Skip to content
Sign in

Post

Puma Exploration

Prez3.8 rating from 91 members13.3K ptsRate

...News

Puma drills 68 m of 1.02% Cu at Turgeon

2010-11-24 07:49 MT - News Release

Mr. Marcel Robillard reports

PUMA INTERSECTS 68.0 METRES OF 1.02% COPPER AT TURGEON

Puma Exploration Inc. has released the results from the first hole drilled in 2010, at the Turgeon copper project in New Brunswick. The hole T10-01 intersected three mineralized copper zones from which the first two grade more than 1 per cent copper over 68.0 metres and 20.3 metres respectively. The third zone is characterized by disseminated copper mineralization grading 0.24 per cent Cu over 23.6 metres.

                MAIN MINERALIZED ZONES INTERSECTED IN HOLE T10-01


                                       Length
Zone          From (m)      To (m)     (m)(i)     Cu (%)    Zn (%)  Ag (g/t)

A                29.0        97.0        68.0      1.02      0.14       0.8
Incl.            38.0        64.0        26.0      2.44      0.07       1.3
                152.8       155.4         2.6      0.81      2.64      41.4
B               161.8       182.0        20.3      1.04      2.43       8.9
Incl.           161.8       163.9         2.2      1.15      8.72      31.1
and             168.6       174.0         5.4      2.30      4.92      10.2
                201.2       204.7         3.5      1.58      0.19       1.6
C               223.6       247.2        23.6      0.24      0.05       0.4
                303.8       307.5         3.7      1.00      0.09       1.8
                486.9       488.7         1.8      0.03      0.61      49.0

Zone A (29 to 97 metres)

The zone corresponds to the power line showing which outcropping at surface. The mineralization comes in form of thick chalcopyrite stockwork. The core of the mineralized zone is characterized by a significant copper enrichment grading 2.44 per cent Cu over 26 metres.

Zone B (161 to 182 m)

The zone corresponds to the 100-metre zinc zone defined by Esso Minerals exploration works. It is consisted of several massives sulphide intervals varying from two to five metres spaced out by disseminated copper mineralization. Including the copper mineralization of more than 1 per cent Cu over 20.3 metres, this zone contains a zinc enrichment grading 2.4 per cent Zn over 20.3 metres, as well as precious metals enrichment.

Zone C (223 to 247 metres)

This zone corresponds to the 48 to 49 zone defined by Esso Minerals. The previous holes E82-48 and E82-49 by Esso had intersected this zone at about 75 metres east of hole T10-01 with 2.1 per cent Cu over 24.2 metres and 2.1 per cent Cu over 19.1 metres. In hole T10-01, the mineralization comes in form of disseminated copper grading 0.24 per cent Cu over 23.6 metres. The interpretation of the borehole geophysical survey done in hole T10-01 should allow to specify relation between the zone cut and the ones in the previous drilling.

Precious metals

Besides intercepting copper and zinc mineralization, hole T10 confirms silver enrichment of some massives sulphide veins. Silver intersections grading more than one ounce, such as 41.4 g/t Ag over 2.6 metres and 31.1 g/t Ag over 2.2 metres have been cut for the first time in drilling. It is to note that the majority of the previous holes were not analyzed for precious metals.

The hole reached the depth planned of 594 metres, and at 303.8 metres, the hole cut a mineralized fault zone grading 1 per cent Cu over 3.7 metres. Further to this fault zone, the hole got into an important sequence of mafic dikes crosscutting almost entirely the host rock of the mineralization.

In the light of the results of hole T10-01, the drilling program will resume immediately after the final interpretation of the geophysical survey. Exploration works should start at the beginning of December, 2010.

About Turgeon

Join the conversation about Puma Exploration.

Reply

Replies

  1. Mr. Marcel Robillard reports

    PUMA EXPLORATION INC.: NEW TARGETS TO BE DRILLED AT TURGEON COPPER PROJECT

    Puma Exploration Inc. has provided an update on the current exploration program undertaken on the company's Turgeon copper property. Following the drilling of hole F10-01, Puma conducted surface and borehole geophysical surveys to better characterize the geophysical signature of the copper and zinc lenses and to define first priority targets to be drilled in December, 2010.

    Borehole InfiniTEM survey

    Three holes were surveyed during the geophysical InfiniTEM survey for a total of 1,261 metres. The first priority targets selected consist of off-hole anomalies located near mineralized intercepts. For example, the survey conducted in hole F00-01 indicates that at a depth of 190 metres the drill hole intercepted only the edge of a good conductor located 10-20 metres away and extending down-dip. The assay result at that depth was of 3% Cu over 9.5 metres within a zone of 2.3% Cu over 19.3 metres.

    Significant mineralization in the holes surveyed
    
    
    ----------------------------------------------------------------------
    Hole        From (m)    To (m)Length (m)    Cu (%)    Zn (%)   Anomaly
    ----------------------------------------------------------------------
    ----------------------------------------------------------------------
    F00-01         126.0     127.5       1.5       6.6      0.05  Off-hole
                   162.7     166.0       3.3       1.3      0.02      Edge
                   175.0     212.5      37.5       1.4      0.70
    Incl.          181.7     201.0      19.3       2.3      0.40
    Incl.          191.5     201.0       9.5       3.0      0.70      Edge
    ----------------------------------------------------------------------
    F09-01          37.3     109.0      71.7       1.3      0.05
    Incl.           46.3      76.3      30.0       1.9      0.04   In-hole
    and             85.0     103.0      18.0       1.8      0.08
    Incl.           92.3     103.0      10.7       2.4      0.08   In-hole
    ----------------------------------------------------------------------
    F10-01          29.0      97.0      68.0       1.0      0.14
    Incl.           38.0      64.0      26.0       2.4      0.07
                   161.8     182.0      20.3       1.0      2.43   In-hole
    Incl.          161.8     163.9       2.2       1.2      8.72
    and            168.6     174.0       5.4       2.3      4.92  Off-hole
                   223.6     247.2      23.6       0.2      0.05  Off-hole
                   486.9     488.7       1.8       0.0      0.61   In-hole
    ----------------------------------------------------------------------
    
    

    Surface InfiniTEM survey

    Other drill targets were defined by the surface geophysical survey (6.7 km-line) and are located within 100 metres from surface. From the seven surface anomalies defined, the first one to be drilled is in strike with known copper mineralization along a favourable fault contact that is extending for more than 600 metres. This geophysical anomaly, extending for more than 100 metres, has never been tested and is open down dip.

    The drilling program to resume

    In the light of the survey conducted, Puma will resume the drilling program on the Turgeon Copper Project shortly. The field crew is on site to prepare the drilling sites and the drill rig will be mobilized immediately after. The objective is to test the priority targets and complete a first phase of 1,000 metres of drilling. In the same time, more line cutting is underway at Turgeon to extent the area covered by geophysical surveys.

    "We are very excited to resume drilling at Turgeon especially were previous hole have hit meaningful results on the edges of anomalies and that you are eagerly anticipating drilling into the source of the anomaly." State Marcel Robillard, President of the Company.

    Continuing program on Nicholas-Denys Silver Property

    The primary goals for the current exploration program on the Nicholas-Denys Silver property are to further delineate mineralized zones discovered in the previous drilling programs at the Hache and Shaft lenses and to conduct an extensive geophysical survey to define -priority targets to be drilled along the 2.3 km strike length of the favourable structure between the Hache and Henry lenses. The 20 km-line InfiniTEM field survey is completed and the final interpretation should be available shortly.

    Following the final interpretation of the geophysical survey more field work including prospecting, trenching and drilling will be undertaken at the beginning of 2011 to test the priority targets identified by the current work.

    The contents of this release were prepared by Marcel Robillard. a Qualified Person as defined in NI 43-101. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release