Skip to content
Sign in

Post

Silver Falcon Mining

Treasurer3.0 rating from 6 members327 ptsRate

400 tons/ shift milling

I talked with YI today about how many tons the mill equipment can process per shift. I heard comments similar to what others on this board have posted before. The mill equipment as it will be set up will be able to process 400 dry tons of ROM in one 10 hr. shift. The mill will start out processing 30 t/day as this early phase is to find the exact right settings to maximize AU and Ag returns. When the best parameters have been found, tonnage processed/ 10 hr. shift will go to 400 t/ shift. Two shifts/day (800 t processed/day) may be used when production is fully established.

The 5.1 g/t Au will be the lowest figures we get from the tailings, and PR of high Au and Ag/t already assayed from tailings will be released after the listing is completed , and the mill is up and operating.

Join the conversation about Silver Falcon Mining.

Reply

Replies

  1. I thought I had seen that somewhere before but then it appeared that 100 tons/day was the output. If it turns out to be 400..with a possibiltiy of two shifts at 800 tons/day, say for 250 days/year...that comes to 200,000 tons/year and a that ate the whole 300,000 tons of mine stock would be depleted in a year and a half!

    Are you sure that's realistic? If that were the case, 800 tons/day @ 1 oz/ton would yield $840,000/day (@$1050 gold)....or $210 million/year gross!

    With that kind of cash flow, once full capacity was reached, the easily accessible, high grade veins in the mines could begin to be worked ...plus drilling and exploration of the proximal, promising anomalous targets.

    Okay, what am I mssing here?

    1. The assumption that all tailings will be at 1 oz./t could easily be too large a figure since a portion of the rock in the tailings was from tunnel areas without economical ore (even today).

      The upgrade of milling equipment did make the tonnage/shift jump from 100t to 400t/shift. (see PR of 2-06-09). The milling circuit equipment we own will crush and process 400t ROM ore, either as tailings and/or new ore from the mines, in a 10 hr. shift. Once the milling equipment is calibrated and running at 400t/shift, could a second shift be arranged and started? Yes (see PR of 1-5-09). Pierre has to have (by jan., 09) already seen any number of high Au assays that along with talks with the geologist and mine engineer, convinced him that there was enough high value ore easily available for mining and milling, to warrant going to a double shift plan early on. I think Pierre will be using mined ore from high Au-Ag areas to add to the ROM on an as-can basis. The high Au-Ag ore from WEM mines will probably be sporadic in the mill feed as the geologist and mine engineer sample areas that are already open for extraction.

      Rather than assuming the 1 oz./t for all tailings, I suggest using half the tailings total tonnage as being low value ore (relatively) at 5.1 g./t. Start with .5 oz. Au/t x 800 t/d = 400 oz. Au/d. @ $1050/oz = $420,000./d - COP of $75./t (?) = -$60,000= $360,000./d - $3,000./d as rent to GC = $357,000/d - 15% to GC = $303,000./d as basic profit before taxes. 250 days = $75. mil. profit before taxes to SFMI/y.

      Depending on how many tons of high grade Au-Ag are mined and entered into the mill along with the tailings, the figures get larger for sure in 2010 as the mining starts.

      1. Thanks Ed. That 800 ton/day output is more than significant. I think my mind is straying with all the extraneous macro data and some of the info on other stocks I'm in. One other stock I hold is expecting to fire up an old mill that puts out 100 tons/day. They are way behind SFMI but get this...they have just had a major producer joint venture with them and their stock is doing well. So, we can see the interest out there in small explorers on old properties that still have much more to do to compare to SFMI, and probably never will.

      2. With these numbers:

        $303,000./d as basic profit before taxes. 250 days = $75. mil. profit before taxes to SFMI/y.

        After subracting 35% for taxes (a guess, could be higher), that is $48.75 mil per year. Divide that number by 175 mil shares outstanding (I know it is closer to 150 mil currently but I'm being conservative), we get 27 cents per share earnings.

        Attach a moderate PE to that and we should be trading in the dollar range. Between $2.70 and $5 imo.

        Am I way off here?

        B

        1. B,

          I certainly can't argue with your numbers. The point to be made, I think, is that using any reasonable numbers SFMI is way undervalued. Even if you make extremely conservative assumptions at every step you wind up with multiples of the present share price. This will be obvious once SFMI starts producing, at any rate, and revenues start coming in. This is very different from a lot of startup miners where you have to be very careful with your numbers and calcs just to figure out whether the company has a chance to be profitable at all.

          spiny