Skip to content
Sign in

Post

Silver Falcon Mining

Mail Room1.0 rating from 2 members63 ptsRate

My assessment

Gentlemen~~~Bolting started 1 Nov on the Sinker Tunnel, I believe the bolting will be completed this month. Once bolting is signed off (Mine Safety), then blasting of the safe room and drill room can begin (hopefully permitting has been submitted in advance). Once the waste rock is removed (hopefully we get an assy sample), then and then only will the drill rigs be put in place. If drill rigs are delivered to SFMI now, I would store them at the Mill Site for security reasons and protected from the weather. A meaningfull PR would be nice before Christmas, but facts only on progress. I'm totally comfused on the share price/volume of trades of SFMI, something must be brewing behind closed doors???

Join the conversation about Silver Falcon Mining.

Reply