Skip to content
Sign in

Post

StrikePoint Gold

VEEP3.0 rating from 37 members2.1K ptsRate

SGR MMU

Traps, I've held Marum just as long as San Gold and know neither will disappoint. I am very patient and will be rewarded and when that day comes we will tip a few at Grumblers. It won't be long.

Join the conversation about StrikePoint Gold.

Reply

Replies

  1. 1739 Louis-Joseph de La Verendrye (the youngest son of the explorer) sent to examine minerals at Red Cliff, south shore of Black Island.
    1800s Salt produced by men of the Hudson’s Bay Company and Northwest Company to supply the Red River settlement.

    Limestone mining industry had its beginnings during the early days of the Red River settlements.

    Salt was produced until 1874 by boiling water from brine springs found on the west side of Lake Manitoba and Lake Winnipegosis.

    1812 Mention of magnetite at narrows of Knee Lake.
    1818 James Monkman manufactured salt for local demands from the brine springs (Monkman’s Springs), Red Deer Peninsula, southern part of Lake Winnipegosis. His sons produced more extensively in the 1850s.
    1832 First recorded use of Tyndall ® Stone (mottled dolomitic limestone) used to build Lower Fort Garry.
    1850 Little Stony Mountain Quarry, Winnipeg, burning lime.
    1855 Little Stony Mountain Quarry, Winnipeg, production of lime ceased.
    1857 Discovery of coal, Souris River.
    1870 Province of Manitoba enters Confederation.
    1874 Monkman's Salt Works stopped producing salt from the brine springs (Monkman’s Springs), Red Deer Peninsula, southern part of Lake Winnipegosis.
    1880s Quarrying begun at Stonewall.
    1883 First lignite produced, Lennox mine, Turtle Mountain area.
    1885 Dock built at Red Cliff and 5.4 tonnes of hematite shipped by sailboat to Winnipeg and by rail to Chicago where a car wheel was cast.

    First mining of coal, Vadon mine, Turtle Mountain field, and continued intermittently at McArthur, McKay and Manitoba coal companies until 1908.

    1889 Resolution of the boundary dispute between Manitoba and Ontario.
    1890 Discovery of gold, Falcon Lake.
    1895 William Garson opened the first commercial quarry in the province, in the Garson district.
    1898 Production of crushed stone for road building and of stone curbing was begun, at Little Stony Mountain Quarry (City Quarry), Winnipeg.

    John Gunn opened a limestone quarry at Garson.

    back to top

    1900-1920s

    1900 Little Stony Mountain Quarry Co. Egan's Quarry, Winnipeg, began production.
    1900 Quarrying began, Stony Mountain by John Gunn and Sons.
    1901 First development of gypsum deposits in Manitoba, Manitoba Union Mining Company, Portage Bay (Gypsumville).
    1904 Operations ceased at Egan's Quarry, Winnipeg.
    1905 Operations ceased at Little Stony Mountain Quarry. The City of Winnipeg purchased a quarry at Stony Mountain and moved entire plant.

    City of Winnipeg, Manitoba Construction Company began quarrying, Stony Mountain.

    1910 Quarrying at Elephant Hill near Gypsumville began.
    1911 Staking of the San Antonio gold claims, Big Rice Lake.
    1913 First gold bar produced in Manitoba, Penniac Reef Gold Mine.
    1914 Discovery of copper-zinc at Flin Flon.

    Discovery of gold at Herb (Wekusko) Lake.

    1915 Discovery of the Mandy mine copper orebody, Schist Lake.

    Staking of the Flin Flon orebody, Flin Flon.

    Discovery of the Rex mine, Wekusko Lake showings.

    1916 Production begins, Mandy mine, Schist Lake.
    1917 Gold ore was the province’s first recorded metal shipment at Herb (Wekusko) Lake.
    1919 Gold Pan Mines Limited, started production at Gold Pan and Gold Seal (mine), Gold Lake.
    1920 Closing of Mandy mine.

    Discovery of copper-nickel deposits at Oiseau (Bird) River.

    Shaft sinking at Flin Flon.

    The Legislative Building formerly opened on July 15, 1920, the 50th anniversary of Manitoba's entry into Confederation. The building is constructed of Manitoba Tyndall ® Stone.

    1921 Gold Pan Mines Limited, stopped production at Gold Pan and Gold Seal (mine), Gold Lake.
    1922 Discovery of Sherridon Mines orebody.
    1923 Staking of the Sherritt-Gordon orebody.

    Mining begins, Onondaga mine.

    Lake Superior Metals Company Limited, started production at Gold Pan and Gold Seal (mine), Gold Lake.

    1924 Discovery of lithium ore, Pointe du Bois.

    Discovery of Central Manitoba-Kitchener orebody, Long Lake.

    Rex mine, Wekusko Lake, production $150,000 in gold to 1925.

    Lake Superior Metals Company Limited, stopped production at Gold Pan and Gold Seal (mine), Gold Lake.

    1925 Discovery of gold near Gem and Slate lakes.

    Gull (property) produced Molybden.

    1927 Development begins, San Antonio mine, Bissett.

    Mining begins at Flin Flon.

    North Star Oil builds first crude oil refinery in Manitoba.

    Production begins, Central Manitoba mine, Long Lake.

    1928 Completion of rail line to Flin Flon from The Pas.

    Construction of concentrator, copper smelter, and zinc plant begins at Flin Flon.

    Shaft sinking at Sherridon mine.

    Development begins, Oro Grande mine, Beresford Lake.

    Manitoba Department of Mines and Natural Resources established.

    Shaft sinking at Gem Lake mine.

    Mining resumes, Mandy mine, Schist Lake.

    R.M. of Rockwood begins quarrying, Stony Mountain.

    1929 Development of Amaranth gypsum deposits, Western Gypsum Products Ltd..

    back to top

    1930s-1950s

    1930 Start-up of Hudson Bay Mining & Smelting concentration plant and smelter.

    Manitoba, Saskatchewan and Alberta assume control over their natural resources.

    First production of refined zinc and blister copper, Flin Flon.

    1931 Discovery of gold, Island Lake.

    Production begins, Sherritt-Gordon mill, Sherridon.

    Gold produced at Herb (Wekusko) Lake.

    Deloraine Coal Company/Turtle Mountain Coal Mines, produced 600 tons of lignite near old McArthur mine.

    1932 Production begins, San Antonio gold mine.

    Suspension of milling, Sherritt-Gordon mill, Sherridon.

    First commercial production of salt, Neepawa Salt Ltd. from concentrated brines in a deep well, Neepawa.

    Discovery of gold, God’s Lake.

    Milling begins, Gem Lake mine and Cryderman mine, Wallace Lake.

    1933 Production begins, Vanson gold mine, Rice Lake.

    Production begins, Grand Central gold mine, Wanipigow Lake.

    Milling begins, San Antonio mine, Rice Lake.

    Discovery of gold, Beresford Lake (later Gunnar Gold Mines).

    Milling begins, Solo-Oro Grande mine, Beresford Lake.

    1934 Shaft sinking at Gunnar gold mine.

    Resumption of mining at Rex (Laguna) mine, Wekusko Lake.

    Operations of Solo-Oro Grande mine, Beresford Lake suspended.

    Operations resume at Rex mine, Wekusko Lake and Gem Lake mine.

    Shaft sinking at Gabrielle mine.

    Production begins, Island Lake mine.

    1935 Discovery of Dickstone No. 1 surface showing.

    Mining begins, Johnston Knee Lake mine.

    Shaft begun Jowsey Island mine.

    Discovery of gold, Echimanish River.

    Milling begins, God’s Lake mine.

    Suspension of milling, Island Lake mine.

    Suspension of mining, Johnston Knee Lake mine.

    Canadian Industries Ltd. purchased Neepawa Salt Ltd.

    First production of tellurium and selenium at Flin Flon.

    1936 Shaft sinking at Gold Lake and Packsack mines, Red Rice Lake.

    Resumption of mining, Solo-Oro Grande mine, Beresford Lake.

    Production begins, Gunnar gold mine, Wallace Lake.

    Suspension of mining, Jowsey Island mine.

    Discovery of copper near Morton Lake.

    Production resumes, Rex mine, Wekusko Lake.

    First production of cadmium, Hudson Bay Mining and Smelting Company, Flin Flon.

    back to top

    1937 Mining begins, Cranberry Portage mine.

    Suspension of mining, Gem Lake mine.

    Production begins, Gurney gold mine, Cranberry Portage.

    Production resumes, Sherritt-Gordon mill, Sherridon.

    Suspension of operations, Central Manitoba mines, Long Lake.

    First commercial shipment of lithium in Canada from Manitoba, Lithium Corporation of Canada, Bernic Lake.

    1938 Resumption of production, Solo-Oro Grande mine, Beresford Lake.

    Shaft sinking at Sunbeam mine, Star Lake.

    1939 Closing of Gurney mine.

    Operations suspended, Rex mine, Herb Lake and Gurney mines, Cranberry Portage.

    1940 Operations cease, Oro Grande mine, Beresford Lake.
    1941 New plant erected by Canadian Industries Ltd., producing salt by the vacuum pan evaporation process, Neepawa.

    Discovery of copper-nickel orebody, Lynn Lake.

    1942 Closing of Gunnar Gold mine, Wallace Lake.

    Discovery of chromite deposits, Bird River.

    Shipments of gold ore from Ogama-Rockland mine, Long Lake to Gunnar mill, Wallace Lake.

    Production of concentrates, Sherritt-Gordon mine, Sherridon.

    Century Gold Mine, Elbow Lake, poured a gold bar and ceased operation shortly after.

    1943 Magnetometer survey discloses four anomalies under Lynn Lake.

    Emergency Metals re-opens Mandy mine, Schist Lake.

    Closing of God’s Lake mine.

    1944 Closing of Mandy mine, Schist Lake.
    1945 Staking of Lynn Lake orebody, Sherritt Gordon Mines.
    1946 Sherritt-Gordon discovers nickel-copper in drill core, Granville Lake.

    Exploratory drilling of nickel-copper deposits, Lynn Lake.

    1947 Construction of mill, Cuprus mine, Flin Flon area.

    Discovery of Schist Lake deposit and shaft sinking, Flin Flon.

    Construction begins on the Snow Lake Mining road from Wekusko, and on the Hudson Bay Railway, to Snow Lake.

    1948 Milling begins at Ogama-Rockland mine, Long Lake.

    Production begins, Jeep gold mine, Wallace Lake.

    Cuprus mine, Flin Flon area in production.

    Sherritt-Gordon Mines sinks shaft at Lynn Lake.

    1949 Development of Schist Lake copper-zinc mine, Flin Flon.

    Discovery of North Star deposit, through geophysics.

    Development of scintillation counter prospecting method, University of Manitoba, Winnipeg.

    Production begins, Nor-Acme gold mine, Snow Lake.

    1950 Production ends, Jeep gold mine, Wallace Lake.

    Construction of oil pipelines from Gretna to Winnipeg.

    1951 Ore exhausted at Sherritt Gordon’s Sherridon mine, production ends. The concentrator, mining plant, homes, and other worthwhile portable property were moved by tractor train to Lynn Lake, a distance of 160 km to the north.

    Production begins, zinc fuming and zinc oxide treatment plant, Flin Flon.

    Discovery of Don Jon orebody, Flin Flon through geophysics.

    All mining and milling completed at Ogama-Rockland mine, Long Lake.

    First commercial oil well in the Williston Basin, the “California Standard Daly,” near Virden, Manitoba. This marked the discovery of Manitoba’s first major field, the Daly Field.

    1952 Discovery of Tilston, Waskada, and Lulu Lake, Coulter oil fields.

    Development of Sherritt Gordon nickel-copper deposits at Lynn Lake.

    1953 Exploration of nickel deposits, Mystery Lake.

    Underground exploration at Birch Lake Copper and Coronation properties, Flin Flon.

    Discovery of Roselea oil field, Virden.

    Production begins, Sherritt Gordon’s Lynn Lake "A" mine.

    Completion of railway to Lynn Lake.

    Milling begins, Lynn Lake.

    Discoveries of Virden and Whitewater oil fields.

    1954 Discovery of nickel-copper orebodies at Moak Lake.

    Production begins, EL mine, Lynn Lake.

    Closing of Cuprus mine, Flin Flon area.

    Production begins, Schist Lake mine.

    Discovery of Pierson oil field.

    1955 Production begins, Don Jon and North Star, Flin Flon mines.

    Production begins Forty-Four Mines gold mine, Rice Lake district.

    Discovery of West Butler, Regent oil field.

    1956 Discovery of Chisel Lake, Ghost Lake and Stall Lake orebodies, through geophysics.

    Shaft sinking begins, Moak Lake.

    Announcement of Thompson project by Inco and Province of Manitoba.

    Mafeking limestone quarries began producing.

    1957 Production begins, Birch Lake-Saskatchewan mine.

    Closing of Don Jon mine, Flin Flon.

    Discovery of Kirkella oil field.

    1958 Production begins, Tanco mine, Bernic Lake.

    Closing of North Star mine, Flin Flon.

    Closing of Nor-Acme gold mine, Snow Lake.

    Discovery of Jungle Lake copper-zinc orebody.

    1959 Discovery of Rod No. 1 orebody, Little Stall Lake.

    back to top

    1960s-1970s

    1960 Closing of Birch Lake-Saskatchewan mine.

    Completion of railroad from Chisel Lake to Optic Lake.

    Production begins, Chisel Lake mine, Snow Lake.

    Blowing in of Inco’s smelter, Thompson.

    1961 Airborne geophysical survey results in discovery of Fox mine orebody.

    Operations begin, International Nickel mining and refining complex, Thompson.

    1962 Discovery of Souris-Hartney oil field.

    Waterflooding initiated in Virden oil field.

    Production begins, Rod No. 1 mine, Little Stall Lake.

    Discovery of Wim deposit, Snow Lake area.

    1963 Discovery of the Birchtree deposit, Thompson.

    Discovery of the Anderson Lake deposit, Snow Lake.

    Discovery of the Manibridge orebody, Waboden.

    Production complete El mine, Lynn Lake

    Production stopped at Forty-Four Mines, Rice Lake area.

    Western Gypsum Products Ltd., Amaranth mine closed.

    1964 Closing of the Rod No. 1 mine, Little Stall Lake.

    Opening of Stall Lake mine, Snow Lake.

    Gypsum mining started near Silver Plains.

    Development of the Birchtree mine.

    1965 Discovery of the Rod No. 2 orebody, Little Stall Lake.

    Development of the Soab mines, Thompson.

    1966 First exploratory drilling for oil on on-shore area of Hudson Bay.
    1967 Commercial quarrying ceased at Stonewall with the depletion of the high quality reserves.

    Discovery of new Mississippian pool at Waskada oil field.

    Opening of Bernic Lake tantalum mine, Lac du Bonnet.

    Completion of railroad from Osborne Lake mine to Stall Lake mine.

    New Gypsum mine opened at Amaranth.

    1968 Completion of railroad from Pipe Lake to Thompson.

    Closing of the San Antonio mine, Bissett.

    Production begins, Osborne Lake mine.

    Dryden Chemicals Limited began processing salt east of Brandon, Canadian Occidental Petroleum Ltd. purchased the plant and continued operations under the name of Hooker Chemicals Canada. Brines were pumped from two wells until they were abandoned in 1978.

    1969 Drilling of first offshore well in Hudson Bay (a dry hole).

    Discoveries of Reed Lake and Centennial copper deposits.

    Production begins, Birchtree mine, Thompson.

    Opening of Flexar mine, Creighton, SK, ore shipped to Flin Flon for treatment.

    Opening of Dumbarton mine, Bernic Lake.

    Development of Pipe Nos. 1 and 2 open pits, Thompson.

    Bernic Lake, Tantalum mine began producing.

    Discovery of the Ruttan orebody, Leaf Rapids.

    Operations ceased at Garson Quarry.

    1970 Production begins, Anderson Lake mine, Snow Lake.

    Production begins, Fox copper-zinc mine, Lynn Lake.

    Production begins, Dickstone mine, Beavertail Lake.

    Canadian Salt Limited plant, Neepawa closed.

    Production begins, Pipe No. 1 open pit, Thompson.

    Gypsum mine closed, Amaranth.

    1971 Production begins, Manibridge mine, Wabowden.

    Production ceased at Soab North and Soab South mines, Thompson.

    1972 Production begins, White Lake mine.

    Production begins, Ghost mine.

    Closing of Flexar, Saskatchewan mine.

    1973 Production begins, Ruttan mine, Leaf Rapids.
    1974 Closing of Dumbarton mine, Bernic Lake.

    Production from Maskwa open pit.

    1975 Closing of Dickstone mine, Beavertail Lake.

    Silver Plains gypsum mine closed due to flooding of the shaft.

    Closing of Maskwa mine, Bird Lake.

    1976 Closing of Schist Lake and Lynn Lake mines.

    Operations suspended at White Lake to allow deepening of shaft.

    1977 Closing of Manibridge mine, Wabowden.

    Suspension of mining, Birchtree, Thompson.

    Centennial, Athapapuskow Lake, in production.

    Gypsum Quarry opened at Amaranth.

    1978 Production begins, Westarm mine, Schist Lake.

    Resumption of mining, White Lake mine.

    Production begins, Lost Lake mine.

    Development begins, Spruce Point mine.

    Hooker Chemicals Canada abandoned salt brine wells near Brandon.

    Bison Rock Products Ltd., begins quarrying, Stony Mountain.

    Quarrying at Gypsumville, Elephant Hill quarry ceased.

    1979 Centennial mine, Athapapuskow Lake closes because of bulkhead failure.

    back to top

    1980s-present

    1980 Resumption of production, Centennial mine, Athapapuskow Lake.

    Successful recompletion of a producing well in Waskada Field. This was the first production recorded in Canada from the Jurassic Amaranth, or Spearfish, formation. This triggered Manitoba’s second oil boom.

    1982 Production begins, Trout Lake mine, Flin Flon.

    Suspension of mining, Bernic Lake tantalum mine.

    Milling begins, San Antonio mine, Rice Lake.

    Production begins, Spruce Point and Lotus mines.

    Closing of White Lake mine.

    Closing of Lotus mine.

    Discovery of Mountainside oil field.

    1983 Osborne Lake mine ceased production.

    Suspension of operations at Centennial, Athapapuskow Lake and San Antonio, Bissett mines.

    1984 Closing of Osborne Lake mine.

    Production begins, Rod mine, Snow Lake area.

    Discovery of Namew Lake orebody.

    Production ends, Pipe Mine, Thompson.

    Waskada Gas Plant begins operations.

    Mining of spodumene begins, Bernic Lake tantalum mine.

    1985 Discovery of oil in the Mississippian Bakken formation.

    Westarm, Schist Lake closed to allow further exploration.

    Resumption of mining, Centennial mine, Athapapuskow Lake.

    Closing of Fox mine, Lynn Lake.

    1986 Milling of spodumene begins, Bernic Lake mine.

    Production begins, INCO Ltd.’s Thompson open pit North mine, Thompson.

    Production begins, MacLellan mine, Lynn Lake.

    Commercial quarrying ceased at Gypsumville and Amaranth.

    1987 Production begins, Tartan Lake mine.

    Production begins, Puffy Lake mine.

    1988 Resumption of production, Tanco mine, Bernic Lake.

    Closing of Ghost Lake mine.

    Closing of Anderson Lake mine.

    Closing of Centennial mine, Athapapuskow Lake.

    Opening of Namew Lake nickel-copper mine, south of Flin Flon.

    1989 Opening of Chisel Lake open pit mine, Snow Lake.

    Puffy Lake operations suspended.

    Resumption of production, Birchtree mine, Thompson.

    Suspension of operations, Tartan Lake gold mine, Flin Flon.

    Closing of MacLellan mine, Lynn Lake.

    1990 Production begins, Callinan mine, Flin Flon area.

    Production begins Thompson South open-pit mine, Thompson.

    Domtar's quarry (old), Gypsumville ceased operations.

    Production began at Harcus Quarry, Amaranth area.

    1991 Closing of the Rod copper-zinc mine, Snow Lake area.
    1992 Closing of Spruce Point copper-zinc mine, Reed Lake.

    Bison Rock Products Ltd., ceases quarrying, Stony Mountain.

    1993 Discovery of oil in the Jurassic Melita formation, St. Lazare.

    Inco's open pits North and South mines mining completed.

    Closing of Namew Lake nickel-copper mine, Flin Flon area.

    Opening of Burnt Timber (BT Keystone) gold mine, Lynn Lake.

    1994 Mining begins, 1-D mine, Thompson.

    Westarm mine, Schist Lake re-opened.

    Closing of Stall Lake mine, Snow Lake.

    Closing of Chisel Lake mine, Snow Lake.

    1995 Opening of Photo Lake copper-zinc mine, Snow Lake.

    Re-opening of New Britannia gold mine (formerly Nor-Acme mine), Snow Lake.

    1996 Opening of Farley Lake gold mine, Lynn Lake area.

    Opening of the Keystone gold mine, Lynn Lake.

    Closing of BT (Keystone Joint Venture) gold mine, Lynn Lake area.

    Discovery of Bird Tail oil field.

    1997 Re-opening of Bissett (formerly San Antonio) gold mine (mining was suspended later that year).

    Closing of Westarm zinc-copper mine, Flin Flon area.

    1998 (Re)-opening of Harmony gold mine, Bissett (formerly San Antonio).

    Closing of the Photo Lake copper-zinc-gold-silver mine, Snow Lake area.

    1999 Suspension of operations, INCO, Thompson (subsequently resumed).
    2000 Farley Lake mine shut down.

    Closing of Keystone gold mine, Lynn Lake.

    Opening of Chisel North zinc mine, Snow Lake.

    Deepening begins, INCO LTD.'s Birchtree mine, Thompson.

    2001 Suspension of production, Bissett gold mine.
    2002 Closing of Ruttan copper-zinc mine, Leaf Rapids (it opened in 1973).

    Completion of expansion, Birchtree nickel-copper mine, Thompson.

    The Mines and Minerals Act amended to change the confidentiality period for assessment reports (reports of work submitted by exploration companies).

    2004 Operations suspended at the New Britannia mine, Snow Lake.

    Hudson Bay Mining and Smelting, 777 mine project completed, Flin Flon.

    Anglo American sold Hudson Bay Mining and Smelting to OntZinc Corporation, which changed its name to HudBay Minerals.

    Discovery of Sinclair oil field.

    2005 Approximately 3000 previously unavailable reports of work submitted by exploration companies were released to the public domain.

    There are approximately 1,863 producing wells in Manitoba, 15 designated oil fields and 166 oil pools in southwest Manitoba.

    2006 San Gold Corp, Bissett in production at 2 mines, Rice Lake mine (formerly Harmony gold mine) and San Gold No. 1 mine.
    2008
    Many companies continue to operate quarries throughout the Province. For more information, contact the Mining Recording Office, by email [email protected] or telephone 1-800-223-5215.

    For an overview of current mineral exploration in the province view the Manitoba Exploration Activity Tracker.

    Visit the Petroleum web site to learn more about the Manitoba petroleum industry





    http://www.gov.mb.ca/stem/mrd/min-ed...



    1. Private Placement Completed
      December 30, 2004 - The TSX Venture Exchange has informed the Company that it has accepted for filing documentation with respect to a non-brokered private placement subject to the issue of this press release. 555,000 units of the company were issued at a price of $0.10 per unit, for gross proceeds of $55,500. Each unit consists of one common share, restricted from trading until April 30, 2005, and one non-transferable share purchase warrant that can be exercised at $0.10 per share until December 30, 2006. The 550,000 Company shares issued under the terms of the placement are flow-through common shares issued to two placees that are insiders of the Company.


      Four Additional Properties Acquired in Rice Lake Gold Belt, Manitoba
      October 8, 2004 - Marum Resources (TSXV- “MMU”) is pleased to announce that it has acquired four more properties in Manitoba's Rice Lake gold belt. The Company now holds nine properties along the belt, representing a diverse and strategic land position in an under-explored gold belt located only a few hours drive from Winnipeg.
      The Company has purchased a 100% interest in the Aaron group (4 claims), the Sarah group (2 claims), the Contact group (2 claims) and the Bonanza group (2 claims) from a prospector for a $30,000 cash payment, which has been paid, subject to a 2% Royalty, one percentage point of which can be purchased by Marum for $1,000,000.
      The four newly acquired claim groups extend along the southeastern portion of the Rice Lake Belt in an area with demonstrated surface gold showings, high-grade gold in drill intercepts on adjoining properties and extremely prospective geology that includes gold accommodation zones consisting of rocks that contain altered quartz-carbonate veins.
      Marum now controls a total of 13,700 hectares (34,900 acres) of land in the Rice Lake Belt.
      Exploration is now underway on the Strike Point, Beresford Lake and Gem properties. Initial mapping and prospecting will be conducted on the four new properties in the next few months. Drill targets on the Strike Point and Goldridge properties are being prioritized for autumn and winter drill programs.
      Exploration Update - $200,000 Financing
      July 6, 2004 - The Company is pleased to announce that surface exploration has commenced on its Beresford Lake property at the eastern end of the Rice Lake Gold Belt. The Beresford Lake property lies adjacent to the Solo and Oro Grande mines that produced high grade ore in the 1930's. To the west of the Oro Grande lies a property that is being extensively drilled by Place Dome. The highest priority on the Beresford Lake property is the "Mellow Yellow" showing; a 300 m by 1 Km area of high geochemical values hosted by a 25 m thick gabbro unit. Grab samples from surface showings have returned gold values up to 43.5 and 77.4 g/t gold. The objective of the surface mapping is to spot drill targets on a property that contains mineralized outcrops.
      The Company is also pleased to announce that it has staked two additional claims, Green 1 and Green 2. This concludes the Beresford Lake staking program. The property now consists of three Blue Ace Claims, five Red claims and two Green claims. The property now covers rocks and surface gold showings that the Manitoba Geological Survey describes as being …“substantially similar to those that host high-grade gold mineralization in the Red Lake gold camp of Ontario.”
      Subject to regulatory acceptance, Marum Resources Inc. will proceed with a private placement in the amount of up to 2,000,000 units of the company at a price of $0.10 per unit, for gross proceeds of up to $200,000. Each unit consists of one common share and one non-transferable share purchase warrant. One warrant and $0.10 will entitle the placee to acquire one additional common share of the company for a period of two years. Up to 100% of the units may be designated as flow-through units. Insiders of the Company may take up to 75% of this financing. No Finders Fee shall be payable on any amounts subscribed. The proceeds from the private placement will be used to explore the company's mineral properties.
      Exploration update - Fourth Rice Lake property acquired
      April 23, 2004 - The Company reports on the progress of its Rice Lake Gold Belt properties, Manitoba.
      Strike Point Property
      Samples from reconnaissance holes BST3, BST5, BST6, BST8, BST9 and BST10, drilled in the vicinity of the Luana and Vanson shafts contained considerable hydrothermal alteration and narrow gold intercepts up to 0.8 gm/t gold. These results together with the results from holes BST1, BST2, BST4 and BST6, described in our Press Release of March 8 2004, conclude the initial 10-hole, 640 metre (approximately 64 metres per hole) Strike Point orientation drill program. Three follow-up summer drill programs are under consideration. One will continue to trace the north-westerly strike extension of the Rice Lake Gold Mine alteration and mineralization onto the Strike Point property. Secondly, more exploration is justified in the Vanson shaft area where a wide range of volcanic rock types with brittle-ductile contrast, late felsic dikes, shearing, widespread hydrothermal alteration and two 0.5 metre intercepts up to 2.8 gm/t gold were cut. The third program will be near the Luana mine shaft. The Luana area contains a wide shear zone with extensive silicification and anomalous gold values. This is an excellent looking structure to explore along strike, and there is some topographic indication of a cross structure between holes BST-6 and BST-10 to the east, so the zone could be offset or folded. As well, assays of 3.1 gm/t gold over 0.42m and 3.1 gm/t gold over 0.40m near the bottom of BST-6 suggest the possibility of a parallel zone to the southwest hidden under overburden in that area. A more extensive, deep-hole drill program will be undertaken in the Luana target area following spring break-up.
      Goldridge Property
      The Goldridge Property (surrounding the recently acquired Huron Property), as initially described in our Press Release of March 8 2004, has been expanded from nine claims to 18 claims to cover a 12 km strike length of the regional Wanipigow fault, with ultramafic intrusions, cross structures, splay faults and late dike systems, all important features in this gold exploration environment. A limited 6-hole, 240 metre reconnaissance drill program (approximately 40 metres per hole) was carried out on the Huron property to test for downward continuation of surface showings that have yielded grab samples containing up to 1.63 oz/ton gold (55.9 gms/t gold. The target consists of a granodiorite-hosted shear zone that contains vein structures up to 2 metres thick. A strong gold-chalcopyrite association has been observed in the reconnaissance drill program, with individual short intercepts containing up to 1.3 gms/t gold. Several deep holes will be drilled into the Huron area as part of the overall 2004 Goldridge exploration program.
      Gem Property
      Six claims (100% interest) have been staked to the south of Garner Lake at the extreme southeastern end of the Rice Lake gold belt. The claims cover prospective gold lithologies that are so far unexplored. A summer prospecting and geochemisty program is scheduled.
      Beresford Lake Property
      The Beresford Lake property now comprises 8 claims that cover a very promising package of sediments, iron formation, mafic volcanics, komatiites and peridotite, with extensive shearing, alteration and several surface gold showings. One part of the property covers possible extensions to the nearby Gunnar mine structure. The Gunnar Mine operated from 1936 to 1942 and produced 101,400 ounces at an average grade of 0.34 oz/ton (11.7 gms/t gold). The company has been conducting limited winter prospecting operations. Extensive prospecting and ground geochemistry sampling is scheduled for the summer in preparation for a drill program. The highest priority is the “Mellow Yellow” showing, a 300 m by 1 Km area of high geochemical gold values hosted in a 25m thick sheared gabbro unit. Grab samples from surface showings have returned gold values up to 43.5 and 77.4 g/t gold.
      Rice Lake Exploration Strategy
      The staking of the Gem property completes Marum's land acquisition program in the Rice Lake gold belt. The company now has four strategically placed gold properties with excellent exploration potential. Marum has proceeded to explore the Rice Lake belt by immediately drilling short exploratory holes to define drill targets by stratigraphy, rock alteration and by gold content. This technique has proved to be extremely successful and cost effective. The Company is currently planning a comprehensive summer exploration program in the Rice Lake gold belt.
      Overall Rice Lake Gold Belt Exploration Activity
      In addition to the re-awakening of the Rice Lake gold mine located in the town of Bissett and adjacent to Marum's Strike Point property, there are four major exploration programs now underway along the Rice Lake gold belt. San Gold Resources (SGR-TSXV) and Gold City Industries (CG-TSXV) are currently drilling on the San Gold No. 1 property 3 Kms to the east of the Rice Lake mine in order to further outline gold mineralization that extends along a 15 Km strike length to the east of the mine as outlined during prior drill programs. Gossan Resources (GSS-TSXV) has recently announced a 1,000-metre drill program on the Angelina property that is located 3Kms to the northwest of Marum's Beresford Lake property. Mid-North Resources (MNU-TSXV) have just announced the imminent commencement of a 3,500 metre drill program to be undertaken by Placer Dome (PDG-TSX) under the terms of an option agreement between Placer and Mid-North. The Mid-North property includes the Central Manitoba mine property that produced 137,817 ounces of gold at an average grade of 0.36 ounces per ton gold between 1927 and 1937. The Rice Lake gold belt has produced 1.7 million ounces of gold. It remains under-explored and is now receiving the level of exploration that is warranted by its many surface showings and recent drilling successes.


      Exploration update and new property acquisition
      in Rice Lake Gold Belt, Manitoba
      March 8, 2004 - The Company reports on the progress of its Rice Lake Gold Belt properties.
      Strike Point Property
      Drilling operations on a 640 metre, 10-hole reconnaissance drill program have been completed on Marum's Strike Point gold property, located adjacent to Harmony Gold's Bissett Mine in Manitoba. Core logging, sawing and sampling work is anticipated to be completed by March 15th. The objective of the short-hole drilling is to discover gold mineralization, intercept gold pathfinder alteration and to evaluate the stratigraphic and structural orientations of the host rocks in advance of a more comprehensive fully-targeted drill program. All holes were drilled at minus 45 to 60 degrees into structures projected from surface information. Summary results from four of the ten short drill holes are described in this exploration update. A detailed summary of all drill holes will be disclosed when the program is completed and all assay results have been received.
      Hole BST1, a wildcat orientation hole, was drilled under a topographic lineament to investigate the stratigraphic position of a westward extension of the mineralized zone that occurs on Harmony's Bissett Mine property. The 100-metre deep hole intercepted a 43-metre zone of altered rock that is interpreted as being stratigraphically 150-metres above the target horizon. Using this accurate stratigraphic fix, the next drill program will provide for holes to intercept the projected westward extension of the Bissett mine property mineralization. No economic concentrations of gold were encountered in the hole.
      Holes BST2 (71 metres total depth) and BST4 (72 metres total depth), were drilled near the Vanson shaft that was sunk to a depth of over 500 feet in the 1930's. Both holes encountered sheared volcanic rock, serpentine-chlorite-carbonate alteration and zones of quartz veining containing lightly disseminated sulphide minerals. No economic concentrations of gold were encountered. Two narrow intersections, approximately one-half metre in thickness, contained gold values of approximately 3 gms/tonne. Assay results from Hole BST3 and BST5, also drilled in the vicinity of the Vanson shaft have not yet been received.
      Hole BST6 (48.3 metres total depth) was drilled near the Luana shaft that was sunk in the 1920's. The hole contains sheared altered volcanic rocks, sheared altered schists and relatively abundant quartz veining. All of the rocks contain lightly disseminated sulphide minerals. No economic concentrations of gold were encountered. Two narrow intersections near the bottom of the hole, each approximately 0.4 metres in thickness, contained gold values of 3.05 and 3.15 gms/t Au respectively. These end-of-hole results suggest the boundary of a mineralized zone in the footwall and their presence will be factored into the next drill program. Assay results from BST7 have not yet been received. Samples from holes BST8, BST9 and BST10, also drilled in the vicinity of the Luana shaft, are in various stages of preparation.
      Based on the information obtained from the orientation drill program results acquired to date, The Company has scheduled a more extensive, deeper hole drill program in the Luana target area
      Gold assays and ICP multi-element analyses are performed in accordance with accepted industry standards by Accurassay Laboratories of Thunder Bay, Ontario. William C. Hood, P.Geo, is the qualified person, under the meaning of National Instrument 43-101, and has reviewed the data acquired on the Strike Point property.
      Beresford Lake Property
      The Beresford Lake property has been significantly expanded and now comprises eight recorded claims. The company has been conducting winter prospecting operations and has recently staked several additional claims.
      Goldridge Property
      Marum has purchased, for a cash payment of $22,000 and a production royalty of 1 ½%, a 100% interest in the Goldridge property from a prospector. The Goldridge property consists of nine claims and is located approximately 7 Kms west of Marum's Strike Point property. Marum has acquired additional claims adjacent to the Goldridge property that are also subject to 1 ½% production royalty to the prospector. The acquisition of the Goldridge property represents a significant addition to Marum's presence in the Rice Lake Gold Belt. The property includes a large, unexplored, brittle deformation zone that contains ductile ultramafic bodies, a combination of rock types that is receptive for gold concentration. Exploration of the Goldridge property will commence shortly and will include surface geophysics and drilling.
      Rice Lake Exploration Strategy
      Since its initial property acquisition in the Rice Lake Belt three months ago, Marum has established a strategic land position covering 9,135 hectares. Marum's three Rice Lake properties include four gold targets environments, including three areas that contain classical “Red Lake” brittle-ductile rock packages that are host to the major gold deposits of the Red Lake area to the east. The February orientation drill program has generated positive information and the Company has scheduled a deep-hole drill program before the onset of spring breakup.


      Drilling commences at Strike Point gold project, Manitoba
      January 23, 2004 - A 600 metre, first-phase drill program has commenced on Marum's Strike Pointgold property, located adjacent to Harmony Gold's Bissett Mine in Manitoba.
      The drill is currently seeking a westward continuation of the Bissett (formerly San Antonio) mine mineralization that has produced over 1.3 million ounces and that presently contains two million ounces of defined reserves in all categories.
      The second and third drill locations are in an entirely different geological setting, on the north side of the Wanipigau regional fault that extends eastward 130 Kms to the Red Lake gold camp in Ontario. Drill holes will be angled near and under the Vanson and Luana exploration shafts that were sunk over sixty years ago to follow high grade gold zones.


      Marum stakes more claims in Rice Lake Gold Belt, Manitoba
      January 15, 2004 - The size of the Beresford Lake gold property, located 40 Kms southeast of Harmony's Bissett gold mine, has been significantly increased. The acquisition by option of the three “Blue Ace” claims was announced on November 19, 2003. The land package has been expanded by the staking (100% Marum interest) of five new claims, the “Red” Claims, along the west side of the original property. The additional claims are considered essential to cover a suspected gold “accommodation zone” that has yielded surface showing samples up to 12 g/tonne (0.35 oz/t) gold. The gold accommodation zone consists of brittle volcanic rocks that have been sheared and flooded with quartz-carbonate veins. In addition to the presence of gold in surface samples, the current Beresford Lake property exploration program is supported by 2003 field work conducted by the Manitoba Geological Survey that concludes that …“the veins and the regional iron-carbonate alteration zones that host them, are substantially similar to those that host high-grade gold mineralization in the Red Lake gold camp of Ontario.”
      In addition to exploring the Beresford Lake claims, Marum is pursuing two gold plays on its Strike Point property. The first priority is to investigate by drilling the presence of a westward extension of the Bissett Mine gold mineralization across the property boundary onto the Strike Point property. The second play lies to the north and adjacent to the Wanipigau regional fault that extends eastward 130 Kms to the Red Lake gold camp in Ontario. Immediately to the north of the Wanipigau fault, approximately 5 Kms north of the Bissett gold mine, two areas will be drilled near mine shafts that were sunk over sixty years ago and from which high grade samples and limited gold production were obtained.


      1. getting closer on the greens.

        A summary of drill results received to date within the mineralized boundaries of the known Hinge zones is also provided in this press release with results sorted by zone and depth. The Wingold zone results drilled in 2004 have also been included in this summary as this zone has now been determined by San Gold to be a part of the Hinge zone geological and spatial package. The Wingold veins are located approximately 300 meters to the north and east of the Hinge #4 deposit and were partially developed by 2 levels with shaft access in the early 1930's. A limited drill program from surface was conducted by San Gold Resources in 2004 prior to the development of the current Hinge geological model.

        The company is also pleased to announce that Scott Wilson Roscoe Postle Associates Inc. (Scott Wilson RPA) have been retained to audit San Gold's current mineral resource estimate on the high grade Hinge Zone located approximately 1 km from the Rice Lake mill. The Scott Wilson RPA mandate is to perform the audit and to prepare a Summary Technical Report to support the disclosure of an initial mineral resource estimate on the Hinge Zone deposit. The Hinge Zone resource audit will be carried out under the overall supervision of William E. Roscoe, Ph.D., P.Eng., President of Scott Wilson RPA and Consulting Geologist. The Scott Wilson Mining Group, including Scott Wilson Roscoe Postle Associates Inc., is based in Toronto with offices in Canada, the United Kingdom, China, and Zambia. The Mining Group consults to major mining companies, junior mining and exploration companies, financial institutions, governments, law firms and individual investors on all aspects of mining development and operation.



          1. A

            ‘Mineral Resource'

            is a concentration [or occurrence] of material of economic interest in or on the Earth's

            crust in such form, quality and quantity that there are reasonable and realistic prospects for eventual

            economic extraction. The location, quantity, grade, continuity and other geological characteristics of a

            Mineral Resource are known, estimated from specific geological evidence and knowledge, or interpreted

            from a well constrained and portrayed geological model. Mineral Resources are subdivided, in order of

            increasing confidence in respect of geoscientific evidence, into

            Measured, Indicated and Inferred

            categories.

            The ‘

            Measured Mineral Resource

            ' is that part of a Mineral Resource for which tonnage, densities, shape,

            physical characteristics, grade and mineral content can be estimated with a high level of confidence. It is

            based on detailed and reliable exploration, sampling and testing information gathered through appropriate

            techniques from locations such as workings and drill holes. The locations are spaced closely enough to

            confirm geological and grade continuity.

            The ‘

            Indicated Mineral Resource

            ' is that part of a Mineral Resource for which tonnage, densities, shape,

            physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence.

            It is based on exploration, sampling and testing information gathered through appropriate techniques from

            locations such as workings and drill holes. The locations are too widely or inappropriately spaced to confirm

            geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

            The ‘

            Inferred Mineral Resource

            ' is that part of a Mineral Resource for which tonnage, grade and mineral

            content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed

            but not verified geological and/or grade continuity. It is based on information gathered through appropriate

            techniques from locations such as workings and drill holes that may be limited or of uncertain quality and

            reliability.

            A ‘

            Mineral Reserve

            ' is the economically mineable material derived from a Measured and/or Indicated Mineral

            Resource. It is inclusive of diluting materials and allows for losses that may occur when the material is

            mined. The Mineral Reserves are sub-divided in order of increasing confidence into Probable Mineral Reserves

            and Proved Mineral Reserves.

            The ‘

            Probable Mineral Reserve

            ' is the economically mineable material derived from the Indicated Mineral

            Resource. It is estimated with a lower level of confidence than a Proved Mineral Reserve and is inclusive

            of diluting materials and allows for losses that may occur when the material is mined.

            34

            Mineral

            Resources

            Reported as

            mineralisation estimates

            Inferred

            Indicated

            Measured

            Increasing

            level of

            geoscientific

            knowledge

            and confidence

            Probable

            Proved

            Reported as mineable

            production estimates

            Mineral

            Reserves

            Consideration of mining, metallurgical, economic, marketing, legal,

            environmental, social and governmental factors

            (the ‘modifying factors’)

            Exploration

            Results

            35

            ore reserve statement

            reclassify

            3. Competent Persons

            The main principles governing the operation and application of the SAMREC Code are transparency,

            materiality and competence. Transparency requires that the reader of a Public Report is provided

            with sufficient, clear and unambiguous information in order to understand the report and not

            be misled. Materiality requires that a Public Report contains all the information which investors

            and their professional advisers would reasonably require, and reasonably expect to find in the

            report, for the purpose of making a reasoned and balanced judgement regarding the mineralisation

            being reported. Competence requires that the Public Report be based on the work of a suitably

            qualified, responsible and experienced person who is subject to an enforceable professional code

            of ethics.

            The documentation detailing the Mineral Resources and Mineral Reserves estimates has been

            prepared under the direction of Graham Briggs, the company’s competent person for the purposes

            of ore resource and reserve accounting. Mr Briggs is an alternate director of Harmony Gold

            Mining Company Limited. He has a BSc Hons degree in Geology and is a registered Geological

            Scientist (in terms of the Act). He has been a practising geologist for 16 years.

            The shaft Ore Reserve Managers prepared the details of the Mineral Resources and Reserves for

            each shaft. The company’s appointed Ore Reserve Managers all have a geological or mine survey

            background. They are all graduate geologists, technikon diplomates or certified mine surveyors.

            Harmony’s mineral resources and reserves were audited by Venmyn Rand (Pty) Limited to

            investigate and ensure that the mineral resources and reserves are in all respects compliant with

            the specifications embodied in the SAMREC Code. Their conclusion is as follows:

            “Having reviewed the procedures and practices adopted by Harmony to categorise and calculate

            the company's mineral resources and mineral reserves, we are satisfied that these are compliant

            with the requirements of the SAMREC Code."

            The ‘

            Proved Mineral Reserve

            ' is the economically mineable material derived from the Measured

            Mineral Resource and is estimated with a high level of confidence. It is inclusive of diluting

            materials and allows for losses that may occur when the material is mined.

            The ‘

            Measured and Indicated Mineral Resources

            ’ are inclusive of those Mineral Resources

            modified to produce the Mineral Reserves.

            Grade Tonnage Curve

            Tonnes Million & Average Grade

            tonnes

            - 0