Noronts release of plans this morning made reference to the power requirements of the ferrochrome furnaces being a deterrent. They state that the 500 to 600 MW of power needed may not be available. This may be the case and is possibly shedding some dampening of enthusiasm. NL is planning to develope the Lower Churchill power which has the potential to produce 2800 Megawatts at a cost of $6 to 9 billion dollars. therefore the proposed furnaces need the equivalent of 20% of that capitol cost. As you may know, NL is having a problem getting a transmision corridor through Quebec and may go underwater to the island. On this news, Ontarios Energy Minister expressed regret because Ontario was looking forward to purchasing a third of that power. Obviously there is no surplus of power in Ont. unless they were hoping to displace other sources.

Without power for furnaces, who do you sell the lump ore to? the existing producers already have a surplus without the extra transport costs and the tarriffs that protectionist countries have been putting in place. We have a great chromite resource but it needs a North American ferrochrome operation in order to be competitive. I attended a CIM conference recently and actually spoke to a Cliffs exec who was presenting. He brought up another problem. Most of the steel production growth in NA is in electric arc furnaces using scrap steel because of the abundance of scrap. Traditional blast furnace operations using iron ore pellets is decreasing, as you can see in their quarterly reports that show Cliffs NA sales dropping dramatically. So, the NA market is small and getting smaller. This means competing overseas, which is a challenge. Do you really think that the current chromite producers that have hundreds of billions of dollars invested in infrastructure let a NA upstart develope a deposit that has enough chromite to decimate chromite prices forever without a fight.? I don't think so.

So, I would say there is an existing producer or a consortium of producers looking at this resource to detirmine how they can protect their interests and possibly improve their own profitability. It will be an interesting winter.

Join the conversation about Noront Resources.

Reply

Replies

  1. Your post contained...

    "Obviously there is no surplus of power in Ont. unless they were hoping to displace other sources.

    Without power for furnaces, who do you sell the lump ore to?"

    Now, I am from Manitoba and work for Manitoba Hydro (Blue Collar, I must admit) but I do know that Manitoba is in the process of building the Conawapa Power Dam as we speak. I believe that there is another project pretty much ready to go if this Dam proves profitable enough, or so I was told... I really don't think that Power supply would be an issue, if this resource is going to generate over a billion dollars yearly for a very long time. I think that the governments would be a lot faster to sign agreements if that kind of power was needed and had contracts signed for X amount of years etc. Power is one of the things Manitoba has going for it. A line from Northern Manitoba through to Thunder Bay or Timmins or whereever would run very close to the area we know as...

    McFaulds Lake!

    I am of the belief that power really won't be an issue.

    God Bless all Noront Shareholders.

    Herb

    1. What I said was,

      "Manitoba Hydro was building "Conowapa" Dam when what I should have said is,

      "Manitoba Hydro is building "Wuskwatim" Dam and have the plans all ready to build

      "Conowapa" Dam...

      I apologize. But we are really building the Wuskwatim Dam right now though. That part is correct. The ground is being moved as we speak. I even saw a job posting for a "Construction Inspector III" for the Wuskwatim Dam project. I won't be bidding on it as I don't really aspire to live way up in the north and miss my family growing up...

      Again, my apologies, and thanks to the poster who corrected me by P.M. That was very thoughtful and kind.

      Herb :-}

  2. Bruce Power Press Release:

    TIVERTON, ON – Aug. 29, 2007 – Bruce Power and the Ontario Power Authority (OPA) have amended their existing Bruce A agreement to allow for the complete refurbishment of Unit 4.

    Bruce Power will now replace all 480 fuel channels in Unit 4, extending its operational life until 2036. Under the original 2005 agreement, Bruce Power intended to install new steam generators in all four Bruce A units and fuel channels in Units 1, 2 and 3. Without new fuel channels, Unit 4 was only expected to run until 2017.

    Under the revised plan, Bruce Power expects to invest an additional $1 billion, resulting in a total investment in the restart and refurbishment program of approximately $5.25 billion.

    “Expanding our project will allow us to conduct the complete refurbishment of Units 3 and 4 in a similar manner to how we are conducting the restart of Units 1 and 2,” said Duncan Hawthorne, Bruce Power’s President and Chief Executive Officer. “We are well into one of North America’s most complex engineering projects and we remain on time and on budget. Our team of contractors is well established at Bruce A and their processes are working well.”

    Bruce Power expects to complete the work on Units 3 and 4 by 2013. Under the revised agreement, the OPA can elect for a three unit restart program if it expects there will be insufficient transmission to accommodate all eight Bruce Power units by mid 2013. This election expires on April 1, 2008. In April, Hydro One announced plans to upgrade the transmission line between Bruce Power and Milton, Ont. and expects the new line to be in service by 2012.

    Meanwhile, work to restart Units 1 and 2 continues and is expected to deliver an additional 1,500 megawatts to the Ontario power grid by late 2009 or early 2010. For stories and video clips on the entire project, please check out our Bruce A Restart web pages at www.brucepower.com.

    For further information, please contact:
    S
    teve Cannon 519-361-6559 [email protected]
    Duty Media Officer 519-361-6161

    ==============================================================

    I'm no expert on power generation, but a buddy of mine works at Bruce Power and they apparently have sizeable plans to increase their output in the near future. I'm not sure how challenging it will be to get power from Bruce to the North, but if there were power plants to the North that would have capacity freed-up once the 1-2 units are on-line at Bruce that power could be used more locally maybe?

    Just thinking out loud...

  3. Forgive me if I am wrong, but I believe that Natural gas is not capable of obtaining the extreme temperature required in the smeltering process. I don't know what the exact numbers are (I am sure Hoov would) but the only thing that comes close is propane.

    Peace

    Kelly

    1. Natural gas or propane are not appropriate from my limited knowledge of chemistry. It is not just heat. Heat in itself does nothing productive for our purposes. We need electricity, i.e. the arc to break the chemical bonds in the ore. I believe the process involved might be similar to aluminum smelting, which also relies on large amounts of electricity.

      Where there may be a saving grace is that I have read in the past of plans of harnessing some of the rivers in the north for hydro electricity.

      1. Natural gas or propane could be used to power steam turbines to produce electricity. I believe that this would be much cheaper than buying electricity. Propane could be shipped easily by rail and there is also the possibility that coal could be found along with everything else that is being discovered up there.

        Shortty

  4. A silly thought re the furnaces: With a surplus of Natural Gas, why can't we use gas instead of relying just on power. I may be way of base, and probably am, but would be interested in comments. Thanks,

    Jim

  5. dear Sir ,

    your comments are a real eye opener for some of us .

    looks like that all the hyper around the chromite is not justified for few years to come ,let alone pay a crazy price for it.

    I believe that we should go solo in our venture without carrying any dead weight.

    Thank you for your insight.

    Many regards.

  6. Daisey-chain 16 of these units together and Presto!...power problem solved!

    It’s a device that could change energy options around the planet: A company called Hyperion Power Generation claims that its miniature nuclear reactors could power anything from water purifiers in developing world villages to oil extraction sites in the remote Arctic tundra to army outposts in the desert.

    One reactor, which would cost about $25 million, would produce 25 megawatts of energy, enough to provide electricity for 20,000 average American-sized homes or a major industrial project. Daisy-chained, these micro-reactors, each one about twice the size of an average man, can supply enough electricity to power an entire small city or suburb [The Cutting Edge News]. The company says that its nuclear system is safe and clean, as it produces no greenhouse gases, and claims the reactors will be ready for mass production in five years.

    Hyperion’s chief executive, John Deal, says the company already has more than 100 firm orders, largely from the oil and electricity industries, but says the company is also targeting developing countries and isolated communities. “It’s leapfrog technology,” he said…. The first confirmed order came from TES, a Czech infrastructure company specialising in water plants and power plants. “They ordered six units and optioned a further 12. We are very sure of their capability to purchase,” said Deal. The first one, he said, would be installed in Romania. “We now have a six-year waiting list. We are in talks with developers in the Cayman Islands, Panama and the Bahamas” [The Guardian].

    Hyperion’s nuclear reactors are about the size of a garden shed, and could be delivered by truck. To defuse safety concerns, the factory-sealed units will be buried underground, and will use a weak form of nuclear fuel that the company says could only be enriched into weapons-grade material by a nation with the most sophisticated nuclear technology. The system, which Hyperion refers to as a “big battery,” would need to be refueled every five to ten years, a process the company says it would deal with at its factory.

    The company has competition in the brand new mini-reactor industry: Toshiba is reportedly working on a small-scale design for Galena, Alaska. NuScale Power, a startup spawned in the nuclear engineering department at Oregon State, was the first U.S. company to submit plans to the Nuclear Regulatory Commission, which regulates all domestic nuclear power plants [Investor's Business Daily].

    Initial "Launch" Design for Hyperion Power Module announced today at Winter Conference of American Nuclear Society in Washington, D.C. and London's "Powering Toward 2020" Conference

    WASHINGTON, D.C., and LONDON, ENGLAND, November 18, 2009 — At the Annual Winter Conference of the American Nuclear Society in Washington today, and simultaneously at the "Powering Toward 2020" conference in London, England, Hyperion Power Generation Inc. revealed the design for the first version of the Hyperion Power Module (HPM) that it intends to have licensed and manufactured at facilities in the United States, Europe, and Asia.

    The HPM is a safe, self-contained, simple-to-operate nuclear power reactor, which is small enough to be manufactured en masse and transported in its entirety via ship, truck, or rail. Euphemistically referred to as a "fission battery," the HPM will deliver 70 megawatts of thermal energy, or approximately 25 megawatts of electricity. This amount of energy is enough to supply electricity to 20,000+ average American-style homes or the industrial/commercial equivalent. "In response to market demand for the HPM, we have decided on a uranium nitride-fueled, lead bismuth-cooled, fast reactor for our ‘launch' design," said John R. Grizz Deal, Hyperion Power's CEO. "For those who like to categorize nuclear technologies, we suppose this advanced reactor could be called a Gen IV++ design."

    The design that Hyperion Power intends to have licensed and manufactured first will include all of the company's original design criteria, but is expected to take less time for regulators to review and certify than the initial concept created by Dr. Otis "Pete" Peterson during his tenure at Los Alamos National Laboratory. "We have every intention of producing Dr. Peterson's uranium hydride-fueled reactor; it is an important breakthrough technology for the nuclear power industry," noted Deal. "However, in our research of the global market for small, modular nuclear power reactors – aka SMRs – we have found a great need for the technology. Our clients do not want to wait for regulatory systems around the globe, to learn about and be able to approve a uranium hydride system. A true SMR design, that delivers a safe, simple and small source of clean, emission-free, robust and reliable power is needed today – not years from now. As we construct and deploy this launch design, we will continue to work towards licensing Dr. Peterson's design."

    Kept quiet until today, this initial design for the company's small, modular, nuclear power reactor (SMR) is the first of several that have been under co-development with staff from Los Alamos National Laboratory. Hyperion Power's market goals include the distribution of at least 4,000 of its transportable, sealed, self-contained, simple-to-operate fission-generated power units. Offering a cost-efficient source of clean, emission-free, baseload energy, the HPM will provide crucial independent power for military installations; heat, steam and electricity for mining operations; and electricity for local infrastructure and clean water processes in communities around the globe. More information can be found at the company's web site:

    http://www.hyperionpowergeneration.com/news.html

    1. 500mW required / 25mW per unit = 20 units.

      20 units X $25million = $500million

      Not too sure how that stacks up to traditional infrastructure, but it could be a good deal when you consider it includes the cost of your electricity for 5-10 years! Also, for large projects like this maybe a larger unit could be developed? Fewer larger units would be less expensive than many smaller ones.

  7. Thanks, RHammer for the reply. Another thought: (oh goodness) How about transporting Propane (LP) on the rail line that will be built?