Skip to content
Sign in

Post

Premium Exploration

Treasurer3.9 rating from 22 members723 ptsRate

Check Page 26 For 2004 BTP Buffalo Gulch Numbers

Did people really expect the first holes to produce skyrocket numbers when previous drilling was in the .5 - 1.25 range for Buffalo Gulch drilling? Due to weather conditions, was Pem able to locate that needle in the haystack location on their first try or were they just attempting to prove there was actually gold in the area shown by previous geophysics including IP dipole work?

http://sedar.com/GetFile.do?lang=EN&docClass=13&issuerNo=00005295&fileName=/csfsprod/data49/filings/00689983/00000001/C%3A%5Csedarpdf%5Cbtptr915.pdf

MRDI concluded that the project would be economically viable at a gold price of US$400 per ounce.

Join the conversation about Premium Exploration.

Reply

Replies

  1. I agree with Joey and others. 100% hits so far in all holes drilled is virtually unheard of. Not a single dry hole so far. Yet, we should expect some dry holes eventually as we reach the outer limits of length and depth, which we have yet to find. The location of the first 2 BG drill holes was not a first choice for position. Weather and road conditions limited these first drill locations. Yet, they still hit pay dirt. Major institutions, interested parties and shareholders et. al., are seeing that these two BG drill gold bearing assays are the first of many yet to come, and that these two assays at the BG are the initial potential indication that the OSZ has gold bearing structure-deposits of varrying grades and locations from end to end. It has been said, by one in the know, that these first 2 drill results likely lead to the confirmation of a gold seam running from north to south. The various and numerous elongated, as well as the multiple criss-crossing, potential structures identified so far is significant. We are in our infnacy with all that remains to be drilled.