$500 per ounce?

For the mining guys out there...

Does $500 per ounce in production costs for an open pit mine sound OK?

I know it is impossible to compare Goldcorp's Cambell mine to this deposit, but their production cost is less than $300 per ounce.

Lots of variables such as deposit size/concentration/economy of scale, etc.

KG

Join the conversation about Prodigy Gold.

Reply

Replies

    1. explorationguy, good post - Hammond Reef is one of Brian Maher's favourites. You wrote:

      "They are targeting cash cost < $500 an ounce, which will factor into the grade cut-off. An open pit example referred to on the Kodiak website was Brett Resources Hammond Reef open pit project( which was bought out). They have a PEA which reports an operating cost of $ 452/oz and a grade cut-off of 0.3 g/t. http://www.brettresources.com/i/pdf/2009-12-10_HR_NI43-101.pdf "

      I don't see any reason why they wouldn't use 0.3g/t cutoff, or even less. With the price of gold rising, many companies are using lower cutoffs. With that said, all the drill holes not previously counted/assayed and new infill drilling, I think it's within the realm of the possible that they'll show 3.25 million oz Indicated and Inferred, with perhaps a tiny amount of Measured.

      That said, it will take a PEA to see if it's viable.

      1. I've been using a conservative cut-off of 1 g/t for my estimates but it will be very interesting to see what PDG ends up using. If you check the 2004 resource estimate you can see about 1.25 million M&I oz with a 0.34 cut-off. My recent searches indicate you can use M&I&I for a scoping study(PEA) but feasibility studies can only use reserves(P&P) or measured and indicated. Inferred resources can't be used. I think most of the 20,000 m program will be for resource upgrading as opposed to adding resource. That will benefit the feasibility study. I'm reluctant to give a number for the revised estimate as I've been disappointed too many times with this stock. Good price and volume action. Let's hope it builds until the report is released.

        1. Good stuff exguy. Also correct - a PEA can use Measured, Indicated and Inferred, whereas a Feasibility Study (or even Pre Feasibility Study) can only use Proven and Probable.

          The number of ounces always tends to drop with that transition, as a good bit of the Inferred get thrown out. The strategy generally is to do a lot of infill drilling between the two to get the number back up.

          The 3.25 million oz is just a "possible" figure I gave at 30% probability - my 70% says 2.x million oz. But there are multiple reasons for the resource estimate to go up, as you outlined.

          Remember the classic mining chart showing the stages of a mining company - when you get to Feasibility and mine planning, often the stock drops precipitously, as then you need a buyer or very deep pockets.

          http://i.imgur.com/PDSDS.jpg

    2. My question will generate some discussion ,I'm sure..

      FRom what point does Brian use his $500.00/Ounce as gospel pricing..??

      After all the zillions of $$$$$$$$$$$$ required in development costs to start shovelling the ore into the mill...??? or before ..???

      And what about share dilution to start spending this $500.00 /ounce to recover this gold..??

      Or does that $$$$$$$$$ not count..???or is he figuring in those costs and all the overhead involved as a mining company..??

      Until we know what Brian is using as a benchmark to arrive at his $500,.00/ounce..all our speculation is useless..Let us get back to some useful discussion of converting our existing motel/hotel to a profitable whorehouse/gambling den..

      Portee

      1. The $500.00/ounce pricing refers to what it would cost to produce an ounce of gold AFTER everything is up and running. That would be the cost of labour, power, administration, etc.

        The feasibility study will determine what the cost will be to build all the infrastructure to get to the point of production, and how many months of production it will take to make up those costs. Based on that, it will determine a rate of return on capital. Based on that, it will determine if the whole thing is worthwhile.

        Before that happens, we will need to issue more shares. Hopefully, our stock price will continue its upward trend, before that happens, to minimize dilution.

        After the feasibility study, the money to build the infrastructure will come from credit extended to the company in the form of loans.

        1. Good points gents. Indeed the two cost numbers per ounce of gold are separable Here is a good website that expresses the Net Present Value idea behind it:

          http://www.avoidglasses.com/rau-chart-and-analysis/valuing-a-mining-company-using-net-present-value/

          So there are:

          a) a certain capital cost per ounce, to get the mine going and dug down to the first real paying ore, and

          b) a production cost per ounce, $500 in the case of PDG as given to us, although truly that number is an output of a PEA / FS and not known exactly yet, and

          c) on top of capital cost per ounce, and production cost per ounce, there is the discount rate (a dollar 5 years from now isn't worth the same as a dollar today), a risk rate, royalties permits and ongoing fees including cost of capital, and taxes.

          So the PEA will delinate whether all those costs, per ounce, remain lower than the cost of an ounce of gold.

          The capital cost you can base on your ounces. So e.g. if your total capital cost is just over $400 million, then the capital cost per ounce is about $150/ounce, on e.g. 2.75 m ounces.

          At $1450 gold, an indication of profit is probably a slam dunk, but PEAs never use today's spot price, because it changes so much. More likely a price of e.g. $900/oz gold, at the very most.

          After that, you have to figure the rate of return, how long it takes to get a return, and years of mine life. Let's say you put in $400m to build a mine, and net profits earn you $600m back. That's a 50% gain, but over what time period, and could you do better with another investment.

          There are of course other factors such as overall risk - e.g. financial or permitting for a heap leach, and whether you could leverage to the upside other company resources with further exploration.

          I am pulling all of those figures somewhat out of the air - real figures will be in the PEA and PFS / FS.

          The same site I quoted, going one level up, has a nice description of the alternate calculation, Enterprise Value per ounce. In the case of PDG at 35 cents/share, if we guess 2.75 million ounces, and just less than $10m cash, EVO is about $20-$25/ounce, which is right at the benchmark "advanced exploration" stage typical-price-mark of $25/oz, whereas a small producer is often valued at $225/oz, but after a LOT more dilution or the equivalent to get the capital to get the mine going. So on the face of that, PDG might be just fairly valued.

          Of course, all that should be adjusted for: mining in Canada as a positive, vs. difficult heap leach permit, a positive on infrastructure, a ? positive on other properties, maybe a negative on the deep steep hole to be made, possibly a neutral on the average grade, a positive on the new VP Exploration (a good guy), a positive on news and momentum, etc. etc. to your heart's content.

          By the way, here's that mine life graph inline. We are in the long valley of 4,5,6:

      2. I'm not sure what question you're asking. The PEA is a first pass economic analysis. It will review a range of mill sizes, production rates, capital costs ,operating costs, grade cut-offs and cash flow projections to determine an optimum balance based on the experience of the company doing the PEA. All it really does is determine if the project has a reasonable chance of making money using reasonable assumptions. Operating costs above $ 500/oz would be considered too high so that's probably why Brian threw that number out there. Furthermore you can't take the results of the PEA to the bank for financing, you need a feasibility study for that. There will be a need to raise money to get through the rest of this year and pay for the feasibility study but it had better be at a much higher share price than $ 0.345 .

  1. $500 sounds ok, but much more info is needed. Are they already operating, or do they need to develop the mine. Then you need to know about capital costs, enviro and permits, and how long it may take to start the operations. Good luck

    Tau