I'm not sure if this information has already been posted. However, I'm going to share it anyways. The Road from Pickle Lake to Webequie to Esker Camp could be started as early as 2013.

Join the conversation about Noront Resources.

Reply

Replies

  1. i posted earlier that a contractor from fort francis told me he has equipment up there and they started already..im in arizona and he left his motorhome here and said he would be back the end of march i will bleed him further to find out what there working on..i know permits bla bla...but he told me there working on it...kennnr

  2. RHammer: "As Nakina Girl just posted, it is possible that it could start in 2013,"

    In Feb/2011 I spoke(and posted) my coversation with Paul Semple regarding the building of the RAMP (early revenues; more stable underground drilling platforms, etc,etc).

    In this conversation in which Paul said that the Permitting WAS the critical path, I specifically asked Paul if there was such a thing as a "pre-permitting process". Paul said there was, and that he would take advantage of it if the opportunity presented itself. He said that this " Pre-permit" would enable the bringing in (over winter roads) the necessary heavy equipment to build the RAMP.

    Could not this same/similar heavy equipment be used to early start the road that Nakina Girl has heard about?

    This pre-permit would enable the road/RAMP start in calendar 2013.

    Peter

    1. dont think you need much of a permit to upgrade a road that already exists..what you need is money....fn and noront maybe...ken

  3. Yes, it will be some time before we see an all weather road come to fruition between Pickle Lake and Webequie, no doubt the road has been in the design stage for some time and will need to pass the usual regulatory hurdles these types of projects are subject too.

    To give an idea as to the length of time the process can take one could look at the Inuvik to Tuk Highway project.

    135 kms. of all season road across the permafrost, less than half the water crossings and no large rivers need be crossed. The construction is not typical cut and fill construction as the plan is to fill only to leave the permafrost undisturbed. Granular is found in various sites along the proposed highway to provide the necessary fill material.

    The projected cost for the highway? How about $300 Million! By the time it is finished probalbly closer to $350 Million. It will be a thing of beauty to drive and will take tourism to new levels in the area and benefit all stakeholders.

    This project has been in the planning and development stages since 2002 and talked about forever. Finally, there is light on the horizon for this highway.

    some info on the project: scroll down to page 4

    http://nnsl.com/archive/pdf-archives/in030112.pdf

    All weather roads are desired by many across the country, unfortunatly the clear reality is that very few will get them. The advantage for Webequie in the scheme of things is such that the Noront plan, by all appearances, seems poised to provide opportunity if not justification for such a highway.

    In my own back yard of Alberta..one still can not drive across the top of the province east to west. Behind the times... hell yeah.

    1. I have read some concern about crossing rivers on the north south corridor for the rails .I live in a small town which has two huge rail bridges in it built well over a hundred years ago ,by men and horses with shovels ,the big shovels were pulled by the horses.the bridges are layed on huge stone posts about 150 feet up in the air,the aproaches were leveled to look like a canyon .

      bridges like that would be no problem in todays big machinery and expertise in moving equipement and materials .the big problem is getting it started .

      BJ

  4. i rest my case they must be working on the road you mentioned that already exists...thanks...ill ask him just to verify....ken

    1. plus he mentioned they have built 2 bridges...wont have to be frozen next year there hmmmmm...just thinkin....ken

  5. if the road is already there the plan and permits have already been granted...altough i can see them needing permits for those bridges which i was told have been built.....im just speculating on a conversation i had with a contractor...ill wait for an update when he returns.....later...ken