  1. There is diferent sized SUVs and it is only a 4 inch pipeline .What i am refering to is minning trucks carrying 150 ton payload will not be on this road as the oar will be pushed down through the pipeline to pickle lake .There it will be loaded and sent further down to Nakina via big trucks ,and the road bed will have to be supper good for the loads.The winter road probably crosses on some lakes making it necessary for the perminent road to go around or build a bridge .but there again the bridge would not be built for 200 ton loads .