Skip to content
Sign in

Post

POET Technologies Inc.

Treasurer2.6 rating from 49 members378 ptsRate

Critical Path

For the update on the 28th, I think mackwheaton's wish list mirrors how I feel.

An optimistic tone from Management on the 28th.. on acheiving positive cash flow before the new money runs out would be very positive. In other words no additional financings required in the foreseeable future.

Failing this, I really want to hear them outline a critical path for bringing the VCSEL to market that is achievable with current funds. Factoring revenue from Denselight products into this is fine.

We expect they will provide some rough guidance on Denselight revenue growth.

Its been intimated that the VCSEL bottleneck is primarily logistical in nature.

To me, these 2 facts plus the additional cash in the bank should allow them to provide this guidance.

I'm hoping this is the case.. both for the sake of my nerves and my liver.

I'm still very optimistic, despite the recent plunge.

Best of luck to all of us.

Join the conversation about POET Technologies Inc.

Reply