Silver, to answer you directly, there was no NR from the company adressed (a) status of long hole stopes in SG1, (b) change in mining method (c) water in SG1.
I hope we don't (although it is always fun) find ourselves repeating our past exchanges on what is/isn't "material" as defined for the purpose of requiring the company to issue an NR. I have sneaking suspicion that is the direction you were headed with your very valid inquiry... so consider this a pre-emption.
I can validly clarify the issues, somewhat I think, as I believe I was a party to the conversation from which HM recollects and shares this info. My recollection differs a little and without suggesting my memory is any beter than HM's I will suppose that the same conversation can be interpreted and recounted in different ways (particularly when rushing to type a quick post).
As far as I can recall HM's level accuracy is as follows...
"SG1 was shut down because the long hole ore was exhausted" - yes and no - yes the first stopes that were being mined were exhausted - no that is not the only reason. and it was not "shut down". manpower was shifted to a high priority and activity at SG1 will restart when their mining plan calls for it.
"and they want to revert to cut and fill method to cut down on amount of low grade ore after it is frozen underground." - I doubt they will sned minerss in to work while it is frozen - it will wait till spring - they did not use cut & fill in SG1 yet so it would not be a "reversion" buttather a change in method and I don't recall it being expressed as a final decision but as a method under most serious consideration for its significant advantages.
"Water was a problem in this mine in the winter." not if that cold air did its job!!! If they were unable to freeze it dry then the only problem is that they have to keep running the pumps all winter and dedicate the manpower to keep them running and maintained (plus power/fuel costs).
Here is my version of the critical points...
As the group of us stood shivering about 40 metres from the entrance to the SG1 decline a member of the BOD explained that the SG1 mine was not active at the moment since the manpower and equipment had been shifted to work on the Hinge decline in the months previous. Considering the results of the long hole method (with dilution bringing the grade below .10oz/t) it was decided that a review of the mining method was justified before continuing on lower levels that are ready for development. The most recent MD&A (page 7) mentioned that mechanical cut & fill was one of the methods in use in the comapany's mines. No NR needed on this subject as his is an operational decision (mining method) that gets covered in MD&A's and in feasability type 43-101's and mining plans and it chages as operations/minng conditions dictate .
Without reference to the conversation I submit that we can, from the 43-101 and the finiancials, calculate that they had in fact finished mining the first blocks of reserves in SG1 So this information was not new to us but was only confirmed by this converasation. And that last MD&A(page 7) states "Also, there will be less dependence on SG1 production". No NR needed for this as it is operational info just like details of which level of the Rice Lake mine they may be working on this month or next month...also covered in MD&A. No NR needed.
It was observed as our teeth chattered that the ventilation fan was running full tilt and it was explained to us that it was being run to blast the cold Manitoba air into the mine to freeze it up. Unlike the Rice Lake mine, which is very dry, the SG1 deposit has a flow of water that is pumped, like most other mines, to ensure operations can continue uninterupted. By blasting cold air into the mine while it is not being operated they hoped to freeze the water in the cracks and fissures (and the air of a Manitoba November/December can do the job) to slow or even stop the flow. This reduces or eliminates the need for pumping over the winter. This was an operational decision not requiring any kind of NR and the need for pumping in a mine is not NR worthy, it is rather an operational assumption in most mines which is one of the things that makes the Rice Lake Mine unique. If all of a sudden they had to start pumping large volumes from Rice Lake mine then that would deserve an NR IMO.
Hope this helps, Silver.