Welcome To ShaMaran Petroleum Corp

Edit this title from the Fast Facts Section

Free
Message: Current Status of Smoothe Prospect Well Currently Drilling - Dec 15

Current Status of Smoothe Prospect Well Currently Drilling - Dec 15

posted on Dec 15, 2008 06:39PM


REPORT DATEWELL STATUSMEASURED DEPTHTRUE VERT DEPTHDETAIL
12/15/2008 05 16275 MILLED WINDOW 14143-14158'; DRLD 10' NEW FORMATION TO 14168'; WASHED TO 14178'; SLID FM 14178-14194'; SLID & DRLD FM 14194-14632'; STARTED LOSING MUD; ADD LCM INTO SYSTEM; DRLD & SLID TO 14803'; LOST FULL RTRNS; PUMPED LCM SWEEP; CIRC; WELL FLOWING; WEIGHTED UP MUD; CIRC; SHUT IN WELL; OPENED WELL; BULLHEADED 19.0 PPG MUD; PUMPED OUT OF HOLE
Share
New Message
Please login to post a reply