Skip to content
Sign in

Post

Resverlogix Corp.

VEEP3.2 rating from 55 members13.4K ptsRate

Setting expectations....

Given that we now know that an SSRA may not in fact be done, I think it would be wise to refrain from talking about it like its something to be anticipated.  The company has done a poor job over the past several years of setting expectations and then not meeting them, be it with liscensing deals, LOIs, or simple attendance at investor shows.

Even the halfway point futility analysis...

At  least now we've gotten a clear indication from the company that an SSRA may not in fact be coming.  All we know is that "IF" one is done, then news will be released.  

It could very well be that the determination has already been made that an SSRA is not needed at this late stage.

Join the conversation about Resverlogix Corp.

Reply

Replies

  1. Given that all of the company's recent news releases that mention the SSRA (most recent March 2018), the most recent MD&A posted to SEDAR in March 2018, the most recent analyst report in April 2018 (Zacks), and the original BETonMACE trial design all stated that SSRA is planned at 75% of events (188 events), then until the company officially states otherwise I will assume that the SSRA is still coming. The significance of the SSRA is big and in my opinion the results have the potential (if positive) to be the biggest catalyst before top-line data.

    BearDownAZ

    beardownaz

    Resverlogix Corp.

    The significance of the SSRA

    The significance of the sample size re-estimation analysis (SSRA) extends beyond its ability to confirm that BETonMACE is sufficiently powered and that current projections for required number of patients and target MACE events are unchanged. The SSRA also serves as an official...

    1. We can all assume whatever we like, I like many was assuming there would be a Futility Analysis at the halfway point:

      https://www.resverlogix.com/investors/news.html?article=565

      Its right there in that news release:  "The DSMB will conduct additional periodic reviews and will also perform a futility assessment once 125 adjudicated major adverse cardiac events (MACE) have been observed".

      And Zacks and others mentioned it as well:  

      You shared your email and I and Kelsee did as well....all of us were given the same answer.  That news on an SSRA "would" be released provided one is in fact done.  

      I hope one is done, but I'm not expecting it and I think on this board we should not set unreasonable expectations based on things that are only "Assumed". 

      1. We should know one way or another in the next five weeks if the plan has changed. The next MD&A should be out by end of July. The next periodic DSMB report if due any day now and the longest interval in between DSMB reports would put it at first week of July at the latest (thanks for that analysis Kelsee!). The language contained in the pending MD&A and DSMB report could be telling. I don't think the DSMB reports have ever mentioned it, but the MD&A did.

        BDAZ

        1. Speaking strictly for myself BDZ, based on Sarah's emails to you, me and Kelsee, I am no longer expecting an SSRA to be done.  If one does come out, its a bonus....I'll take it as the company under promising and over delivering, which would be a nice switch.  

          Volumes are tapering off, but I like the fact that a day with 100K....now I consider it low instead of high.  

    2. Since there is some significance to an SSRA/FA report there is another option that should be considered. If it becomes obvious to the CSC that the events and adjudication process will take the same or longer than potentially getting the Top Line Results then maybe they make a decision to do an FA at 125 events just so there is some news flow available to put out. If apabetalone is working in this trial as well as it did on those few patients that met this specific criteria in the ASSURE trial then it is at least possible that this BETonMACE trial could be over (250 3 point MACE events achieved) before the 188  adjudicated events for this SSRA are available to release. That may mean that we have a 58% or greater RRR. That thought could be considered wishful thinking or just plain speculation which I know this board is tough on. DM may have to use a little influence with the CSC in order to find a balance between the scientists need to focus on the science and shareholders need to be fed news from time to time.

      58% RRR, what a crazy thought!

      dyodd

      tada

      1. Tada, 

        Interesting hypothesis. However, I always thought that you don't count your chickens before they are hatched. In other words, one needs an adjudicated 3-point MACE event for it to count for the futility analysis (was 125 events), SSRA (188 events) or end of trial/top line (250 events). By that logic, one can't get to the end of trial 250 before getting to the SSRA 188.

        BearDownAZ 

        1. BDAZ - No argument here. There is no way to have an official Top Line Report out prior to the SSRA.

          It is possible though that the 250 events could be done, un-adjudicated, before that group gets the first 188 adjudicated with the apparent speed of their work.

          tada

           

  2. Koo,

    As per various company communications, there is an interim sample size re-estimation analysis (SSRA) at 75% of the planned 250 events, which would correspond to 188 events. This is the only SSRA that the company has indicated. So the idea of an arbitrary end of year analysis just because it is the end of year seems unlikely and unjustified. Besides SSRA at 188, no other interim analysis has been discussed other than the period DSMB safety reviews, which we have had six of so far. So there are a few possibilities (not an exhaustive list):

    1) SSRA happens at 188, top line at 250.

    2) SSRA is not done. Top line data at 250

    3) SSRA is re-scheduled for some point beyond 188 but before 250. Top line at 250.

    4) SSRA results in increased sample size and number of required events. Top line at ?

    BearDownAZ 

  3. Koo, 

    No one from Resverlogix has ever given a guarantee of end of BETonMACE by end of 2018. If you or someone else has an official company communication that provides a 2018 guarantee, then share the quote and source here and we can discuss it. But keep in mind that hopes, plans, expectations and other forward looking statements covered by safe harbor are not the same as a guarantee.

    BearDownAZ 

    1. Futility, SSRA, Top-Line data....it all comes from the same forward looking bucket that has LOIs and liscensing agreements.  

      After the B&B presentation I listed 3 things I wanted to see checked off:

      1) Finalization of the Third Eye Loan.  Done

      2) Cancelation of the proposed offering. Done

      3) Top Line data by EOY....lots of runway left.

  4. Koo, 

    I'm not really sure what you are asking. You are correct that the primary outcome measure is time to first occurrence of 3-point MACE. Once 250 total adjudicated 3-point MACE events have occurred, the trial will be complete (unless they change protocol). Only once this occurs will the final data analysis occur and top line data reported. There is nothing magical about year end. If 250 occurs by year end then we will likely get top line data by year end. If 250 occurs in 2019, then we will get top line data in 2019. If the SSRA occurs, that will happen at 188 events. Does this clarify for you?