High-Grade Gold Projects

Red Lake and Geraldton are Canada's PREMIER addresses for gold

Free
Message: "PG' - Potential Major Catalysts-Near Term

1. HARDROCK PROJECT: 43-101 soon; 8 rigs drilling

2. HARDROCK/BROOKBANK: Preliminary Economic Analysis “PEA” early Q4

3. COVE: drill results - November4.

4. RED LAKE: Goldcorp - 51%/Premier Gold -49%, Joint Venture

  • At 5400’ below surface, 2 drills continue working from the tram /haulage drift underground drill stations.
  • Drill hole D36770 in progress will test the projected down-plunge extension zone of the Wilmar Mine.
  • The Wilmar mine is east of the Cochenour Mine (production expected in 2014) and the Bruce Channel deposit.

5. GOLD: Recent ownership change indicates a cyclical bottom for gold.

Share
New Message
Please login to post a reply