Skip to content
Sign in

Post

Prodigy Gold

Treasurer4.0 rating from 11 members716 ptsRate

Had a chat with Brian

As of January 21 crews will be setting up at Beardmore- Geraldton gold camp and will be starting to drill soon after. One of the targets is the golden pond with work already being done to make sure the ice is thick enough for the drill rigs. We will be starting with two drill rigs and a third one if nessasay. The winter program will run from around January 22 to April. For the summer program it will start in the beginning of June with two to three drill rigs and a total of around 35,000 to 45,000 meters.

As for West Millennium uranium project they will also set up end of January and begin drilling soon after. One drill rig will be working this project with a total around 6000 meters of drilling and the project should last until around march.

Brian is big on the Beardmore- Geraldton area with the possibility of even more land purchases. He understands that share holder have been waiting for a long time and he hopes to deliver for them soon. He was very pleased with the financing because of the overall support and no warrants.

With the 43-101 a company is working on it as we speak .Brian mentioned the name (and i forgot) but he did say it was the best in the business and was looking forward to hear their recommendations.

Brian is not playing around in 2010 with a total budget set for around 17 MILLION DOLLARS. Get ready good things are just around the corner with result starting to come back by middle of February and the 43-101 not far behind.

The Vancouver show is January 17-18 and Brian said he will put the presentation on the web site.

Vancouver Resource Investment Conference
Kodiak Exploration Limited
January 17 - 18, 2010
Booth
# F511
Corporate Presentation
Sunday 17th January, 11:30 am in Workshop 1
Insiders Presentation
Monday 18th January, 1:00 - 2:00 pm in Cortes Island Fairmont Hotel Vancouver

900 West Georgia Street
Vancouver, BC V6C 2W6

Join the conversation about Prodigy Gold.

Reply

Replies

  1. Well It is Friday and another trading and speculating day..

    We better pray for cold weather to thicken that ice for the drill rig...

    One of the targets is the golden pond with work already being done to make sure the ice is thick enough for the drill rigs.

    Once it is thick enough to support some light plow equipment they will plough the ice clean where they want to drill and get down to straight ice.,,,.No snow..snow is an insulator and will weaken the ice..then the crew bores a hole in the ice and inserts a decent pump and starts to flood the cleaned out area to build a support pad..something like a pitchers mound..this thickens the ice from the top down and gives the drill the support it requires..It is not the weight of the drill itself that will sink it..it is the vibration..

    A semi trailer tractor left idling on an ice road that will support 200 ton loads will break trough the ice in a few hours if left idling in one spot..

    Hope to drill on the ice..but it can be drilled from shore on an angle but better straight down..shorter distance.

    Anyway ..almost market time..Good luck to all you KXL groupies..

    Portee


    1. Cold, your prayer has been heard.

      Snow, no problem, why do you think Canadians are world Curling champs; they now how to clear snow.

      What is a winter with no snow, pretty boring, cold, frozen pipes, although it kills bugs, ticks, plus some other nasty stuff, such as those things killing the forest out west.