Skip to content
Sign in

Post

Noront Resources

Treasurer2.4 rating from 111 members752 ptsRate

Metal Prices

I haven't been a shareholder all that long and haven't tracked this, but wonder if, as the deposits grow, the stock price will be increasingly affected by metal prices - particularly Ni and Cu (not entirely forgetting PMs too)

Join the conversation about Noront Resources.

Reply

Replies

  1. NOT's ores consist mainly of pentlandite, a nickel-iron- sulfide mineral. In addition there are copper containing minerals, as well as various precious metals such as gold and silver, and even more importantly the platinum group metals with platinum, rhodium and palladium.

    From a money point of view, we are mainly interested in the nickel minerals that also contain most of the platinum group metals. Although there is chalcopyrite, the copper containing mineral, it is not as important since the price of copper is much less than that of nickel.

    At Norilsk(huge nickel producer) in Russia with a high content of platinum group metals, the recovery of these metals pays more or less for all the operating costs of the whole facility, so yes in high contents they are very important.

    Typically the ores contain about 2% nickel as the main valuable metal. The ores are treated in a mineral processing facility basically to separate away the iron sulfide minerals and the product from this, called a concentrate, contains around 15 to 20% nickel. This means that the nickel has been enriched about 7 to 10 times to reduce the amount required for shipping to a smelter somewhere. However, what has been separated away, roughly 90% of the whole ore, causes environmental problems if left around and has to be processed and stored in large tailings dams. This is potentially the biggest environmental issue of the whole treatment process, since basically they have to be stored forever and not allowed to dissolve and leak out into the environment. This is done successfully presently in Sudbury and other places, so yes it can be done, but for sure pretty rigorous environmental assessments have to be met before permits are provided.

    The various valuable metals will be recovered, at least 90%, in the nickel and possibly also a copper conentrate, and then shipped to a nickel smelter for further enrichment and then a refinery for final recovery.

    The future expected prices of all the various metals are critical to any financial evaluation. To do this they look at expected future demand and then compare that to future expected production rates of the various metals. They have to try to do this for at least 10 to 15 years forward. This is easier to do when purchasing an already existing plant since production is already ongoing, but it is much harder for a project like in the ROF since they also do not know the exact start-up date, which could easily be 5 to 10 years ahead. These uncertainties are some of the reasons why companies like Vale and Xstrata do not jump on any such development. They may consider just to wait and let someone else do most of the ground work before deciding. Although they will have to pay more, there will be more certainty and the time line to reach production will be less.

    The grades and value of the ores found so far are outstanding, but more has to be discovered to justify all the necessary infrastructure and processing facilities. Seeing all the progress so far I suspect that much more will be found at various locations under various ownerships. For sure the ROF will be on the headlines for years to come.

    1. 'However, what has been separated away, roughly 90% of the whole ore, causes environmental problems if left around and has to be processed and stored in large tailings dams. This is potentially the biggest environmental issue of the whole treatment process, since basically they have to be stored forever and not allowed to dissolve and leak out into the environment. This is done successfully presently in Sudbury and other places, so yes it can be done, but for sure pretty rigorous environmental assessments have to be met before permits are provided"

      This is why underground mining and tailing backfill of shafts and drifts are, although more expensive, also more ecologicaly protective, and will become over mine life a more cost efficiant way of desposing of waste. This in turn will be a more logical way of mining as the footprint in the wetlands will be smaller and less invasive. Big aboveground pits are expensive to water infiltration protect and have the need for large mountains of waste overburden storage. This overburden can be replaced into the open pit as the pit moves out of ore areas but with many years of above surface storage wind damage and leaching can be much more damaging. Noront has taken the better approach to the envirorment over profit and as such should reach permit stage quickly.

      1. Crazytrade,

        the mode of mining is determined by the ore body and its shape, in this case for sure most of the mining will be underground. The tailings is another issue, they are formed after the ore is crushed to less than 0.1 mm or so in size. This means they do not have much mechanical stability and it is limited how much you can use as backfill underground. Some will for sure, but most will have to be filled in and stored as tailings dams. As I mentioned before this can be dealt with, but many factors such a appropriate location, drainage, max rain fall etc all play important roles. Tailings are just one part of the overall nickel sulfide business.

        1. You seem to be saying that there are many problems ahead which I guess we know, but I was wondering what effect metal prices might have on the stock - in spite of all that lies ahead

          1. Hi Columbo10. I wonder too. But, think although it may be helpful, NOT is a "Prove It Baby". And she will.

            The other problems are solvable. Look at Sudbury. From moon scape to green. They will figure it out.

            vermillion.

        2. With chromite reserves Noront is in the enviable position of being able to eliminate surface tailings. Direct shipping of chromite ore will leave large voids in the mine that can be used to place all of the backfill produced by the concentrator.

          AFS

            1. Replying to @tau

              Hi Vermillion - I guess if the ore body becomes large enough the stock will become a mineral play to some extent - so one hopes

              C 10

        3. Good morning Tau. Down here they have been expermenting with using fine tailings to backfill. When through with an area, they simply block it off leaving a large diameter plastic pipe which extends to the end of the area, then pump a loose consolidating mixture with some coarser materiel, cement , clay ??? to completely refill that specified area, commencing from the impermeable barrier and working back to the face of that working, which soon contributes greatly to stabilizlization. Obviously it has severe limitations for delivery, but where useable, forms a permanent strengthening structure.

          Others use it as a base for structural materiel. Which can be used in the surrounding communities. A possible side benefit where there is scarcity of building materiel such as up at the ROF.

          Don Jose de La Mancha

          1. We have tons of (slag) up here. We used to use it for driveways. I don't think you are allowed anymore because of the leaching out. Slag looks like small, sharp, black shiny pieces of stone. They pile it high and long in places in Sudbury, and then grass it to hold it down. We also have a 1200 foot stack that blows the sulpher East. (Ouch).

            Before, you could see the the grey sulpher rolling in from Sudbury, and you could taste it as well. We lost a lot of green. We were barren. Now, we are green, our lakes are beautiful, and trees have come back. It took a lot of planting, and nurturing. The byproduct of mining can be very ugly. Hopefully, we are doing better.

            vermillion.