Nothing on Sedar. I guess they are exempt from the 45 day filing period for the 43101. Which means it hasn't been verified by a third party which can only mean one thing...the whole lead up to the new 43101 in H1 was smoke and mirrors and another promise missed imo. They will argue semantics. I don't believe indicated went down with $60 million spent on exploration and I think they are taking advantage of some reporting loopholes. Well at least Geoex isn't involved.

Join the conversation about San Gold Corporation.

Reply

Replies

  1. The loophole:

    From June 14 NR

    • The company is a producing issuer as per NI 43-101 Section 5.3

    http://www.ccpg.ca/profprac/en/Documents/ni_20110624_43-101_mineral-projects.pdf

    Section 1.1

    “producing issuer” means an issuer with annual audited financial statements that disclose

    • (a) gross revenue, derived from mining operations, of at least $30 million Canadian for the issuer’s most recently completed financial year; and
    • (b) gross revenue, derived from mining operations, of at least $90 million Canadian in the aggregate for the issuer’s three most recently completed financial years;

    Section 5(3)

    Despite subsection (1), a technical report required to be filed by a producing issuer under paragraph (1)(b) or (c) is not required to be prepared by or under the supervision of an independent qualified person.

    Section 4.2 - 7&8 contain specifics on timelines to file the official report. I can't figure it out if it's 45 days or 180 days. Judging by no official report filed within 45 days, I assume it's 180 days.

    Gee George, maybe you could clear this up or is the market just so stellar that you can just keep it on cruise control.

  2. .semantics, or playing with " context "...We new from June 14 th this release was a Company in-house up-date from 350,000 meter of drilling which added to the existing 43-101 done in the past. I recall from previous ACA Howe 43-101 mention to follow the american standard vs metric or to atleast standardize there reporting as not to confuse releases. Looking at this up-date we read here { Historically, resources at the Rice Lake Project were estimated using the polygonal method. More recently, with the use of Amine® software, the measured and indicated mineral resource estimate is derived by creating a block model } { The resource block model was estimated utilizing inverse distance squared methodology on a block size of 3 feet x 3 feet x 3 feet ] NOW we switch to metric {

  3. The mineral reserve estimate is based on a 2.7 metre minimum mining width, a tonnage factor of 11.4 cubic feet per ton (SG 2.7 to 2.8), a gold price of US$1,260 per ounce (100% exchange) and a 93% mill recovery.
  4. A 5.14 g/tonne (0.15 ounce/ton) cut-off grade has been applied to deposits accessed from the Rice Lake mine shaft, while a 3.09 g/tonne (0.09 ounce/ton) cut-off grade has been applied to deposits accessed via the Hinge/007 ramp. ) now back to AMS ( Mineral resources were estimated with a block model utilizing inverse distance squared methodology on a block size of 3 feet x 3 feet x 3 feet. } now back to metric ( Assays were capped at 102.9 g/tonne (3.0 ounces/ton) for drill holes and 34.3 g/tonne (1.0 ounce per ton) for chip samples.} Now the icing on the cake {
  5. Inferred mineral resources are not in the current mine plan and therefore do not have demonstrated economic viability.
  6. As per section 4.2(1) J (ii) of National Instrument 43-101, the change in mineral reserves for the Rice Lake Project does not constitute a material change in the affairs of the Company. Refer to the National Instrument 43-101 Technical Report filed on SEDAR, dated October, 2010, by GeoEx Limited. } ............... in other words since this does not refere to mining plan San does not have to conform...PS:...Thinking back to the OSC report on posting 3 and 9 month intervals leaves a investor wondering which way is up and which way is down if news is never material according to the Company..

    3) Inferred Mineral Resource:

    Inferred mineral resources are determined using the polygonal method, yet the MINERAL RESOURCE AND RESERVE ESTIMATE is done by use of Amine® software...Traps7