Dear Mr Pascali 


I watched a couple videos of steel making, and it seems like a lot of these companies have been in business  for many years, 60 to 80 years or more. 


They very seldom shut down unless it's for a scheduled maintenance,  or a problem.


This seems like it would be difficult for them to even test plasma torches, because of the need to shut down operations  to  install a plasma torche and remove a fossil fuel burner. 


Do these companies both steel and cement,  seem more interested in using plasma torches in new facilities they are planning to build or more interested in converting  the fossil fuel burners they are currently using?  I'm sure a new facility would be a lot easier to accommodate a plasma torche.



Thank you


Sign in to ask the company to answer this.

Join the conversation about PyroGenesis Inc.

Reply

Replies

  1. Not answering for Pete.. I am just going on what I believe I recall with what has been disseminated long ago. These devices are plug and play so-to-speak. They need not shut down the entire plant.


    They do need to also pull the plasma torches after so many hours of operation to replace the electrodes. I recall that the time schedule was surprisingly short/frequent.


    I'd be curious to know if headway has been made in the development on more robust electrodes, lengthening those change out timeframes. That too me would be advantageous for a company to adopt this technology.


    Found the timefram.


    If you look on page 3 and 5, it indicates 1000 hours. Assuming these iron ore plants run 24 X 7, that is 1000 divided by 168 hours a week. That has you changing the electeodes every 6 weeks. That is a crazy maintenance schedule.


    https://www.pyrogenesis.com/wp-content/uploads/2019/09/4.-2012-09-Plasma-Torches-COM-2012-Paper.pdf

    1. I remember the plug and play comments from years back, just not sure it's quite as simple as it sounds.


      As I  mentioned a lot of these companies are very old, and I know some are actually building new plants, so naturally I thought if they were going to convert to plasma torches  it might be easier to design the new plant with that in mind.


      If it truly is a plug and play then I suppose new or old plant doesn't  matter, unless   uses for plasma torches are developed for the other areas in processing. 


      Thanks for your insight. 

      1. i think the plug and play is only if they were to replace just the oil burners with plasma,but it seems that the clients want to maximize the benefits to plasma ,by adapting a gas,hydrogen,as a heat transfer medium,and also replacing coke in the pellets to bring co2 emmisions to near zero while also reducing nitric oxides.
         IOC has one pellet plant ready to be rebuilt,I would not be overly suprised if they rebuild it using plasma torches and hydrogen.

    2. 1000 hrs for the electrode and 600 for the anode,is probaby the longest lasting electrodes in the business,pyr list it as an advantage,


    3. Please note that paper authors indicate the 1000 hours duration as a very long (favorable) time. 

      1. Please note, I still believe that is a fairly frequent maintenance schedule. It doesn't mean it isn't favorable. There is no need to transport and store bunker fuel. As long as the electricity flows, all is well.