Skip to content
Sign in

Post

PyroGenesis Inc.

Mail Room2.5 rating from 6 members123 ptsRate

Drosrite construction

Mr Pascali 


Could you please tell me how long it would take pyrogenesis to build  10 Drosrite furnaces,  5 of each available size.  I believe there are only two sizes, going by what was ordered  by  Ma'aden through Radian. 


Thank you

Sign in to ask the company to answer this.

Join the conversation about PyroGenesis Inc.

Reply

Replies

  1. Dear Torchfan,


    Interesting question and thanks for posting it.


    Short answer: 6 months.

    50 Systems? 6 months.

    100 systems? Again 6 months.


    We are not constrained by our manufacturing footprint as we have the parts constructed/produced outside of Canada.  In fact, I cannot remember the last time we built a Drosrite system in Montreal.

    Now here is where it gets interesting.  If we order the long lead items in advance, or have suppliers stock them in order to get our business, we could get this down to something like 3-4 months.

     

    This logic extends across Pyro’s other business offerings as well.

     

    Hope that Helps,

     

    PPP