Skip to content
Sign in

Post

Silverado Gold Mines

Treasurer2.1 rating from 14 members332 ptsRate

Correction?

What, exactly, was the 'correction' that followed the original news release on 11/17? I'm not sure what I'm looking at.

Join the conversation about Silverado Gold Mines.

Reply

Replies

  1. /C O R R E C T I O N from Source -- Silverado Gold Mines Ltd./

    In TO640 transmitted today at 05:00e, incorrect figures appeared in the table summarizing updated mineral resource estimates for the Workman's Bench deposit. Other errors occurred throughout the body of the release. Full corrected and updated copy follows:

    Silverado Announces Updated Mineral Resource Estimates for Workman's Bench Gold and Antimony Deposit at Nolan Creek



        -------------------------------------------------------------------------
    Cut-Off
    Grade Quantity Grade Metal Grade Metal
    Category (% Sb) (ton) (% Sb) (ton Sb) (oz/ton Au) (oz Au)
    -------------------------------------------------------------------------
    'A' Vein -
    Indicated 4.0 28,452 31.52 8,970 0.405 11,520
    -------------------------------------------------------------------------
    'B' Vein -
    Indicated 4.0 8,756 25.63 2,240 0.480 4,210
    -------------------------------------------------------------------------
    'West' Vein -
    Indicated 4.0 5,204 12.80 665 0.302 1,570
    -------------------------------------------------------------------------
    Average
    Grades 4.0 28.00 0.408
    -------------------------------------------------------------------------
    Totals 42,412 11,875 17,300
    -------------------------------------------------------------------------

    Notes:

    - Indicated Mineral Resources which are not mineral reserves do not
    have demonstrated economic viability. The estimate of mineral
    resources may be materially affected by environmental, permitting,
    legal, title, taxation, socio-political, marketing, or other relevant
    issues. A total of 124 mineralized intervals were examined and
    provide sufficient exploration data to define these indicated mineral
    resources.
    - Rounding may result in some discrepancies.
    - No process recovery factors have been applied to these resource
    figures.
    - The unit ton refers to short tons.

    Assumptions and Methods

    Bundtzen included the following steps during calculation of the indicated resources at Workman's Bench:

        -   personal inspection of Workman's Bench lode style gold property
    during 2007-2008;
    - database compilation and data validation;
    - geological interpretation and modeling;
    - compositing assay intervals to a common length;
    - determination of average material density for lode properties;
    - analysis of grade variability;
    - polygonal estimation of grade by compositing of sample assay
    information taken within designated widths and lengths of mineralized
    zones;
    - assignment of appropriate cut off grades, the lowest grade that can
    be mined economically;
    - classification of confidence in the estimates with respect to CIM
    (2005) guidelines, and;
    - mineral resource tabulation and validation of the resource estimate.

    Data Verification

    Original Chart:

    -------------------------------------------------------------------------
    Drill Sample Sample Sample
    Hole Interval Interval Length Au
    Number (From) (To) (ft) (toz/ton) Sb (%)
    -------------------------------------------------------------------------
    08SH25 40.8 41.3 0.5 0.04 1.07
    -------------------------------------------------------------------------
    08SH25 374.8 376.5 1.7 2.86 43.20
    -------------------------------------------------------------------------
    08SH25 376.5 377 0.5 0.21 4.45
    -------------------------------------------------------------------------
    08SH25 378 378.5 0.5 0.07 4.46
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    Drill Sample Sample Sample
    Hole Interval Interval Length Au
    Number (From) (To) (ft) (toz/ton) Sb (%)
    -------------------------------------------------------------------------
    08SH26 334.5 335 0.5 0.26 1.04
    -------------------------------------------------------------------------
    08SH26 337 337.5 0.5 0.07 3.59
    -------------------------------------------------------------------------
    08SH26 340.5 341 0.5 0.03 4.91
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    Drill Sample Sample Sample
    Hole Interval Interval Length Au
    Number (From) (To) (ft) (toz/ton) Sb (%)
    -------------------------------------------------------------------------
    08SH31 272 273.5 1.5 0.09 0.01
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    Drill Sample Sample Sample
    Hole Interval Interval Length Au
    Number (From) (To) (ft) (toz/ton) Sb (%)
    -------------------------------------------------------------------------
    08SH32 167 167.5 0.5 0.02 1.64
    -------------------------------------------------------------------------
    08SH32 167.5 168.5 1 0.06 1.37
    -------------------------------------------------------------------------
    08SH32 171.5 172 0.5 0.18 21.24
    -------------------------------------------------------------------------
    08SH32 172 172.8 0.8 0.03 8.02
    -------------------------------------------------------------------------
    08SH32 172.8 174.8 2 0.10 0.32
    -------------------------------------------------------------------------
    08SH32 176 177.5 1.5 0.06 12.62
    -------------------------------------------------------------------------
    08SH32 183 184 1 0.05 1.26
    -------------------------------------------------------------------------
    08SH32 186.5 187.5 1 0.01 1.22
    -------------------------------------------------------------------------
    08SH32 187.5 188 0.5 0.55 0.01
    -------------------------------------------------------------------------
    08SH32 203.7 205.7 2 0.09 1.94
    -------------------------------------------------------------------------
    08SH32 205.7 206.5 0.8 1.13 38.74
    -------------------------------------------------------------------------
    08SH32 206.5 209.5 3 0.06 2.22
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    Drill Sample Sample Sample
    Hole Interval Interval Length Au
    Number (From) (To) (ft) (toz/ton) Sb (%)
    -------------------------------------------------------------------------
    08SH33 162 167 5 0.04 2.70
    -------------------------------------------------------------------------
    08SH33 242 242.6 0.6 0.04 19.38
    -------------------------------------------------------------------------
    08SH33 242.6 243.2 0.6 0.02 4.87
    -------------------------------------------------------------------------