Skip to content
Sign in

Post

POET Technologies Inc.

Prez3.8 rating from 189 members10.4K ptsRate

3 Walls - Weekend reading.

http://www.edn.com/design/systems-design/4368858/Future-of-computers--Part-2-The-Power-Wall

http://www.edn.com/design/systems-design/4368983/Future-of-computing--Part-3-The-ILP-Wall-and-pipelines

http://www.eecs.berkeley.edu/BEARS/presentations/06/Patterson.ppt

fairchij

Reply in POET Technologies Inc.

I will try to explain my understanding Silicon CMOS is putting a billion transistors on a chip. Each time they shrink the transistor that transistors performance has to be reduce to avoid melting the chip but since there are more of them there is an incremental improvement to ...

Join the conversation about POET Technologies Inc.

Reply

Replies

  1. So this is quite revealing...and in our case, exciting. But it does bother me a little bit that the possible solution (ie POET) isn't mentioned (unless I missed something).

    Simiarly, on the PBS Nova Program, David Pogue did a very good piece on the future of computers "Making Things Smaller" and again, there were several solutions, none of them out of UConn's Lab.

    Are we really still, THAT under the radar? If these bottlenecks are such a problem, why aren't we hearing more? Is that solely Atomic's job?

    1. This is outrageous. No mention of any milestones and we are two weeks into the 3d quarter. Who cares about the Gagnon guy. Does management think that will appease us.

      NO, I WANT TO KNOW ABOUT MS 5 AND MS 7????!!!!!!!

        1. You can't say they've fallen off track, unless you know they have which I have to assume tou don't know because you are asking for an update

          I trust the team is working diligently on the monetization or commercialization efforts and Taylors team is working hard on #8 in the lab.

          My only concern continues to be share price now in October, I would be significantly more comforted by a much higher sp for this stage in the year, hopefully next week. I had suspected the large dumps were tax loss selling I just hope those sellers start buying back the shares soon and drive the sp up if that was the case

      1. I took the time to call Chris and talk to him about this last week. He told me that the MS5 and MS7 milestone dates were estimates, and that the company had to have reliable repeatability and be able to achieve these goals consistently and on a mass production level before announcing accomplishment, which makes sense to me. He also told me that he made management aware that anything past 4 weeks without an update is what would be considered unacceptable to the market regarding the due date on milestones as we would be a third of the way through Q4. I was reassured that a PR would be issued before that time to update the market on these milestones. I can live with that, as I am in this for the long haul and understand that disruptive technology takes time.

        GLTA... bp

        1. bp124,

          Thanks for doing this for us. I feel like if we all called IR more often - not to pester, but to get answers - we would all be able to endure this MS news drought more comfortably. I think many of us are still in Agudow-mode, thinking that IR is incapable of understanding POET. In my experience, things have changed and contact with IR has been very fruitful. I've notice the following changes:

          • Chris finds the answer if he doesn't have it on hand. He contacted POET to find out about the p-channel and got the best answer possible.
          • IR is 2-way communication. When many shareholders express concern he will take the message back to management.
          • He advocates for both the shareholder and the company. If a shareholder is being unreasonable of obtuse (zincfinger comes to mind) he will react accordingly. He has also shared experiences where his company has severed the relationship with a company when they do not appear to be performing their duties towards the shareholders. Chris has said on multiple occasions that POET meets his standards in this regard. Even now as POET remains silent after the CP deadline came and went, Chris feels POET is acting reasonably responsible.
          • IR is independent of the company. When Agudow was doing the IR, she couldn't be trusted to perform her duties impartially. This is ignoring the fact that she was totally out of her element when discussing POET. She was more for the solar side. I have a feeling Grayling would drop POET like a hot rock if they started pulling the same crap as the old regime.

          I know there is a diversity of opinion about IR and their role as a company rep. But for my money we are lucky to have an independent company willing to seek answers and express concerns on our behalf. We should all take advantage of this for our own sanity:)

          1. Is there a role currently that is responsible for finding new investors, institutions, investor shows for promotion, awareness so there is more demand for the stock, and the stock price goes up? Or is sp more dependent on a special event occurring?
        2. thanks bp124, i appreciate your post and that helps me undestand whats going on. it still to me like they did not complete ms5, which is concerning because back in June they said they were only weeks away.

          right now, i'm not as concerned about ms7 because that is only a matter of bae replicating what poet has done, although POET management estimated poorly on bae's completion

          good luck to all; here's hoping to an announcement tomorrow!

          1. There's lots of goodness besides IR that we could be talking about.

            The last substantive POET update NR referred to products already in the delivery pipeline. What could they be?

            Well, if I could be allowed to speculate, I would say that it's the same IR sensor and OE interface that was mentioned in past CPs.

            http://www.poet-technologies.com/wp-content/uploads/2013/07/OPEL-July-2012.pdf

            Notice that MS5 doesn't seem to be an integral component in either of these products (see required milestones on slides 19&20 for confirmation). I think that may be one of the reasons why it had been pushed aside in favour of MS6. Also, MS6 is a prerequisite for the new MS8, hence the acceleration of MS6 and the following addition of MS8 - both at the behest of the SSC. I think the SSC is orchestrating interest in a third product, a commercial product (as per the wording of the 100nm NR) which suddenly took precedence over MS5.

            Again, if I was to be allowed to speculate, I would say the holdup might be related to the fact that MS7 was the final required milestone in order to make the IR sensor a reality.

            Oh, and there's this quote from the G&M article:

            "Still, POET hasn’t had any takers even though the company has been around since 2000 and Dr. Taylor’s work has been funded in part by the U.S. Department of Defense. The company says defence manufacturer BAE Systems and others have validated the platform “and are developing solutions to be deployed into the market by early fall,” but proving that the technology can be replicated in large volumes is one of the obstacles that POET believes it will be asked to prove."

            Early Fall? Like now?!

            With all this information at our disposal it seems like a high probability that BAE will be the ones "deploying solutions" with POET inside, considering the only MS missing from their 19 year investment was likely completed a few weeks ago.

            ***

            Question: is it likely that public companies negotiating deals would agree to a media blackout? I'm really asking, not just trying to be suggestive (I hate when people do that). I'm asking becasue it could explain why they are restricted from releasing MS5, even though it was done at the POET lab and that it apparently isn't needed for the IR sensor.

            1. Replying to @oogee

              Also, lets not forget, posted in your post Oogee, was this quote from G&M,

              but proving that the technology can be replicated in large volumes is one of the obstacles that POET believes it will be asked to prove."

              Let us hope this is not the reason for the delay(s). And if so, let it be solved asap. Pizza!


            2. Replying to @oogee

              oogee...are you speculating when you say?.... "the only MS missing from their 19 year investment was likely completed a few weeks ago".

              Quite frankly, I find this very hard to believe, because if this is the case as you suggest; I don't believe POET would be holding it under wraps. If they are.. then the question should be asked..why?

              1. Replying to @woundedknees

                Gee, I'm right disappointed. I thought someone (maybe oogee) would answer my post(question) to his post. Which was why would POET be holding back an announcement of completing their most important MS? tia

                1. Replying to @woundedknees

                  Because MS5 and MS7 aren't finished yet. Perhaps they will finish MS5 this month ( and they will let us know ) and MS7 will be for november. So yes there is again a delay.
                  I don't know why POET doesn't send out an NR with this info.
                  But if you contact POET, they will explain.

                      1. Replying to @jammingthepipeline

                        I alluded to this phenomenon months ago. The folks who happily share postiive "insider' information on here will never share "negative" information. Seems that most people here didn't mind that some folks had "insider" information when it was all grass and sunshine.

                      2. Replying to @jammingthepipeline

                        Jamming, are you misleading this board? First you said that MS5/7 aren't finished yet and MS7 will be for November (you don't even state this is your opinion) and then you say "I think some other people received this info". How can you just "think" other people received that specific info yet state it as if it is a fact?

                        What the heck... which one is it, fact or your own opinion?

                          1. Replying to @jammingthepipeline

                            So jamming you claim that some people have recieved bad news from the company based on conversations you had with POET but you are unwilling to share the conversation that led you to this conclusion?

                            1. Replying to @fairchij

                              I will try once more. Based on two conversations I had with POET, I personnaly think MS 5 and MS 7 aren't ready yet. I was told if MS 5 would be ready before the end of October, they will release it in an NR. I got the impression that MS7 isn't ready yet and we will hear about that October 29-31.

                              As I told you before I was not planning to participate on this forum anymore, but I thought to share this personal information.

                              The near future will tell I am not fooling around with this board.
                              And that's it.

                                1. Replying to @fairchij

                                  My guess is he spoke to no one at Poet....at Poet? Its like saying I spoke to Apple or I spoke to Intel....WTF does that mean.......you spoke to their answering maachine?

                  1. Replying to @jammingthepipeline

                    If they can explain to you, then they should be explaining to everyone in an NR! What exactly did they say?

                    Whats more bothersome is how can they allow for this if their latest CP update in Sept still indicated those milestones would be completed in Q3. That was just weeks before the end of Q3!! Surely they would have know at that time whether it was reasonable enough to leave them in Q3 and they decided to do so, so there is no excuse in my opinion. This is terrible management of shareholder expectations and hence the SP is suffering and by the time they do release something it could take a 25%-50% gain just to get back to levels that were already unacceptable but at least at a point where most of us are above water.

            3. Replying to @oogee

              You make some very good points as per usual ,,oogee !! We are now in early Fall so we will just have to wait and see.. I will be here untill the end anyway ..

            4. Replying to @oogee

              Good post oogee. Also notice the detail below no longer exists in the current CP. The names of all the military companies that were listed below have been removed. One possible conclusion is that a deal could already have beeen structured and as such they would not want to continue listing the names of all the possible military companies.

              Licence or Sale to Military Equipment Manufacturer

              BAE has made significant financial and human capital commitments to the development of a functional sensor based on POET technology

              BAE is a market leader in infrared military systems and has strong internal technical capabilities with GaAs; POET technology could potentially offer advantages for multiple high-tech military applications

              It is intended that electrical structures will be integrated with the required optical structures in the future

              Examples: Northrop Grumman, Lockheed-Martin, Boeing, General Dynamic

  2. What occurs to me while I read those excellent links that oogee posted was that POET’s current approach is severely dumbed down to meet the current needs of the industry. It is really a stop gap to continue on the current path. But POET so much more than this and the people who have intimate knowledge of what POETs capabilities are very aware of this.

    This clip is worth listening to again. POET needs to get big partners on side to move POET into the existing commercial world but without reinventing the wheel. The photonic side of POET that offers an extreme step change in data processing, transfer and memory is just so much more than what exists today.

    The world is not ready for POETs full potential but I bet that those people who are getting in on the first wave of POET in electronics see the ultimate future that POET offers.

    http://www.youtube.com/watch?v=NH9yj3u5Nig

    Really listen to this clip because it really does collaborate those articles that oogee posted. Listen to it right to the end.

  3. Thanks Oogee...great read. Anymore u links u can post or send my way via PM so I have a better handle on POET. That request is for anyone on this forum who may be able to pass along more reading material. Cant put this stuff down.

    Thanks in advance.

    PC