A big thanks to @ToolmanTim for this informative post:

@ToolmanTimSaturday Morning Coffee just getting inside the fence was never the destination

This TMS week I’ve been thinking a bit about something Peter’s said often… that Drosrite was a way to get “inside the fence.” The first time I heard it in a George interview years ago I took it pretty literally. Get a system into a plant, build some trust, maybe that opens a few doors there. And to be fair, that part seems to have played out. But reading through the TMS paper that just came out with Juan Salazar and Rio and Alcoa… it feels like just inside the fence was never ever the real destination. More like the first step in something that’s been unfolding slowly. I recall too that Peter talked about the time it takes to build trust with these conservative people who think in terms of decades… but also during that trust building time some different conversations might take place with PYR about “what other problems PYR might be able to help them solve with our offerings”. Can you hear him? I can.

Because what’s being described now isn’t just inside the fence of the plant anymore. It’s inside the furnace! They didn’t just model this or simulate it… they built a pilot furnace, ran it as both a melting and a holding furnace, and then replaced natural gas burners with a plasma torch and measured everything that happened. Energy use, cycle time, dross formation, metal quality… the things that really matter to these people. The results, at least in this controlled and adjustable setup, are pretty amazing. Energy consumption down on the order of
~35%. Cycle times shortened meaningfully. Dross and NOx reduced once they stopped air from getting into the furnace. Even the hydrogen levels in the metal dropped, which I’d say points to actual quality improvements. Once again PYR plasma is not just “close to” or “as good as”… but substantially “better than” legacy processes. Gangbusters!

What I found just as interesting as the end results was what it took to get them. As much as we’d like it to be… this wasn’t really plug-and-play. They had to deal with air infiltration, manage furnace pressure, introduce nitrogen to stabilize conditions, and work through NOx spikes when doors were opened…. and there are still issues… noise is a little high, emissions control, even some metallurgical questions around nitrides in certain alloys. So to be realistic… this doesn’t seem like a finished solution... yet, but it’s also clearly not theoretical anymore either. This is PYR, Rio, and Alcoa engineers and operators methodically working through what it actually means to run plasma inside a real aluminum furnace environment.

So, if I'll take my usual step back here… I can see the progression starts to make more sense. It begins with something like Drosrite that is pretty contained, low-risk, solving a specific end of the line waste problem. It gets you both credibility and opportunities for other discussion… it gets you known in the industry. From there, the conversations likely shifted from bolt on systems to process discussions. From dross waste recovery to other heat supply areas. And now, with this work, PYR is not just present in the plant… they’re affecting how part of the plant actually runs. Throughput, energy, quality… that’s a way different level of involvement.

So that’s where this starts to connect to the bigger picture I think Peter has been circling… because just upstream from these cast house furnaces is where the really large thermal loads sit:

Calcination.

In simple terms, calcination is the last step in the Bayer process (from bauxite ore to alumina), where aluminum hydroxide is heated to roughly 950–1100 °C (a sweet spot temp for plasma) to produce dry alumina powder. It’s continuous, energy-intensive, and sits directly in the critical path of production. Unlike downstream furnaces, this is not “optional equipment”… if it stops, the whole refinery stops. Dominated by natural gas burners today it represents the biggest pollution problem for the aluminum industry and as such… the biggest holy grail opportunity for PYR. That’s the stage in the production process everyone jumps to because of the scale. But you don’t go from zero to that overnight. You move through stages. And this today… working inside melting and holding furnaces with two of the largest aluminum players feels like one of those stages. Not the final one, but not the early foot in the door one either.

So maybe Drosrite wasn’t just about getting inside a "specific" fence but was more broadly about getting into the aluminum industry as a whole… building enough credibility to be invited into more meaningful and likely difficult parts of the process. Because what this paper shows, at least to me, is that PYR isn’t just trying to get "access" anymore. They’re starting to meaningfully participate. And once you’re inside the furnace… once your technology is influencing how metal is actually produced… the most interesting question today is no longer whether plasma can find a place in aluminum… but how far into the process of making it can plasma actually go from here.


Transformlutionary

Sign in to ask the company to answer this.

Join the conversation about PyroGenesis Inc.

Reply