Skip to content
Sign in

Post

San Gold Corporation

Replies

    1. What bothers me is their spec sheets say 11grams ton and they are producing just over 6 grams. Some drill results will be nice but I think we should all discount them by 40% to get a real number.

      1. Some drill results will be nice but I think we should all discount them by 40% to get a real number.

        The drill results will give us the size of the resource and after that it is up to everyone to figure out the cutoff grade and the dilution to come up with a mineable resource and production cost. At these prices they can mill 3 gram material and make a profit.

        1. Yes they can mine 3 grams per ton but the cost per ton would be very high $1100 + per ounce. The drill results do not give you an accurate grade if they are indicating 11grams per ton but they are milling 6 grams per ton. So I am saying to be safe for now I would discount any drill results until such a time as they prove the accuracy of the drill results with mill results. This mine will be just mediocre at + $600 per ounce cost. Not that long ago they were saying the cost would be around $380. I just don't want to see anyone getting caught in the hype when the drill results do come out and they drive the price up only to drive it back down a day or two later.

          1. Just like every other mine in the archean greenstone belt, successful exploration and mine development is based on multiple models and is required in order to prove up world class gold camps.

            "Major financings for underground exploration and development of Archean gold deposits should be based on well defined geological potential, otherwise, there is a high probability that Canada will miss out on significant gold production.


            In addition to the standard operating procedure “drill for structure” and “drift for grade” that was common to the major Archean gold mining operations in Canada, the other commonly accepted parable was that “gold mines are made, not discovered”.

            Drill for structure, drift for grade. There would be no gold mines in the area if companies had to raise money to go mining based on drill results from narrow veins, including the Dome mine which produced 10 g/t over 8 decades.

            "The standard operating procedure for decades by experienced gold developers was “drill for structure” and “drift for grade”. This was basically the standard operating procedure for the majority of the Archean gold mines that have been historically opened in Canada."

      2. What bothers me is their spec sheets say 11grams ton [sic] and they are producing just over 6 grams.

        I'm assuming that the current grade includes dilution from development ore dug from the access ramp. I've noticed that the average milled grade has been increasing with each report this year, presumably as the development ore is worked through.