Skip to content
Sign in

Post

Puma Exploration

The post this replies to is no longer available.

Prez3.8 rating from 91 members13.3K ptsRate

Re: ...PDAC.. nicely done..

a few others standing around watching a video on a gravel open pit on site exposing a lense. We could see roughly 6 feet of top earth. Actutally one owned a excavation business so we had a good discussion on open pitting. Roughly 1 1/2 x 1 1/2 x 1 1/2 cu ft = one ton of ore a 2.9 capacity. A 150,000,000 oz was throwen out there because of the high tonnage of ore over 16 lenses and 3 structure showing continuity. This is only down to a 250 meter depth . Whats below here requires drilling. Thoughts here are that Puma would like to size up the necklace first and likly sell to large producer. PS ; the bonuss here for investers , Xtrata owns the smelter and is hugry for copper ,zinc, The # 12 mine is running out of ore, Puma in my opinion well be taken out by a major if infact Puma has a major Volcanic massive sulfide pour..Traps7

Join the conversation about Puma Exploration.

Reply