The Hinge #4 zone has now been drill tested between section 0 east and 800 east (feet), (250 m) and to depths of
over 1,200 feet (400 m) demonstrating excellent continuity in both structure and grade.
Sounds like this may be the cut-off point for our 43-101.
Cheers