds us why we are here.

    One thing I noticed in your review. Noront started the process for the 43-101 on Chromite as follows:

    - 29-Jun

    Micon Int. contracted to complete NI 43-101 on BB 1 & 2 deposits

    So, we are at about four and a half months and counting. Does this make sense in view of the following from FWR's NR yesterday?

    - "In addition, further to its press release of November 5, 2009, Freewest wishes to clarify that work on an independent mineral resource estimate on the Black Thor occurrence, to be prepared in compliance with National Instrument 43-101, has not yet commenced. Freewest expects that the mineral resource estimate will be completed by the end of 2009."

    Apparently, FWR has more Chromite tonnage than NOT, yet they expect to have a 43-101 done in about one and a half months.

    I wonder why the big difference in the length of time to produce the 43-101.

    C.