Hinge Ore

This could be a pivotal week as the Hinge ore will be available. Are there any experts out there that could shed some light on what to expect as far as timing and grade of the bulk sample goes? A boost in confidence on mill grade could add a boost in confidence to the share price and seeing as how there is probably enough information to release the 43101 on the Hinge 4, a steady flow of good news in conjunction with a positive trend in the price of gold could add a significant increase to the market cap.

Join the conversation about San Gold Corporation.

Reply

Replies

  1. "This could be a pivotal week as the Hinge ore will be available."

    No it will not, not in any meaningfull way to production anyway. the process looks something like this...

    As the ramp reaches the ore zone at the desired level for development, and as the ramp continues to be driven, a development drift down the length (a portion thereof) of the vein wil be created. The "devleopment material" removed in the creation of this drift will in fact be ore from the vein under development but will include a large amount of waste material thus the grade of that "devleopment material" will be well below that of the vein itself.

    Once that drift is well under way and the drill stations are established and operating to better delineate the veins with underground drilling then a decision about mining technique can be made (favouring mechanical cut and fill??? but could change once they are in the vein and better appreciate its dimensions, contacts, etc). In the meantime safety zones, ventilation and access raises will have to be developed as well.

    The first drift should take about half as long as long as the decline took and they will likely report face sampling results somewhere along the way (as they have done with veins under develpoemtn in the Rice Lake Mine).

    All told it will likely be q3 (assuming cut & fill. q2 of 2010 if they switch to shrinkage stope) before any signifcant volumes of high grade ore from the hinge zone (undiluted by large volumes of development material) are processed throught the mill.

    I hope this helps.

    e

    1. Cut-and-fill stoping is suited to irregular orebodies with wall rocks that cannot support loads over large stoping heights. Since backfilling adds a step to the miningof each slice of ore, the ore has to have a high enough grade to offset the added cost.

      The stope is mined upward from below, in horizontal slices or cuts. Each slice is blasted on to the floor of the stope and the ore is mucked to the stope mill hole, which leads to the chutes in the haulageway below. The mill hole is a vertical opening and is usually lined with steel. Mining a slice leaves a space along the entire length and width of the stope. Alter the mill hole and manway structures have been extended, the stope is backfilled, leaving enough work space above. Usually the top portion of each new layer of fill is a concrete mix that provides a solid work floor to support heavy equipment. The process is repeated until the level above is reached, or to some predetermined pillar line.

      Cut-and-fill is very flexible. Ore production can be carried out in one part of the stope while the other part is being filled. It also allows miners to selectively mine ore and waste with little dilution. By identifying waste, it can be left behind in the stope as fill. With a competent ore rock and proper support, it is also quite safe.

      from... http://www.miningbasics.com/html/cut...

      1. The mill hole is a vertical opening and is usually lined with steel.

        Not be critical, but in my days as a timberman at Giant, we raised a lot of millholes, always using timbers, never steel. Maybe the process has changed in the last 40 years or so! (the Giant Grizzlies also used wooden hockey sticks!)

        Again I stand to be corrected, but it's unlikely they'll use raises in the near term, but will haul the ore blasted from the stopes developed in the Hinge directly to surface where they'll either stockpile or feed it into the mill. Same can be said for development ore which can be fed through the mill at any time.

        In 1965, Giant whose geology was very similar to SAN, was trading at $12.00+.

        IMHO, its just a matter of time.

        RUF

        1. From an ELEMENTE1 posting

          , a development drift down the length (a portion thereof) of the vein will be created. The "devleopment material" removed in the creation of this drift will in fact be ore from the vein under development but will include a large amount of waste material

          Two questions or comments ?

          If my reading of hinge # 4 is correct it should be wide enough that waste along the sides of the developement drift should be minimal ?

          What is a mill hole with steel or timbers doing in San Gold rock - some of the reportedly hardest rock found in mines I am told ? - and right on Ruf 'The ore will be hauled up the decline for a long time yet. at least for my lifetime.

          LOL RM





          1. "If my reading of hinge # 4 is correct it should be wide enough that waste along the sides of the developement drift should be minimal ?"

            once they fully better undrstand the outline of the vein your observation will apply. but while cutting the very first drift in the vein they only have the drilling results to go by... and they make it obvious that the width of the vein varies for a few feet accross to 20 feet across. As they create the first drift they will run into spots where the vein thins out and others where it thickens.

            For arguments sake lets assume the first drift is done at 16ft high and 20 feet wide. and 100 feet along the vein. If the first 30 feet of the vien run at 20 feet wide and the next 30 thin out to 15 feet wide and the next 20 thin to 6 feet wide and then the last 20 feet are at 10 feet wide then the math looks like this...

            Total Drift = 100ft x 20ft x 16 ft = 32000cubic feet/11.5 = 2782 tons of material in total.

            30 x 20 x 16 = 9600/11.5 = 835t

            30 x 15 x 16 = 7200/11.5 = 626t

            20 x 6 x 16 = 1920/11.5 = 167t

            20 x 10 x 16 = 3200/11.5 = 278t

            Total Mineralized ore = 1906tons

            2782 tons - 1906 tons = 876 tons of waste material = 31.4% waste material in the first drift

            An advantage of the cut & fll method is that after this first drift is done each cut above it can take into account the varying thickness of the vein to minimize dilution.

            e



          2. "What is a mill hole with steel or timbers doing in San Gold rock"

            the info on cut & fill was general info to give a genral idea of the method and not was specific to SGR's operations. a review of the last 43-101 (last few pages) will show that both timbered and open raises are applicaple at SGR.

            e

          3. RM, I agree Dale said that the Rock in the San Antonio was the hardest around and screening and back filling was not required. I am curious to your thoughts here on what happened here. ( down. In

            the lower area of the Rice Lake Mine, we looked at the 4605-96E a LH stope where the HW

            collapsed, fortunately after most of the broken ore had been removed. Although the 96 vein

            has been reasonable stable at higher levels, this stope had been opened over a length of 140’

            which was probably too great a span )..Would we require a different attack on these new wide veins down below, is it possible we are seeing different geology or just because the ore is richer and these veins are wider. What will happen with SGI as they had a high Strip Ratio.

            Longhole – This method is used where the ore zone is wide and dips fairly steeply. It was the

            method used at the SG-1 mine, but it is not selective, and when the entire quartz vein must

            be taken and the country rock is heavily sheared, there can be signifi cant dilution, which happened

            at SG#1, where the grade dropped to about 0.08 oz/ton before it was shut down,Thanks. Long on the Greens Traps7

            1. Replying to @traps7

              SG1 was shut down because the long hole ore was exhausted and they want to revert to cut and fill method to cut down on amount of low grade ore after it is frozen underground. Water was a problem in this mine in the winter.

                1. Replying to @Silverback

                  I have not noticed any refernce to the choice of mining method for the Hinge Zone as an issue in any news release from SGR.

                  The reason I am of the opinion that they will be considering this method is because of a discussion with a member of the BOD in November. In that part of the conversation various mining methods were discussed, their processes, advantages and disadvantages depending on deposit/vein type/dimensions/grade. As we discussed how different methods may be applied to the SG1 deposit, now that it is better understood, to reduce dilution and increase grade. Mechanical Cut & Fill is one method that was discussed, and as its process was described a reference to its applicability in the case of a vein like the Hinge #4 was touched upon.

                  The key advantages mentioned in the context of SG1 were the ability to control dilution and reduce the haulage of waste rock as it can be used for fill. Apperently in SG1 the mineralized ore has a section in the middle, several feet wide, that is not well mineralized so that if you take the full width of the vein you get all the dilution of that middle section (as when longhole or shrinkage stoping). But with the cut and fill method you can cut and muck the mineralized sections leaving behind the waste section to be broken an used for fill.

                  In the case of the Hinge zone I think it is the combination of the large and varying widths of the veins, high grades and sharp contacts that make it a desirable method for consideration.

                  e

                  1. Replying to @elementwise1

                    I'm sorry but I was not clear. My request was in reference to this statement by Hotmuck

                    SG1 was shut down because the long hole ore was exhausted and they want to revert to cut and fill method to cut down on amount of low grade ore after it is frozen underground. Water was a problem in this mine in the winter.

                    Not so much the mining method but that the mine was shut down and that water was a problem in that mine this winter. Could you please direct me to an NR addressing those two issues specifically.

                    1. Replying to @Silverback

                      Read the previous post by traps and you will see where it came from. The miners and equipment from SG1 were diverted temporarily to the hinge ramp, which was more important because of the extreme high grades. Just a normal mining decision that did not have significant impact. Dewatering is normal in most underground mines and because the hinge is totally dry just like the San Antonio, it will be easier to mine. There was no flooding or any significant reason to stop SG1 mining other than lack of equipment and miners were still a problem when they shifted the major focus to the Hinge.

                    2. Replying to @Silverback

                      Silver, to answer you directly, there was no NR from the company adressed (a) status of long hole stopes in SG1, (b) change in mining method (c) water in SG1.

                      I hope we don't (although it is always fun) find ourselves repeating our past exchanges on what is/isn't "material" as defined for the purpose of requiring the company to issue an NR. I have sneaking suspicion that is the direction you were headed with your very valid inquiry... so consider this a pre-emption.

                      I can validly clarify the issues, somewhat I think, as I believe I was a party to the conversation from which HM recollects and shares this info. My recollection differs a little and without suggesting my memory is any beter than HM's I will suppose that the same conversation can be interpreted and recounted in different ways (particularly when rushing to type a quick post).

                      As far as I can recall HM's level accuracy is as follows...

                      "SG1 was shut down because the long hole ore was exhausted" - yes and no - yes the first stopes that were being mined were exhausted - no that is not the only reason. and it was not "shut down". manpower was shifted to a high priority and activity at SG1 will restart when their mining plan calls for it.

                      "and they want to revert to cut and fill method to cut down on amount of low grade ore after it is frozen underground." - I doubt they will sned minerss in to work while it is frozen - it will wait till spring - they did not use cut & fill in SG1 yet so it would not be a "reversion" buttather a change in method and I don't recall it being expressed as a final decision but as a method under most serious consideration for its significant advantages.

                      "Water was a problem in this mine in the winter." not if that cold air did its job!!! If they were unable to freeze it dry then the only problem is that they have to keep running the pumps all winter and dedicate the manpower to keep them running and maintained (plus power/fuel costs).

                      Here is my version of the critical points...

                      As the group of us stood shivering about 40 metres from the entrance to the SG1 decline a member of the BOD explained that the SG1 mine was not active at the moment since the manpower and equipment had been shifted to work on the Hinge decline in the months previous. Considering the results of the long hole method (with dilution bringing the grade below .10oz/t) it was decided that a review of the mining method was justified before continuing on lower levels that are ready for development. The most recent MD&A (page 7) mentioned that mechanical cut & fill was one of the methods in use in the comapany's mines. No NR needed on this subject as his is an operational decision (mining method) that gets covered in MD&A's and in feasability type 43-101's and mining plans and it chages as operations/minng conditions dictate .

                      Without reference to the conversation I submit that we can, from the 43-101 and the finiancials, calculate that they had in fact finished mining the first blocks of reserves in SG1 So this information was not new to us but was only confirmed by this converasation. And that last MD&A(page 7) states "Also, there will be less dependence on SG1 production". No NR needed for this as it is operational info just like details of which level of the Rice Lake mine they may be working on this month or next month...also covered in MD&A. No NR needed.

                      It was observed as our teeth chattered that the ventilation fan was running full tilt and it was explained to us that it was being run to blast the cold Manitoba air into the mine to freeze it up. Unlike the Rice Lake mine, which is very dry, the SG1 deposit has a flow of water that is pumped, like most other mines, to ensure operations can continue uninterupted. By blasting cold air into the mine while it is not being operated they hoped to freeze the water in the cracks and fissures (and the air of a Manitoba November/December can do the job) to slow or even stop the flow. This reduces or eliminates the need for pumping over the winter. This was an operational decision not requiring any kind of NR and the need for pumping in a mine is not NR worthy, it is rather an operational assumption in most mines which is one of the things that makes the Rice Lake Mine unique. If all of a sudden they had to start pumping large volumes from Rice Lake mine then that would deserve an NR IMO.

                      Hope this helps, Silver.

                      e





                        1. Replying to @Hotmuck

                          HM, restraint was not required. Silver, as in this case for example, has often done us a service by asking questions he obviously knows the answer to so as to prompt a discussion (sometimes vigorous debate) of a relavent issue(s) of concern to shareholders.

                          If you really think the expalanation was for the benefit of Silver then you have misjudged me. There are many who read this forum who never (or rarely) make their presence known. They, and the majority of posters here who genuinely are seeking to increase their base of knowledge about a company they have invested in, are those that the "explanation" was for. They deserve, whenever possible, to get some clarity on issues when they come up in a manner that creates unanswered questions.

                          e





                      1. Replying to @elementwise1

                        Thank you for taking the time for an in depth explanation, elementwise.

                        And yes, I believe shutting down one of two existing mines is material, warranting some explanation to shareholders direct from the company.

                        I will leave it at that, at risk of disturbing Hotmuck any further.

                        1. Replying to @Silverback

                          You are very welcome Silver, Thank you for asking the question in the first place - it was a discussion that was needed here. Please do not allow any concern about HM's (or anyone else's) feeling s being hurt - stop you from posting your (civil) thoughts - NorthLion is always watching over our shoulders ( BCB willprobably quote this part on SH) to make sure anything over the line (inbreach of the rules) is cut short.

                          "And yes, I believe shutting down one of two existing mines is material,"

                          I agree 100% with this statement.

                          As to your concern that an NR was required of SGR to report on the status of SG1 becuase you "believe shutting down one of two existing mines is material" I must disagree 100% (here comes the vigorous debate).

                          Firstly, there has been no "shutting down one of two existing mines". It has not happened - if it did, if SGR actually shut sown one of its mine, then yes an NR would be absolutely required. But SG1 has not been shut down! So why would the issue an NR saying it has been - it would be a lie! The mine is fully operational and in an active state for readiness to resume development and mining activity as soon as they are ready to. Manpower has been shifted from SG1 to a higher priority.

                          Secondly, a glance at the mining plan for SG1 (in the 43-101) reveals that the first block to be mined was that portion above the sixth level and that before continuing to the block from the 6th level down to the 10th level a 1 quarter interruption of mining activity would take place. They had also planned on, and likely will, doing additional drilling in SG1 before continuing to develop the decline to lower levels. But while staff are working elsewhere on the SGR property SG1 is kept waiting Any NR on this subject would not have announced a "shutting down" but simply a "we are following our mining plan as best we can" which would be a waste of an NR don't you think?

                          Fourth, the timing of availability of staff, finished their work for now in SG1, was extremely fortunate and allowed the company to get moving quickly on the Hinge decline within months of discovery of the deposit. This was mentioned MD&A (as previously referenced). The Hinge decline work was announce in NR's and I don't think there is anything material to be reported about shifting of manpower from one bunch of work to another - otherwise we are back to our debate of the need for daily update NR's about which crews are working what zones etc... let's not go there agian okay Silver?!

                          e

                      2. Replying to @elementwise1

                        manpower was shifted to a high priority and activity at SG1 will restart when their mining plan calls for it.

                        I don't know about others here, but my thinking is that in a small operator such as this that has been struggling to get production going, this sort of information is very material. This should have been discolosed if only to let the market know that they won't be meeting production forecasts, albeit for a very good reason.

                        1. Replying to @Deliverator

                          Deliverator, you confuse me. How many times do you want them to publicly disclose the same information?

                          The mine plan for SG1 was publicly disclosed in the 43-101 long ago and specified a break in mining activity after the first block was mined and before the next block was mined. That time is now. So the info on the break in mining activity is already public and requires no new NR for disclosure. If you insist it does then we get back into the debate about the daily update NR's to disclose what steps along the mine plan have been taken/achieved each day since everyhting they do every day is"material"(let's not).

                          The fact that there is another high priority that requires staff to do work has been public info since late last summer when they announced in an NR that San Gold Staff were working on the decline into the Hinge. Those staff didn't materialize from thin air.. they must have been reassigned from somewhere and it is not matirial from which work assigniment within the SGR operations they have been reassinged from.

                          As far as relavence to Production Targets... what????!?!??!?!?.... production is up since they finished the first block at SG1 (see quote from MD&A below). If anyhting the shift of manpowwer away from SG1 is positive for their ability to reach production targets.

                          The last MD&A on page 7 addressed this issue as well (public disclosure) commenting that...

                          "ore from the SG1 mine is lower grade than the ore historically mined from the Rice Lake Mine. Correspondingly metallurgical recoveries have been lower than historically achieved at the operation due to lower grade ore and the mill is not being fully utilized at the present time. During the fourth quarter of 2008 overall grade is expected to improve with a higher proportion of ore from Rice Lake. In fact, recovered grade in the subsequent period for the month of October was 0.17 from feed grades of 0.19. Also, there will be less dependence on SG1 production as manpower and equipment are redeployed to Rice Lake and the Hinge development areas."

                          Do you suggest they re-issue this statement in an NR too? By now it is old news - it came out in mid November around the same time I was standing in front of SG1 observing the ventilation fan running.

                          So, Deliverator...I agree that "this sort of information is very material. This should have been discolosed" and I point out that it was disclosed to the extent it was material and at the times it was material.

                          e





                          1. Replying to @elementwise1

                            EW, and that is why I don't feel that you have to keep educating the people that have all read this stuff before and have very short memories. if you think this upsets me, you're dreaming, I have my opinions, give relevant info to people who can remember and the rest, who cares! Your details are well appreciated and largely speculative, something people need to understand.

                2. Replying to @Silverback

                  •

                  Longhole

                  –

                  •

                  Longhole – This method is used where the ore zone is wide and dips fairly steeply. It was the

                  method used at the SG-1 mine, but it is not selective, and when the entire quartz vein must

                  be taken and the country rock is heavily sheared, there can be signifi cant dilution, which happened

                  at SG#1, where the grade dropped to about 0.08 oz/ton before it was shut down. In

                  the lower area of the Rice Lake Mine, we looked at the 4605-96E a LH stope where the HW

                  collapsed, fortunately after most of the broken ore had been removed. Although the 96 vein

                  has been reasonable stable at higher levels, this stope had been opened over a length of 140’

                  which was probably too great a span. The photo below shows the HW slabs at the brow of the

                  stope. Lessons learned here will be applied in future stopes to reduce the hydraulic radius on

                  the HW by leaving pillars, preferably in lower grade ore.

                  This method is used where the ore zone is wide and dips fairly steeply. It was the..Traps 7

              1. Replying to @Hotmuck

                I hope Hotmuck does not take this personally... It all comes down to SEMANTICS (and his careless use of language).

                "SG1 was shut down because the long hole ore was exhausted and they want to revert to cut and fill method to cut down on amount of low grade ore after it is frozen underground. Water was a problem in this mine in the winter."

                This whole series of posts would likely have been competely avoided had Hotmuck not used the words "shut down" in his post. Semantics!

                Lets look at revised (by me) version of HM's post...

                ""SG1 staff has been re-assigned right now because the long hole ore was exhausted. They want to consider changing to cut and fill method to cut down on amount of low grade ore when they resume mining on the next block. Water is a reality in this mine and since they have no staff in the mine this winter they can get it frozen underground to reduce pumping requirements."

                Now just imagine he added more detaile ..."mining of the first stopes in SG1 was complete and they are following the mine plan and logical process of taking the time needed now to study the results and determine based on those results the best way to proceed to maximize the profitibility of the deposit over the mine life. In the mean time the staff who have been working in the this zone have been re-assigned to a high priority project"

                For some fun with semantics imagine that instead of "shut down" he used "shut-down"

                that bit of punctuation makes all the difference because "shut-down" is defined as "a temporary stoppage of operations" and that is much different from a "shut down" which suggests permenance. Of course I expect the responses would have been the same since few are likely to have noticed the impact, semantically, of that little horizontal line.

                As for the water. HM again got caught on semantics... the water was never a "problem" (not this winter or last winter any more than it will be for the life of the mine. the water just is. as it is in most mines. and must be dealt with accordingly.) unless you want to consider anythting that normally goes on in operatiing a mine a "problem".

                Even the word "revert" was used here sloppily in that it is defined "to return to an earlier state, practice or belief". So technically the only way to "revert" SG1 would be to truck all the rock including the gold back in and fill the mine back up... I think we can be sure that is not what HM was trying to say.

                ain't english grand!?!

                e





                1. Replying to @elementwise1

                  • E..i think hotmuck was just referring to the language used in this p i financial report that says SHUT DOWN.

                  •

                  Longhole – This method is used where the ore zone is wide and dips fairly steeply. It was the

                  method used at the SG-1 mine, but it is not selective, and when the entire quartz vein must

                  be taken and the country rock is heavily sheared, there can be signifi cant dilution, which happened

                  at SG#1, where the grade dropped to about 0.08 oz/ton before it was shut down. In

                  the lower area of the Rice Lake Mine, we looked at the 4605-96E a LH stope where the HW

                  collapsed, fortunately after most of the broken ore had been removed. Although the 96 vein

                  has been reasonable stable at higher levels, this stope had been opened over a length of 140’

                  which was probably too great a span. The photo below shows the HW slabs at the brow of the

                  stope. Lessons learned here will be applied in future stopes to reduce the hydraulic radius on

                  the HW by leaving pillars, preferably in lower grade ore.

                  1. Replying to @traps7

                    Agreed, he likely was referring to that analysts rendering of the situation... and semantics gets us again. Lets look at the grammer in the analyst's statement "Longhole – This method is used where the ore zone is wide and dips fairly steeply. It was the

                    method used at the SG-1 mine, but it is not selective, and when the entire quartz vein must

                    be taken and the country rock is heavily sheared, there can be signifi cant dilution, which happened

                    at SG#1, where the grade dropped to about 0.08 oz/ton before it was shut down."

                    Firstly it is a run on sentence that has incorrect punctuation. It leaves us wondering, does the word "it" before "was shut down" apply to "This method" as subject of the entire statement or is "it" being applied to SG1, the mine in which that method was being used or is "it" a combination of the two?

                    options to define "it" in "before it was shut down":

                    a) before the longhole method was shut down.

                    b) before the SG1 mine was shut down.

                    c) before the use of the longhole method in the SG1 mine was shut down.

                    In my view the whole statement is about the longhole method and its impact. The reference to SG1 is in use as an example of the potential impact of applying this method and talks about its use there.

                    In my view "before the use of the longhole method in the SG1 mine was shut down" is the appropriate interpretation of the analysts statement.

                    Lets face reality too... an analyst is not the company and does not speak for the company. The MD&A from the comapny told us that production would be neglected at SG1 months before the analysts report came out and just look at the financials.. there is a long term liability called Asset retirement obligation. If they shut down a mine not only will an NR be required but they will have to either put it into care & maintanence status or start coughing up the cash to "retire" the asset.

                    SG1 has not been shut down only shut-down and anyone who says otherwise is either simply wrong or confused by semantics.

                    e












                    1. Replying to @elementwise1

                      element,

                      What a bunch of nonsense.

                      I was told to come to this site to get all the latest info on this co. but i see this is as bad or worse than the other site.

                      Can't you guys find something better to discuss than where hyphens and comma's are located? Like when co objectives are likely to be met?

                      trd.






                      1. Replying to @therealdeal

                        TRD,

                        There has been a lot of back and forth on this board about communications and the lack of communications to put it as simple as possible.

                        What element is doing is explaining how the choice of words in a communication can cause a lot of trouble and unintended results.

                        It just happens to be the topic right now.

                        If you are looking for more info related to the company and what they are doing, go back into the posting history and you find all that you desire. There are many on this board who offer a lot of insight that people like me, with no experience in the mining industry, can start to see what the issues really are behind all the 'buzz words' and phrases used by the mining industry today.

                        If you are looking for the hard and fast info on mine plans and company projections, you have come to the right place, because these guys definitely lay it out there.

                        stick with us and you will see

                        Andy

                        1. Replying to @AndyK

                          AK,

                          I hear you and hardcore mining and finance is what this forum should stick to.

                          If there is a misunderstanding in somebody's communication, that can be pointed out in a single line. Rather than turning the site into a Grade 5 language class. Been there, done that, quite awhile ago.

                          Also it seems to me that there are experienced mining people on here and others that are self appointed and type well. Sometimes known as 'wannabe's'. It's unfortunate that the typists usually seem to overwhelm the miners since it's an electronic venue.

                          So I like reading the good posts that stay on message here. What makes me wander elsewhere and talk to myself is when some clown gets off an a tangent while enjoying watching himself type about something nobody else cares about.

                          trd.











                          1. Replying to @therealdeal

                            trd, thank you for the nudge to get back on-topic (not that the difference between a shut-down mine and a shut down mine at SGR is actaully off-topic - clearly some thought SG1 was shut down when it was not).

                            "Like when co objectives are likely to be met?"

                            There seem to be two key objectives I am waiting to see solid evidence of. First is production and fortunately the news of increased grades since October is pointing in the right direction. Sustainable production volumes over 800t/d plus at these grades can't happen fast enough IMO but the real life challenges of balancing mining and development have us waiting still. We sould have some solid news in the Annual Report due out in about 2 months.

                            Second is the 43-101 for the Hinge and I am starting to get more than a little impatient myself. I understand the whys of the delay but I am beginning to question the trade off of time vs. quantity.

                            BTW trd, I agree that I went overboard with explanation about the SG1 confusion. In my own feeble defence I observe that in the first instance the "misunderstanding in somebody's communication" was "pointed out in a single" post but continued to be missunderstood/missrepresented. I felt some clarification at least was required.

                            By now you may be wandering elsewhere to talk to yourself but before you go please clarify something for me... which of these two categories, that you observe are present here, are you a member of?

                            (a) experienced mining people

                            (b) self appointed and type well. Sometimes known as 'wannabe's'

                            If (a) then I respectfully and sinccerely beg you to contribute some of your knowledge here. We need all the help we can get.

                            If (b) then allow me to complement you on your typing and welcome you to the club. We do have fun here when we can.

                            e





                            1. Replying to @elementwise1

                              e,

                              If all manpower has been moved out of SG1 it is effectively shut down no matter how you spell it. No language class req'd. I passed gr. 5.

                              I get only core assay result reports so op's plans / timelines have to be searched for. I hear through the grapevine that things are coming but timing is fuzzy. I guess the theory here is if there is no real timeline, then it's impossible to go off it. Or something like that.

                              Without seeing operational plans and timelines from the co., any comments I would make would be speculation which is not what we need more of here. It looks like anybody that has real op. timeline info also has a direct contact within the co. Which is ok with me so long as they state the info is solid and not just hearsay or speculation.

                              trd.





                              1. Replying to @therealdeal

                                "have to be searched for."

                                What is DD if not looking for the info you need to make an informed decision??

                                The info you seek (operational plans and timelines) has been publicly released anyway and is not at all hard to find. The mining plan (table 10-1 I think) for Rice Lake, SG1 and CW was in the 43-101 which is on the web site and easy to find. The last several NR's have outlined operational plans and timelines with respect to the Hinge/CW decline including updates as to the progress being made in almost each NR. If you are reading the core assay results in the NR's you might as well read the rest of the page and find this info easily as well.

                                "if there is no real timeline, then it's impossible to go off it."

                                It might have been preferable had they taken that appoach. but instead they keep on talking timelines and unfortunately they have virtually never yet met any timeline target they have publicly released.

                                e

                              2. Replying to @therealdeal

                                "SG1 it is effectively shut down no matter how you spell it. No language class req'd. I passed gr. 5."

                                trd, perhaps in your elementary school hyphens and use of the dictionary were not covered untill grade 6.

                                SG1 is shut-down not shut down.

                                e

                2. Replying to @elementwise1

                  ...to the guy in the picture named Cliff. not sure where i sit, one side of the bar is for the smart guys that can type ( leaves me out ) and one side is for the miners,. I am a wannabe, just not sure what i want to be. I guess according to your last few post i should sit under the table as i do run sentences and talk, off in left field with gr 5 english. I notice you got 5 green stars for your splitting of the bar so you do have frinds. Thinking out loud, i guess the board can be controlled by the smart people handing green stars and knocking down the wannnnnabes. Cliff over the last three yrs you were doing find , lately so seem to have found a attitude. .... Waiter.... bring me another beer....with out prejudice, Traps7

            2. Replying to @traps7

              TRAPS7

              Most of the quartz veins are brittle and severely cracked and areas not all removed during ore blasting likely will fall in the future, often this happens unnoticed in abandoned areas of the mine.

              I while surveying an completed stope around 1957 in the Rice Lake Mine saw the quartz back peel off along an area of about 50' x 30' and some 5' plus thick just after one of our survey party passed under it leaving the steel chain he and I were holding lost under it. The host or waste rock usually consists of the very hard rock Dale and Hugh refer to and can stand firmly across wide areas for long periods of time.

              Most mill holes or ore chutes connecting an overhead stope down to where a "scoop tram" can access the ore ??? are in the above mentioned host rock and normally do not require surface support, ie timbering or screening etc.

              Hope this explains my comments more clearly.

              RM



              1. Replying to @retiredminer

                In geology a fault, or fault line, is a planar fracture in rock in which the rock on one side of the fracture has moved with respect to the rock on the other side. Large faults within the Earth's crust are the result of differential or shear motion and active fault zones are the causal locations of most earthquakes. Earthquakes are caused by energy release during rapid slippage along a fault. A fault that runs along the boundary between two tectonic plates is called a transform fault.

                Since faults do not usually consist of a single, clean fracture, the term fault zone is used when referring to the zone of complex deformation that is associated with the fault plane. The two sides of a non-vertical fault are called the hanging wall and footwall. By definition, the hanging wall occurs above the fault and the footwall occurs below the fault. This terminology comes from mining. When working a tabular ore body the miner stood with the footwall under his feet and with the hanging wall hanging above him..........Keeping this in mind, Dale referred more than once in our last deep drilling news release, that the 96 vein was extended towards the hangwall and dipping down towards the footwall ,...he also talked about the wide true withds of a large new vein heading North and down towards the footwall. I beleive one can view this vein on pg 183 od ACA Howe 2004 report. Using the map scale this north vein is at least 700 x 800 ft and Dale says true mining width of around 16 ft which is right according to the map scale. The map shows at least 3 to 4 more to be found and the grading is proving to be very profitable in the future. We know San has at least 4 kil of Sam Norm and it will be interesting what we find below the footwall.Traps7

                1. Replying to @traps7

                  ..just thinking out loud here, but remembering this...

                  Scientists have developed computer models to analyze the power of meteor impacts. They believe the Sudbury meteor, six to 12 miles in diameter, exploded on impact with the blast of 10 billion Hiroshima bombs.

                  "We ... believe that the meteor impact fractured the crust of the Earth to great depths and then rocks or magma, molten rocks from deep down in the Earth, came up and spread along between these younger rocks and the old crater wall," Meyer said. ...again just a thought but science tells us that the now great lakes was once a massive ocean and with the earth fractured with many faults ,did the ocean salt react with the hot molten metal riseing from with in the earth and cause the positive ion charge of gold to travel these deep fauts being attracted to the negative charge of the massive copper fields. Crow fly from Sud to Bissett is not far and we know Gold corp has deep rich veins and Dale says ours are getting richer down below. Don;t laugh yet, yes we know gold erupts from the centre of its pluton and follows the cracks, but with a massive salt fluid pushing this hot positive chaged fluid through the faults then who knows where the gold settled, gold don'T STOP AT STOP SIGNS and we have large negative copper finds all around us,. OK . go ahead and laugh. Long on the Greens Traps7

    2. Thanks for the feedback. How long in your opinion before we see some bulk sampling of the Hinge ore? From what I've read, when you're dealing with high grade veining, a comparison between "drill assays" and "bulk sampling" is very important and required to get "resources" into the "reserves categories". If this is the case and from what you are saying, the reserves on the Hinge 43101 may not be that high if the bulk sampling isn't done before the report is published. Is this correct?

      1. Nice to see you back (as) Lunch.

        "the reserves on the Hinge 43101 may not be that high if the bulk sampling isn't done before the report is published. Is this correct?"

        I expect you are correct with refernce to "Proven Reserves".

        The "bulk sample" will be the first bit of mining (10,000 tons or so???) and that is not likely to be completed untill after the report is out (unless they delay the report 6 more months at least). I would exect that Hinge 43-101 to include mostly inferred resources (over 1 million ounces perhaps) along with some small portion (under 250,000 ounse) of "Probable Reserves" from definition drilling of the zone being develped for initial mining.

        e