WOW
- Got to Love this. Last line especially. Good Luck To Everyone, Chum
- 7.92 grams per tonne gold across 114.5 metres (0.23 ounce per ton across 375.6 feet) including 23.56 g/t Au across 31.0 m (0.69 ounce per ton across 101.7 feet) in hole MM179C, conducting initial resource confirmation drilling in the F-zone;
- 18.49 g/t Au across 20.5 m (0.54 ounce per ton across 67.2 feet) in hole MM170 in step-out drilling located approximately 500 metres west of the limits of previous exploration;
- Recent exploration drilling has intersected strong mineralization in new areas on the property -- assays are expected in the near future.
Join the conversation about Premier Goldmines.
Reply