No Nicholas Lake ore will be processed

Tyhee's cover letter to the remaining Information Request responses (http://www.reviewboard.ca/upload/project_document/EA0809-003_Cover_Letter_-_Responses_to_IR_s_March_28__2012.PDF) includes the following passage.

"Nicholas Lake, originally planned to provide approximately 25% of the YGP mill
feed has, after some investigations by the Feasibility Study Team been removed
from the current mine plan, a decision primarily related to the higher
concentrations of Arsenic in the Nicholas Lake ore, which would needlessly
complicate the submittal since Ormsby is the main focus of our actions. .
Removing Nicholas Lake ore from the overall YGP mill throughput significantly
reduces or eliminates potential environmental effects associated with Arsenic."

That may make permitting easier, but would seem to drop total gold production (all else being equal).

Join the conversation about Tyhee Gold Corp.

Reply

Replies

  1. "The Feasibility Study Team is continuing its work and there may be other minor changes to the project components, however; the points made (below) are seen to the changes that both enhance project economics and also improve interactions and reduce potential environmental effects from the YGP."

    http://www.reviewboard.ca/upload/project_document/EA0809-003_Cover_Letter_-_Responses_to_IR_s_March_28__2012.PDF

    During the Board’s site tour we presented a summary of what the project was and how

    the Feasibility Study that was and remains underway, had identified minor modifications

    to some project components that would both enhance project economics and reduce

    perceived environmental effects from the YGP. When asked if these changes would

    affect the overall EA schedule, the Board’s response was

    NO, and they would prefer to

    carry out the EA of the YGP based on the most current operating scenario. Tyhee NWT

    Corp very much appreciated this decision and support from the Board members and

    Board staff. The modifications to the project operating scenario can be seen on the

    attached Figure and summarized as follows:

    Nicholas Lake, originally planned to provide approximately 25% of the YGP mill

    feed has, after some investigations by the Feasibility Study Team been removed

    from the current mine plan, a decision primarily related to the higher

    concentrations of Arsenic in the Nicholas Lake ore, which would needlessly

    complicate the submittal since Ormsby is the main focus of our actions. .

    Removing Nicholas Lake ore from the overall YGP mill throughput significantly

    reduces or eliminates potential environmental effects associated with Arsenic.

    The proposed Winter Lake Tailings Containment Area (TCA) would, through the

    Feasibility Study be reexamined and redesigned to better handle the tailings that

    are expected from the YGP. The TCA has been divided into three cells, two of

    which (North and South Cells) would be the recipient areas for the more benign

    floatation tails and the central cell would be the recipient of the Cyanide Leached

    Tailings which would be deposited sub-aqueously.

    Waste Rock from the Ormsby Open Pit, originally proposed for disposal in the

    Ormsby Valley West of the Open Pit has, after review by the Feasibility Study

    Team been revised to place waste rock on the North and South edges of the

    Tailing Containment Area. This would include covering Round Lake and a small

    portion on the southern end of the Historic Discovery Mine Tailings Cap as well

    as an area between Winter Lake and Narrow Lake. Drainage will be directed to

    either sediment controls structures or into the TCA depending on expected water

    quality and quantity.