Whats the drill schedule like...

When could we expect news? Its a month of drilling if I have understood correctly...but apart from that, havent had alot of time to review the exact schedules we could be expecting...

Join the conversation about Questerre Energy Corporation.

Reply

Replies

  1. Burnhard83,

    Here's the last news from QEC and if you go ahead and read the posts on this forum you'll find out lots of info on QEC. The company is very good at putting news out and carefull at the same time.

    CALGARY, ALBERTA - Questerre Energy Corporation ("Questerre" or the "Company") (TSX: QEC) (OSLO: QEC) today announced interim results from the recompletion of it’s Gentilly shale gas well in the St. Lawrence Lowlands of Quebec. The well flowed more than 800,000 cubic feet per day on a sustained basis. This was from one set of stimulated perforations in the Utica shale only.

    The well, which is a re-entry to a previously drilled Trenton-Black River well, was tested in early August in the Utica formation. The well was subsequently tested for 18 days. At the shut-in point, the well was still cleaning up and pressures and flow rates were constant or slightly increasing. Approximately one-half of the fracture stimulation water has been recovered to date.

    Questerre CEO Michael Binnion commented, "This is an excellent result for a vertical frac, especially given that only one set of perforations was stimulated.” Mr. Binnion continued, “There is obviously a lot more work to do and it will take time for final results to come in; however, initial results continue to meet or exceed our expectations."

    Based on the promising results of the tests, the project’s joint venture partner Talisman Energy Inc. (“Talisman”) agreed to add another frac to the testing program. This second fracture stimulation is now underway. Following an evaluation of the results of the second fracture stimulation, two additional fracs of the Lorraine shale will be conducted. Results of these Lorraine tests are expected in the fourth quarter.

    The Lorraine shale sits on top of the Utica and can be up to 6,500 feet thick. The Utica shale ranges between 300 and 1,000 feet. Early indications show that both the Lorraine and Utica rocks are thick, porous and appear brittle and over pressured, all of which are conducive to artificial fracture stimulation.

    Questerre and Talisman are considering an increase in the capital allocated to completing, testing and evaluating the well. The joint venture partners are also considering the possibility of accelerating or increasing the pilot program.

    As the first company to acquire leases in this play, Questerre has secured a more than 830,000-acre (gross) position in the ‘sweet spot’ of the Utica Shale. Questerre also applies its shale gas expertise to shale gas properties in British Columbia.

    1. JQ,

      One thing I missed about this is that rates were increasing and only half the water from the frac had been recovered, so once they get a full clean up, we should expect even high rates.

      I can't wait for the results on the Lorraine.

      Rocco

      1. Rocco,

        Good point. There's a Horizontal Frac well in Alberta that's getting more than 13mmcf a day. The Lorraine should be interesting when we see results. Just based on depth alone we should get more gas because more depth = more pressure=more gas. Plus QEC's land is between the Yamaska Growth Fault and Logans Line so we have the BEST land in the play according to all the top geologists who have looked at this including ECA.

        JQ:)

  2. Burnhard83,

    Here's a post from Jason at QEC ( VP Finance/Investor Relations). This will give you an idea of time needed for the process. We should get some news dribbling out in the next 4 weeks and Q4 should be a good quarter on the news fron as well. Hope that helps.

    Hi

    On a vertical well, e.g. Gentilly #1, these are drilled to the top of the deepest formation, in this case into the Potsdam. They begin testing the deepest zone first and move their way uphole. Based on an analysis of the drilling logs and any cores taken, each zone is perforated, stimulated with a frac and then allowed to clean up before being put on test production for 3-4 weeks. They then set a removable plug and test the next zone. Eventually the entire well is placed on production from all the perforated shale intervals to determine productivity.

    For horizontal wells, these are drilled vertically and then ‘curved’ until the well path is horizontal or close to it in the target interval within the formation e.g. the most prospective interval in the Lorraine or the Utica. They set a plug in the cased horizontal section and perforate and frac a portion of the horizontal well (approx. 100-200 m). This is then repeated until the entire length is frac’d. The well is then allowed to clean-up and production tested.

    Jason

    JQ:)