power lines

If they build a high tower line the helicopter and crew can put up as many as 50 towers a day. [seen on TV]

Anchoring towers in muskeg would slow it down but you do not need a road

There is no road to speak of. In some cases the only some trees are cleared out.

Join the conversation about Noront Resources.

Reply

Replies

  1. Helicopters are expensive to use. I have seen towers (think it was Ottawa River or Huntsville area) with power lines and the trees were cleard for about 5 meters either side. No road in common sense did exist but I think there was a path worn out, probably by four wheel driven vechicles. I think someone on this forum has some power line know how - is it Herbertwiebe?
    1. If Noront is going to have men up there building a mine ,they will need living accomadations suitably for extreme winter weather .they cant fly back to Thunder Bay every night ,so this would have to come in on a winter road,so lets hope the plans are in the works to get started this winter and quit waiting for N/S

      BJ

  2. Noront would also need some kind of road to lay down their slury pipeline ,I dont know what would happen when they get to a lake or river.There is enough pipe stored in that feild waiting on the Key Stone line to run the slurry to were ever it has to go .

    BJ