Skip to content
Sign in

Post

Prodigy Gold

The post this replies to is no longer available.

Treasurer3.4 rating from 20 members469 ptsRate

Re: SF Show Updateh_rattle

I was going to say as much regarding hole spacing. But none of the categories were mentioned at the presentation. Still, if I were trying to maintain an arms length position vis-a-vis the preparers of the Resource Estimate as the COO I'd be reticent to say "what I expect is". Yes, he could say, "we drilled holes with spacing X because we need to provide sufficient granularity for such and such a category of resource." But he didn't and noone asked.

Join the conversation about Prodigy Gold.

Reply