Skip to content
Sign in

Post

Noront Resources

Replies

  1. NevilleD had advised of this presentation on Monday but they removed it from the website to make corrections. So, thanks for pointing it out again now. When I read it on Monday I noticed on page 13 that it says that Blackbird is a "pipeline" project. I was not aware of that.

    I am aware of the 90km concentrate pipeline planned to transport the Eagles Nest nickel-copper-precious metals to Webequie Junction. However, that is the first that I recall hearing about transporting chromite via a pipeline. I called the company on Monday and asked if I could speak to someone in regard to that and was told that they would call me. I have not heard back from them so I guess I'll call again tomorrow. Is this old news that I just didn't pick up on before?

    1. Maybe just terminology, Brent. A common phrase that I am quite familiar with, is that when a project is in some stage of development, or consideration for development, is to say that it is "in the pipeline"

      Best regards

      K

      1. Thanks K, I was wondering that also but thought I'd ask. The lady that I spoke with was under the impression that it would in fact be a pipeline. That is when I asked if I could speak to somebody else because I think I've read that it is either not economically feasible or just not possible. I suspect that you are correct.

        1. I asked that specific question at PDAC of Mark(I beleive) and he stated that yes the pipeline could be used for the other ore as well, they would just require an extra pipe along side for pumping recycled water.

          Regards, K

          1. I wonder how much chrome ore could be transported over the 90 km ice road to a holding yard so that it could be transported out through out the rest of the year along the all season road. A stockpile 90km away from a mine is not unheard of in mining. A lot of ore could be moved in a month or two. Bao steel will want its ore to be specificaly made for them and with just one customer taking Noronts chrome it is simple to keep a supply chain.

          2. I just spoke with the young lady at Noront again. She told me that she asked the appropriate people in regard to my pipeline question and the response was that they just don't know for certain at this time. She said that they are evaluating their options at present. I then specifically asked if transporting chromite by pipeline was one of those options and she said, yes.

    2. The idea of a chromite pipeline was being discussed on the KWG board at SH. This is my contribution to that debate. Unless the company receiving the chromite is willing to work with chromite fines, I don't think the idea flies.

      Here's a copy of my post:

      "I looked at a few different ore pipeline projects/proposals, and I discovered that the particle size is a critical element. The longer the pipeline, the smaller the particles have to be. The NML pipeline proposal specification for particle size was 90% less than 44 micrometres. That's 0.044 mm, or less than 2/1000 of an inch. The bauxite pipelines somebody else posted about allowed a maximum particle size of 250 micrometres (just under 1/100 of an inch), but with a 50% cutoff at 45 micrometres. I did find a coal pipeline project that permitted particles up to 1/4 inch, but it was very short (6 km), and there was also a partial buoyancy effect at play.

      So what? The reason the particle size is so important is that the slurry must maintain turbulent flow characteristics. If it slows down to laminar flow, sedimentation will occur. The pipeline will clog. The longer the pipeline, the smaller the particles have to be.

      Another issue is the abrasive character of the particles. Smaller particles are less abrasive than are larger ones of the same material, but special liners are required under more abrasive conditions. The taconite under study for the NML project has a Mohs hardness of between 7.5 and 9. Steel comes in at about 5.5. So, a liner would definitely be required, I would suggest. Chromite also comes in at 5.5. Looks like a liner would be required here, as well, as the chromite is just as hard as the steel.

      But let's assume that these issues are themselves manageable. What do you do with what comes out of the pipeline at its destination?

      The taconite (NML) would have been crushed that finely anyway. It's part of the concentration process. It will later be pelletized (by sintering) in any case, so shipping it to the port before pelletizing it makes good sense. Bauxite is processed into alumina as a powder. No issue there. And coal furnaces can be easily modified to burn powdered coal. But what about chromite?

      The highest grade (best price) chromite ore is lump chromite. I think the smallest particle size for that grade is 1/2 cm. (A quote that I looked at specified minimum 46% sized between 2 and 8 cm (3/4" to 3")). With a slurry pipeline, you have no lump ore at all. It's all fines, which get 1/2 to 2/3 the price, if it can be sold at all. Chromite fines are very difficult to process in the smelters, because gas flow is impaired.

      It is possible to create chromite pellets, but as far as I can tell that's a patented process (license fees = $$$), and the pellets don't command the price of lump ore, either. Moreover, you've expended considerable energy to crush the ore, to later dry it, and to sinter (roast) it into pellets. To say nothing of the cost of the additives that bind the pellets. Looks to me like you spend a lot of money to end up with a less valuable product.

      I'm not in a position to provide an economic break-even point for comparison purposes, but I think direct ship lump chromite ore has a pretty clear advantage over a slurry pipeline.

      Lar"

      1. Hey Lar,

        You talk like a process engineer. excellent post, lots of relevant info!

        I have also replied to Chauncey post, looking from a macro-economic point of view, i.e. scale is much larger which would cost a lot more than the Ni case but did not go deep in the fluid mechanics details (turbulent/laminar flow and clogging up the pipe, etc). I did touch on the abrasive issue, but did not do any in-depth research.

        Ni would fetch more $$$ anyway. As I recall, their plan is to start with Ni first and then puch a hole through to get at chromite. Yes, trucks would be more economical and NOT would wait for the N-S RR to be available to put the stuff on the train. They don't need to truck it too far to KWG railhead at Koper Lake. May be they want to buy the next door claims from FNC to put a squeeze on CLF (they are boxed in, can't get their chromite out if they don't want to negotiate nicely).

        Anything is possible, but it has to be economical.

        goldhunter

        1. "May be they want to buy the next door claims from FNC to put a squeeze on CLF"

          What are the chances of that in light of the new jv on those claims?

          Kerry.

          1. "What are the chances of that in light of the new jv on those claims?

            If NOT is willing to pay some cool cash to FNC for that next door (mirror-image) L-shaped property, presumably NOT can assume FNC position and the JV with BOL headed by "NOT chairman-for-life" (remember Richard N?) would remain the same.

            What sort of impediments created by the JV that you had in mind? The same question can be posed if somebody (CLF is a good candidate) decides to take a run at FNC for the entire company. I would think that the JV with BOL would not be the show stopper, as long as the predator company does not try to break the JV agreement.

            goldhunter

            1. Replying to @goldhunter11

              "What sort of impediments created by the JV that you had in mind? "

              There is a history here that you seem unaware of.I really don't see Nemis,Harvey et al working in any way shape or form with the hedge fund bullies that took over NOT and sent them packing.No amount of money could make that happen!! JMO?

              Kerry.

              1. Replying to @cappysmart

                Cappy,

                History, history, history. Yup, one would learn a lot from it.

                I have been following NOT since the time the "honorary chairman for life" was in the saddle and had his picture taken in front of Johnny and June. Getting booted out is not something one can forget easily, but is there any chance for kiss-and-make up, inview of the fact that the chief instigator of that palace coup has gone somewhere and does not show up on the corporation info list on slide 4? But, time cures everything.

                It's now #1 RCF and #2 Baosteel (but that gonna change, soon)...Also, there have been many changes since then. If Mr. Li said to Wes something like "it might be a good idea to do something about FNC"... would there be any impediment along the way for a kiss-and-make up? Note: Baosteel is a 300-lb gorilla, not quite 700-lb like BHP, but heavy enough with a market cap of something like $30B, enough to shower the old combatants with cash, especially if the cash comes with polite words like "please, just for me", haha.

                goldhunter

        2. From what you are saying about buying FNC claims, you believe owning the mineral rights includes a right to refuse transit over the property. Several subsquent posters also comment on the difficulty or otherwise of "buying" these claims.

          Am I incorrect in believing there is no problem in transiting claimed property so long as you do not interfere with works erected by the claim holder? This issue, of course, will have considerable significance in the ROF, congested with claims as it is.

          O.F.

          1. As I understand it, through a claim one has a right to what is IN the ground but the surface has to be bought as any other surface property to control it.

            Also one can not buy all the property around someone else's and deny him access.
            Right to access is basic to all surface agreements. I have no experiance with land but being a former sports fisherman, at least it was so in Ontario, one can not buy all the land around a lake and deny fishing access. To deny fishing in such a lake one had to buy all the land under the lake or having bought the land first afterwards created the lake via a dam on it.

            This applies more to the staked north-south rail line route. Those claims have little influence on the rail line path except that they may control access to and use of any gravel or other construction materials that may be needed.

    3. Chauncey, that phrase "Blackbird is a pipeline project" on slide 13 of the lastes Corporate Presetation is quite confusing for many people, especially they proposed a pipeline to carry Ni concentrates from the site to Webequie Junction. I would tend to read this as "Blackbird is a project in an early stage, i.e. in NOT work pipeline". This is loose talk and should be rephrased to avoid confusion. I have sent an e-mail asking for a confirmation, but not sure how fast their response is to e-mail (my first e-mail to them).

      The reason I discount the slurry pipeline for chromite is because:

      - with Ni the volume compression ratio is quite significant when they produce Ni concentrate (say from 1.5% ore to 10% Ni concentrate. This factor of 6 would reduce the pipe size and the pumping power. The slurry when it comes out at the other end of the pipe will need to be de-water and dried. The returned water would be pumped back to be recycled. The less water used the better, since they will score points with the environmental folks.

      - With chromite, the practice, I presume, is not to produce high % concentrate (any process engineers in the house?). If the quality of ore is high enough to be qualified as DSO then they would prefer to transport it out directly from the site via trucks and rail to Sudbury for smelting. They can stockpile ore at Weberquie Junction via ice road and pick up the journey with the proposed all-season road.

      - Also, as I understand it (again any process engineers in the house) chromite because of its bulk is not economical the be transport by pipeline (much bigger pipe, pumps, return pipe to recycle the water, pumping power (hence larger generators), i.e. teh scale is many fold larger, in addion to "chromite is abrasive/corrosive?" hence not suitable to be transport in slurry pipe.

      Just my take, feel free to correct if anyone has more reliable info.

      BTW, if you are in the Toronto area (I am not, long distance charge), perhaps you could give NOT a call to check all this out?

      goldhunter

        1. SideThree,

          My guess #1: Baosteel will try to overtake RCF (listed in the new presentation as the top dog). There is no way that Baosteel will take this lying down (face is very important in the Asian tradition, 19.9% would do it after May 2). After all it's a 300-lb gorilla compared to CLF a 100-lb gorilla (30B versus 10B) and a few $M is chump change. Unless, of course RCF is one of their friendlies which was set up as one of 5th columns. Perhaps CLF is doing the same thing, but be careful, you don't mess with a 300-lb gorilla.

          goldhunter.