1. HARDROCK PROJECT: 43-101 soon; 8 rigs drilling
2. HARDROCK/BROOKBANK: Preliminary Economic Analysis “PEA” early Q4
3. COVE: drill results - November4.
4. RED LAKE: Goldcorp - 51%/Premier Gold -49%, Joint Venture
-
At 5400’ below surface, 2 drills continue working from the tram /haulage drift underground drill stations.
-
Drill hole D36770 in progress will test the projected down-plunge extension zone of the Wilmar Mine.
-
The Wilmar mine is east of the Cochenour Mine (production expected in 2014) and the Bruce Channel deposit.
5. GOLD: Recent ownership change indicates a cyclical bottom for gold.