Skip to content
Sign in

Post

Prodigy Gold

Prez3.6 rating from 115 members4.2K ptsRate

Production in 2014

Here is a release by Prodigy re: a 3D Drill Tour of Magino. The last sentence of the report makes the statement that the mine will be fast tracked to production as early as 2014.

Just to add some potential optimism to the mix.

Today we went live with the Magino Mine 3D Drill Tour. We've posted it on our front page:

www.resourceintelligence.net

Join the conversation about Prodigy Gold.

Reply

Replies