Paved road mixed blessing

Carl Clutchey
Tuesday, March 8, 2011 - 08:00

Though he lives in one of the most remote parts of Quebec, at the 54th parallel near the northern point of James Bay, Abraham Rupert rarely feels isolated.
If he ever feels so inclined, the chief of about 4,000 Cree at Chisasibi First Nation can drive 14 hours straight on plowed asphalt all the way to Montreal.
“There are people (who make the drive) in one shot,” Rupert said Monday from his community overlooking the Grand River.
Highway 109 in northwestern Quebec was built decades ago to facilitate hydro development. A separate 90-km branch road — also paved — leads directly into Chisasibi.
Year-round road access means that Chisasibi doesn’t have to bear the exorbitant cost of having heavy freight like fuel flown in — a relative luxury that Chisasibi’s 54th-parallel dwelling counterparts in Northwestern Ontario don’t have.
Currently Northwestern Ontario’s most northerly paved road — Highway 599 — stops at Pickle Lake just above the 51st parallel, a full 250 km shorter than Quebec’s Highway 109.
That could change if the Ring of Fire mining complex is developed about 500 km north of Thunder Bay in a few year’s time.
But it’s not yet clear what role the Ontario government and mining companies would play in creating an-all season road, or whether it would be paved like Highway 109.
Most of Northwestern Ontario’s remote First Nations rely on a network of seasonal winter roads, a system the province funds, but is only effective when the mercury remains low for several weeks.
Rupert said the Quebec provincial highway which has connected his reserve to the rest of the province was a mixed blessing.
“There are economic benefits and we are not isolated,” he said. “But personally, it was not all great: the hydro brought dams that affected our lands.
“We used to be on an island, and then we had to move.”

Join the conversation about Noront Resources.

Reply

Replies

  1. Thanks for making this post of an example of what could and should be in northern Ontario.

    Initially it need not be a paved road to the Ring. I suspect a gravel road in good condition and with bridges being built to carry heavier loads would be better suited. In other words, I would prfer more money be spent on stronger bridges than a paved road. The paving could be added when more money comes in from taxes on operations.

    I have no qualms about using my taxes to develop that region.

    Just a feable opinion from a southern Ontarian.

    1. Once truck traffic exceeds a certain daily level annual maintenance costs for a gravel road exceed the long term costs for a paved one. My local council was quite eager to pave the road past my gravel pit when the maintenance supervisor pointed out the costs incurred with 100 loads per day of traffic.

      Put down gravel, use it for a year or two till the base stabilizes then pave it properly, NO scrimping on design or materials. Road needs to be built with finished pavement incorporated in the final design. Nothing fancy but relatively cheap and functional.

      Peter

      1. I agree, but sorry there aint no way of cutting corners over muskeg the base is what cost the big dough..asphalt is a small part of overall cost.

        1. Check out how the logging companies handle the problem. Ground support fabric over the muskeg then gravel followed by pavement. I have bridged deep quicksand easily in the past where you couldn't walk on it by rolling the fabric out ahead. An hour later the semi's were backing over it and dumping their loads. Road building is not near as difficult as imagined.

          Peter