Resverlogix Provides Update on BETonMACE Phase 3 Epigenetics Trial GlobeNewswire•June 12, 2019

Last Treatment Visits Completed; Follow-up Safety Visits Progressing CALGARY, Alberta, June 12, 2019 (GLOBE NEWSWIRE) -- Resverlogix Corp. (“Resverlogix” or the "Company" ) (RVX.TO) is pleased to announce today that all patients active in BETonMACE, the Company’s event-based, phase 3 registration trial, recently completed their last study visits on treatment. Final, follow-up safety visits are progressing and are expected to be completed by July 4th, 2019. Once safety visits have concluded for all patients, Resverlogix anticipates being in a position to provide an updated projected timeframe for top-line data readout. The remaining steps are amongst those required to assure an orderly, safe and efficient culmination of BETonMACE: Three to four weeks after the last study visit for each patient, a follow-up safety visit will take place either in-person or via phone call to ensure that any safety issues continue to be monitored In parallel, the third-party adjudication committee will continue to adjudicate remaining and ongoing potential MACE events Additional MACE (over 250) that accumulate during this period will be added to the results while not slowing down the trial’s move towards final database lock All patients who have discontinued the study will be contacted for an unscheduled follow-up visit or call to determine medical status Database Lock (DBL) will occur sometime after the last patient’s final visit and the last query is resolved Approximately two weeks after DBL, the primary endpoint and additional secondary and exploratory endpoints are expected to be announced Late-2019 and beyond – full outcomes, pre-specified endpoint data, safety results, and clinical implications are expected to be reported and published BETonMACE On April 18, 2019, BETonMACE successfully reached 250 projected major adverse cardiac events (MACE), strictly defined as cardiovascular death, non-fatal myocardial infarction and stroke, moving the potentially landmark trial towards completion. Successful data from this trial would enable Resverlogix to proceed towards the regulatory approval and commercialization of its lead drug, apabetalone – a leader in a new class of drugs outside of oncology designed to regulate disease-associated proteins. Dosing with apabetalone commenced in November 2015 and the trial exceeded full enrollment – with a total of 2,425 study participants – in March 2018. BETonMACE has been reviewed nine times by the trial’s independent Data and Safety Monitoring Board, with no safety issues identified, and has been recommended to continue without any study modifications. The primary endpoint of the BETonMACE trial is designed to show a relative risk reduction of narrowly defined MACE for patients who remain on a high-dose statin therapy and top standard of care. Despite maximized use, current statin therapies manage about 30% of cardiovascular disease related events leaving a significant market opportunity for apabetalone. Following a successful BETonMACE trial, the Company is focusing on three initial indications – acute coronary syndrome, vascular cognitive dementia and chronic kidney disease – with an addressable market of over 12 million patients in the top 8 markets. 

Join the conversation about Resverlogix Corp.

Reply

Replies

  1. Sumpup

    Where did you receive this update from? It does not look the same as the press release I received this morning from Resverlogix!

     

    One passage from Sumpups post"– full outcomes, pre-specified endpoint data, safety results, and clinical implications are expected to be reported and published BETonMACE On April 18, 2019, " would also appear to be an incorrect date and this does not show in the press release I received.

     

    Looking forward to what others received as far as press release and contents of the release.

     

    Thanks

    Alberta Clipper

    1. I just reviewed the Resverlogix press release on Global Newswire and it also does not match Sumpups post of the press release... specifically "– full outcomes, pre-specified endpoint data, safety results, and clinical implications are expected to be reported and published BETonMACE On April 18, 2019, "

       

      Thoughts?

      1.  Thanks JBUFFETT62 this is the same press release I received, but it does not match Sumpups post of his press release.

         

        His says "– full outcomes, pre-specified endpoint data, safety results, and clinical implications are expected to be reported and published BETonMACE On April 18, 2019"

         

        Ours does not contain this information, and the date is incorrect as it is in the past.... how can they report and publish a future paper in the past?

          1. Albertaclipper - I think you probably meant to thank Mazola. I was just going to repost the complete NR but see that Bear has so that should clear it up for you. Sumpup's was exactly as I received except it was all run together with headings included as part of sentences, etc. The portion you queried was actually three things, not one sentence. It was the end on a bullet point so no decimal, then a heading in capitals and then a new sentence. I think reading Bear's post will clear it all up. 

             

            1. Replying to @rvxoldtimer

              Old timer

              I had received the original press release directly from Resverlogix, which I read and understood. It was when Sumpup reposted that it became unclear for the reasons you and Mazola provided.

              Thanks guys!

            1. Replying to @sumpup

              sumpup, apologies, I meant in general and with no offence to you personally.  I was tempted to do it myself but then figured most people on the board likely get these NRs sent directly to their email and have probably seen it already anyways.  BDAZ does it formally as hub leader, which is a good thing.  

              1. Replying to @paladin

                Palapin, no worries, it was meant tongue in ckeek without any animosity. I agree with everything you stated. I just got a little excited that we actually had a PR 2 days in a row...or was it 2 out of 3 days...in any event I appreciate all the effort everyone puts into this forum so the likes of me can stay connected in my otherwise very busy life!  

  2. Not bad at all. 55 days to schedule and complete all patient last study visits. All dosing is now complete. 3-4 more weeks for completion of off-treatment safety follow ups with anticipated completion around July 4. The biggest unknown in my opinion is the time needed for the final cleanup of the database and addressing any unresolved queries. Database could lock immediately upon completion of safety follow ups. Only once this is done will the database lock. Top-line may be ready to announce about 2 weeks after database lock. Mid-July to mid-August sounds reasonable for top-line timeline. This is exactly within their projection in the April 18 news release. Congrats Resverlogix and BETonMACE clinical crew! Tick tock. Bookends are closing in.

    BearDownAZ

    1. Bear - I was going to ask what you have seen in the past for time to lock data base after safety follow-up completion. This is the area that has been left murky. From your post, I can see that is your question also. The times they have given are from fastest to July 17th to slowest to July 31st. This is of course with zero time to lock database after safety follow-ups. Adding some time for that gives maybe July 24th to August 7th. The time to lock the database is an unknown so if you have any past experience in this, it would be appreciated.  

      1. "Bear - I was going to ask what you have seen in the past for time to lock data base after safety follow-up completion. This is the area that has been left murky. From your post, I can see that is your question also.....The time to lock the database is an unknown so if you have any past experience in this, it would be appreciated."

        No I don't have much experience in this. I don't think database lock is a material event requiring disclosure, so there may not be much info out there on this. However, there is a recent example of Amarin's REDUCE-IT study that may be informative. Of course, the target number of events, number of patients, event rates and other trial design aspects are quite different between BETonMACE and REDUCE-IT. But it still provides a nice example timeline for the duration between milestones. BETonMACE had 2425 patients, 250 target events and a goal of ~3600 patient years accumulated over ~3.5 years. REDUCE-IT had about 8200 patients, ~1600 target 5-point MACE events (including ~1050 3-point MACE events), and ~35,000 patient years (not a typo) accumulated over about 6.5 years.Keep in mind that BETonMACE is a much smaller trial than REDUCE-IT and it is reasonable to expect the timelines to be shorter for BETonMACE.

        April 4, 2018: Amarin announced that REDUCE-IT is estimated to have reached the onset of the targeted 1,612 MACE events, anticipates that MACE from the study will be adjudicated through Q2 2018, and on track for reporting top-line results before the end of Q3 2018.

        June 28, 2018: Amarin announced that the last patient study visit had occurred and reiterated that it anticipates having top-line results before the end of Q3 2018.

        Sept 24, 2018: Amarin announced top-line results.

        The June 2018 Amarin news release had a great summary of the process copied below. Keep in mind that BETonMACE is a much smaller trial than REDUCE-IT and it is reasonable to expect the timelines to be shorter for BETonMACE.

        "The time between commencing last patient study visits and reporting top-line results in other large outcomes studies reviewed by the company has been approximately five to seven months. There is no reliable correlation between the length of time needed to wind down a study (i.e., the time interval between commencement of patient last site visits and reporting top-line results) and the outcome of reported results of a study.  Amarin’s anticipation of reporting top-line results before the end of Q3 2018 is consistent with the wind-down timing of these other outcomes studies, each of which were conducted by companies much larger than Amarin.......As previously described, other important steps needed to complete the study include finalizing adjudication of reported events, including major adverse cardiovascular events (MACE) within the primary endpoint, securing final vital status data from inactive patients, and completing the review of data for consistency and completeness across more than 35,000 patient years in the trial."

        RVXOT also wrote: "The times they have given are from fastest to July 17th to slowest to July 31st. This is of course with zero time to lock database after safety follow-ups. Adding some time for that gives maybe July 24th to August 7th."

        How are you arriving at those dates? If safety follow ups conclude July 4th and no additional database cleanup or queries, the database could lock July 4.

        BearDownAZ

           

        1. Bear does this indicate to you that all are coming out the same announcement date?

          "Approximately two weeks after DBL, the primary endpoint and additional secondary and exploratory endpoints are expected to be announced." (bolding added)

          And can I assume that top-line data readout (referred to in the first paragraph of the NR)  and primary endpoint to be the one and the same?

          Koo

           

          1. "Bear does this indicate to you that all are coming out the same announcement date?...And can I assume that top-line data readout (referred to in the first paragraph of the NR) and primary endpoint to be the one and the same?"

            There is only one primary endpoint: "Time to first occurrence of adjudication-confirmed narrowly defined MACE (single composite endpoint of CV death or non-fatal MI or stroke)." The top-line data announcement will be for the primary endpoint results for sure. It will likely also include some info on some of the results of secondary and exploratory endpoints. However, keep in mind that there are several secondary and exploratory endpoints. "....and additional secondary and exploratory endpoints are expected to be announced" is ambiguous enough to provide a lot of wiggle room for which secondary/exploratory endpoints are actually announced along with the top-line for the primary endpoint. They never stated that ALL secondary/exploratory endpoints would be announced along with the primary endpoint. 

            BearDownAZ

             

            beardownaz

            Reply in Resverlogix Corp.

            From what I've seen, top-line results may or may not include details such as secondary outcomes. We'll just have to wait and see what we get. For certain, BETonMACE top-line data will indicate whether the primary outcome was met with statistical significance. However, we may o...

        2. Bear - Thanks for the reply. The quote below is to possible Top Line data, not Databoase Lock. 

          "Adding some time for that gives maybe July 24th to August 7th."

          The NR stated that 3 -4 weeks after last study visit for each patient, a safety follow-up visit will take place. If the last study visit was just completed, 3 - 4 weeks from today would be July 3rd - 10th. Their July 4th estimate is the short end of that. Then we have the gray DBL period. Then it states that approximately 2 weeks after DBL, they should be able to release Top Line data. Two weeks added to 3rd - 10th is July 17th - 31st. Then add to that whatever time it takes to lock the database where I just added one week. I have no idea how long that will Lock will take.

           

          1. RVXOT wrote "Then it states that approximately 2 weeks after DBL, they should be able to release Top Line data. Two weeks added to 3rd - 10th is July 17th - 31st. Then add to that whatever time it takes to lock the database where I just added one week. I have no idea how long that will Lock will take."

            I think you are off by a week. If there are no additional queries at completion of safety follow up (expected July 3-10), the database lock (DBL) could happen immediately. Keep in mind the news release also states "Final, follow-up safety visits are progressing and are expected to be completed by July 4th, 2019." So the short end of that range is possible. If top-line is expected ~2 weeks after the DBL, and assuming no delay for DBL, then we are looking at top-line July 17-24 (you wrote July 17-31). But as you stated, there may be time required after completion of safety follow up visits before DBL that would push things out later.

            BearDownAZ

             

    1. I think by mid August.  Logically it should be late July, but the constant theme in BETOnMACE has been unexpected delays.

      1. Once they provide an update on or around July 4 we could start to see some positive SP action leading up to topline announcement. 

            1. Replying to @Cabel

              Cabel - Regardless of whether it is before Top Line release or immediatley afterward (little time), they need more cash to meet the August 4th Third Eye Loan date. We also have not heard of the possible 1 million units PP to be sold directly by RVX. Will this happen? 

          1. tada, so what date are you pegging the DBL to be, in reference to the following:

            "Approximately two weeks after DBL, the primary endpoint and additional secondary and exploratory endpoints are expected to be announced." (bolding added)

             