Welcome To The Salazar Resources HUB On AGORACOM

Edit this title from the Fast Facts Section

Free
Message: Salazar Intercepts 16 Meters of Massive Sulphides and Extends Mineralization 300

VANCOUVER, BRITISH COLUMBIA--(Marketwire - July 8, 2010) - Salazar Resources Ltd. (TSX VENTURE:SRL)(FRANKFURT:CCG) - Mr. Fredy Salazar, President and CEO, is pleased to announce drill results from the El Domo anomaly, Las Naves Central area, at the Curipamba Project, Ecuador.

Drill Highlights from Diamond Drill Hole (DDH) Curi-52: (See Figure 1: http://media3.marketwire.com/docs/1srl77.pdf)

- 21.5 metres of 1.87 g/t gold; 27.56 g/t silver; 1.66 % copper, and 0.83% zinc;

including:

- 7.5 metres of 3.52 g/t gold, 62.87 g/t silver, 1.31 % copper, and 1.61 % zinc

The Company has now completed three holes since recommencing its Phase 2 program. Each of the first four holes are 50m step-outs as seen in Figure 2: http://media3.marketwire.com/docs/2srl77.pdf. DDH Curi 53 is located 50m south of DDH Curi 52 and DDH Curi 54 is located 100m south of DDH Curi 52.

Drill hole 52 is located 50 metres east from drill hole 46. Total length of hole was 171m with a 90 degree strike and -60 degree dip.

Drilling continues at El Domo to test extension south of the deposit and additional exploration targets will be tested as part of the current 18,000 m drill program.

------------------------------------------------------------
From To Length Au Ag Cu Zn
(m) (m) (m)(i) g/t g/t % %
------------------------------------------------------------
44.4 65.93 21.5 1.87 27.56 1.66 0.83
------------------------------------------------------------
Including:
------------------------------------------------------------
44.4 51.87 7.5 3.52 62.87 1.31 1.61
------------------------------------------------------------
58.37 65.9 8.9 0.97 10.13 2.61 0.58
------------------------------------------------------------
(i)Note: widths reported are not true width

The drill program is continuing at Las Naves central and assay results for drill holes 53 and 54 are pending.

Mr. Fredy Salazar states, "The recent drill results at the El Domo anomaly validate our belief that El Domo mineralization continues to the south, east and north. We plan to focus our exploration at El Domo to prove up what we believe is a significant discovery and through systematic exploration efforts, adding significant tonnage to first of what could be many polymetallic mineralized bodies on the Curipamba project."

John Buckle, P.Geo., P.Geoph., the qualified person for the company, has reviewed this news release for its accuracy.

For more information please visit our website at: www.salazarresources.com

A QC program was used whereby 5% of all samples sent to the laboratory were standard samples with known silver and gold values. Sample preparation was performed by BSI Inspectorate Quito, Ecuador, using standard industry practices (sample prep minus 32). Analytical work was carried out at the BSI Inspectorate Laboratory in Lima, Peru, using fire assay methods for gold (Au-25 procedure). Standard samples, blanks and duplicate check samples were randomly inserted to the sample batch to ensure quality control.

ON BEHALF OF THE BOARD OF SALAZAR RESOURCES LIMITED

Fredy Salazar, President & CEO

Share
New Message
Please login to post a reply