continued...
<!-- /* Font Definitions */ @font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4; mso-font-charset:1; mso-generic-font-family:roman; mso-font-format:other; mso-font-pitch:variable; mso-font-signature:0 0 0 0 0 0;} @font-face {font-family:Calibri; panose-1:2 15 5 2 2 2 4 3 2 4; mso-font-charset:0; mso-generic-font-family:swiss; mso-font-pitch:variable; mso-font-signature:-1610611985 1073750139 0 0 159 0;} /* Style Definitions */ p.MsoNormal, li.MsoNormal, div.MsoNormal {mso-style-unhide:no; mso-style-qformat:yes; mso-style-parent:""; margin-top:0cm; margin-right:0cm; margin-bottom:10.0pt; margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} .MsoChpDefault {mso-style-type:export-only; mso-default-props:yes; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} .MsoPapDefault {mso-style-type:export-only; margin-bottom:10.0pt; line-height:115%;} @page Section1 {size:612.0pt 792.0pt; margin:72.0pt 72.0pt 72.0pt 72.0pt; mso-header-margin:35.4pt; mso-footer-margin:35.4pt; mso-paper-source:0;} div.Section1 {page:Section1;} -->
2004 Red Lake
Milled grade g/t = 77
Cash Cost per ounce = $92
2004 Campbell
Milled grade g/t =14
Cash Cost per ounce = $276
Combined grade = 36
Combined cost = $143
2005 Red Lake
Milled grade g/t = 82
Cash Cost per ounce = $94
2005 Campbell
Milled grade g/t = 15
Cash Cost per ounce = $312
Combined grade = 38
Combined cost = $149
2006 Combined
Milled grade g/t = 28
Cash Cost per ounce = $195
Within the Red Lake Mine they have two types of ore available to them - the super high grade and the much lower grade sulphide ore that was historically the main source prior to the mine reopening in 2001. By combining ore from multiple sources at varying grades Goldcorp is maintaining an average around 1 oz per ton. So they Red Lake complex went from a historical avearage grade around .3oz.t to the current 1 oz/t over a ten year period (the first half of which had zero production).
SGR will likely be shy of that number over he next few years as the high grade ore available is not quite as high grade as at Red Lake and the low grade ore is lower grade than at Red Lake. The key then for SGR is to, like Goldcorp, keep exploring in thier own backyard, so as to increase the proportion of high grade ore to low grade ore available to the mill. Consider the following scenario at steady state production in 5 years time...
Ore source/Grade/Daily Volume
SG1 @ .10 oz/t @ 400t = 40oz/d
RL Deep @ .4 oz/t @ 400t = 160oz/d
RL D-shaft @ 1 oz/t @ 200t = 400 oz/d
Hinge @ .75oz/t @ 400t = 300oz/d
CW @ .20 oz/t @ 400t = 80oz/d
Total daily tonnage = 1800 tons
Total daily ounces = 980oz
Total avearge head grade = .54oz/ton
Now consider how this would change 5 years further on with the discovery and development of 1 more high grade source of ore to replace SG1 in the mix...
NEW High grade disovery @ 1 oz/t @ 400t = 400oz/d
RL Deep @ .4 oz/t @ 400t = 160oz/d
RL D-shaft @ 1 oz/t @ 200t = 400 oz/d
Hinge @ .75oz/t @ 400t = 300oz/d
CW @ .20 oz/t @ 400t = 80oz/d
Total daily tonnage = 1800 tons
Total daily ounces = 1340oz
Total avearge head grade = .74oz/ton
Now cosnider that the cost per ton to produce grold at Red Lake is around $200 per ton of ore and you will realize that at $120 per ton SGR would be able to produce gold at a substantially lower cost per ounce thatn Goldcorp does at Red Lake.
e