Issued on behalf of Power Metallic Mines. Disclosure
UBS Sees Copper Supply Tightening Into 2027 as Power Metallic Mines Advances Copper-Rich Lion Deposit

Investing.com reported on November 22, 2026 that UBS analysts kept a bullish copper outlook in a November 20 report, even after the metal pulled back toward US$12,000 per metric ton on worries about Chinese demand and artificial intelligence investment. With copper at US$12,251 per ton on November 20, UBS forecasts US$14,500 by March 2027 and US$15,500 for the June, September and December 2027 quarters.
Industry Bulletin Issued on behalf of Power Metallic Mines Inc.
The bank's view rests on supply. UBS projects global copper deficits of 219,000 metric tons in 2026, widening to 379,000 tons in 2027, citing weaker output in Chile, reduced guidance at Antofagasta, a narrowed outlook at First Quantum and lower annual production at BHP, only partly offset by stronger output at Teck. Shanghai inventories sit near multiyear lows and the Yangshan premium reached a record US$500 per ton in November. Demand signals are softer: Chinese fixed-asset investment fell 8.1% in January to October, and rising London Metal Exchange stocks and AI spending uncertainty have added pressure. UBS identified support levels at US$11,650 and US$10,900 per ton.
Copper is widely used in electrical wiring, power grids, transformers and data-centre electrical infrastructure, which is why supply forecasts like this provide context for copper-focused developers. Power Metallic is a Canadian exploration company advancing the Nisk Project Area in the Eeyou Istchee James Bay territory of Québec, which it describes as a high-grade copper-PGE, nickel, gold and silver system. The company controls about 330 km² following its June 2025 claim purchase.
Power Metallic reported that hole PML-26-125 intersected 5.70 metres at 14.00% CuEqRec at nearly 800 metres vertical depth, more than 25% deeper than the deepest hole used in its September 8, 2026 Mineral Resource Estimate, with further assays expected. BBA is leading a Preliminary Economic Assessment based on that estimate, targeted for completion in the first half of 2027 and funded from existing cash. An initial development configuration has not yet been selected.
To follow Power Metallic's Lion deep drilling, its PEA progress and how the copper market backdrop relates to its Québec project, visit the Power Metallic Mines (TSXV: PNPN, OTCBB: PNPNF) investor hub on AGORACOM. https://agoracom.com/ir/PowerMetallic
Disclaimer
Power Metallic Mines Inc. Is A Client Of AGORA Internet Relations Corp. https://agoracom.com/ir/Agoracomupdates/forums/discussion/topics/796135-DISCLAIMER-AND-DISCLOSURE/messages/2399000
This bulletin provides general information and does not constitute investment advice or a recommendation to buy, sell or hold any security. Industry developments discussed may not result in a commercial or financial benefit to the company. Readers should review the original sources and the company's public filings and conduct their own due diligence.
This bulletin contains forward looking statements concerning UBS copper price forecasts and projected 2026 and 2027 copper deficits; Power Metallic's PEA targeted for H1 2027 and expected further assay results. These statements involve risks and uncertainties, and actual results may differ materially. Refer to the company's public filings for relevant risk factors.
Join the conversation about Power Metallic Mines.
Reply